ID Name Unit Tasks Target Date Progress(%) Date Accomplished Remarks Update
55 ESPADERA, MA LOURDES PLANNING Checking and filing of geotag photos of the established control points in Pagan SRIP January 29, 2024 100 June 13, 2024
 
56 ESPADERA, MA LOURDES PLANNING Updating of JO Personnel Attendance January 29, 2024 100 January 31, 2024 "Other Accomplishment: *Identify Location of 2 LUC Applied Areas *Labelling of Sitio Lenna SIP Profile *Attended Flag Ceremony and Pagpupugay at Pasasalamat for Engr. Opiano *Prepare Survey Team Travel Documents *Prepared workplan for FY 2025 Projec
 
57 ESPADERA, MA LOURDES PLANNING Generating of Profile and Cross Section for Lat B and B1 January 29, 2024 100 February 6, 2024 "Other Accomplishment: *Identify Location of 2 LUC Applied Areas *Labelling of Sitio Lenna SIP Profile *Attended Flag Ceremony and Pagpupugay at Pasasalamat for Engr. Opiano *Prepare Survey Team Travel Documents *Prepared workplan for FY 2025 Projec
 
58 ESPADERA, MA LOURDES PLANNING Generating of Profile and Cross Section for Lat B2, B3 and B3-A January 30, 2024 100 N/A * Prepare TEV of Survey Personnel for the month of January * Prepare Padada RIS Modernization 1ST WEEK SURVEYED DRAINAGE LINE data - ready for plotting and labelling * Imported Remaining Survey Points of Canal Network
 
59 ESPADERA, MA LOURDES PLANNING Updating of Survey Team Schedule January 30, 2024 100 N/A Other Accomplishment: *Update Daily PRIS Survey Team Accomplishment
 
60 ESPADERA, MA LOURDES PLANNING Generating of Profile and Cross Section for Lat Aa, Lat B4 and SKLA January 31, 2024 70 N/A
 
61 ESPADERA, MA LOURDES PLANNING Generating of Profile and Cross Section for Parat RMC, Parat LMC, SMIA Canals February 1, 2024 100 February 8, 2024
 
62 ESPADERA, MA LOURDES PLANNING Checking of Survey Team DTRs and WARs February 1, 2024 100 February 2, 2024
 
63 ESPADERA, MA LOURDES PLANNING Prepare Payroll of JO Personnel February 1, 2024 100 February 2, 2024
 
64 ESPADERA, MA LOURDES PLANNING Checking and Polishing PRIS Levelling Data February 2, 2024 20 N/A
 
65 ESPADERA, MA LOURDES PLANNING Plotting of Badagoy CIS FY 2025 February 2, 2024 45 N/A
 
66 ESPADERA, MA LOURDES PLANNING Prepare Actual TEV from January 15 to January 26 February 2, 2024 100 N/A
 
67 ESPADERA, MA LOURDES PLANNING Updating of Survey Team Schedule February 2, 2024 100 February 2, 2024
 
68 EUGENIO, VENANN PLANNING Attend flag raising ceremony January 29, 2024 100 January 29, 2024 Completed
 
69 EUGENIO, VENANN PLANNING Prepare Summary of CIS Lined and Unlined Canal Lengths January 29, 2024 100 January 29, 2024 Completed
 
70 EUGENIO, VENANN PLANNING Check/monitor the status of digitized layout maps updating January 29, 2024 100 January 29, 2024 - Prepare travel documents for the inspection at Miral SRIS
 
71 EUGENIO, VENANN PLANNING Workout the comments of CO on the hydrological aspect of Padada RIS Modernization January 29, 2024 100 N/A - Prepare travel documents for the inspection at Miral SRIS
 
72 EUGENIO, VENANN PLANNING Conduct inspection at Miral SRIS Spillway/Reservoir January 30, 2024 100 January 30, 2024 Completed
 
75 EUGENIO, VENANN PLANNING Attend meeting at Baranggay Poblacion Dos, Bansalan, Davao del Sur January 30, 2024 100 January 30, 2024 Completed
 
76 EUGENIO, VENANN PLANNING Prepare project validation schedule (FY 2025 and 10-year plan) January 31, 2024 100 February 2, 2024 Completed
 
77 EUGENIO, VENANN PLANNING Prepare DTR and weekly accomplishment report January 31, 2024 100 January 31, 2024 Completed
 
78 EUGENIO, VENANN PLANNING Travel to R13 Caraga for RIMP Cluster Workshop January 31, 2024 100 January 31, 2024 Completed
 
79 EUGENIO, VENANN PLANNING Attend RIMP Cluster Workshop at R13 Caraga February 1, 2024 100 February 1, 2024 Completed
 
92 ENCABO, PRINCESS SHAIRA MAE PLANNING Submit the additional requested personnel for PRIS and MRIS implementation. January 29, 2024 100 January 29, 2024 * Already received the approved request for additional personnel (Tree Guard Preparation Personnel). * Additional request for Year 2 Landowners from Brgy. Langa-an waiting for approval.
 
93 ENCABO, PRINCESS SHAIRA MAE PLANNING Finalize PRIS and MRIS IWRMP Annual Accomplishment Report Year 1. January 29, 2024 100 January 29, 2024 Submitted to Planning Unit Head MLCJ, for corrections and finalization of document.
 
96 INTO, LEE WARREN PLANNING Prepare Material Test Reports with transmittal January 30, 2024 100 January 30, 2024
 
97 INTO, LEE WARREN PLANNING Convergence Report for the month of January February 2, 2024 100 January 29, 2024
 
98 INTO, LEE WARREN PLANNING Printing and submitting of Dakinus Lateral B (Correction) w/ transmittal January 31, 2024 100 January 31, 2024
 
99 INTO, LEE WARREN PLANNING Schematic Diagram for Padada RIS Main Canal February 3, 2024 100 January 31, 2024
 
100 INTO, LEE WARREN PLANNING Schematic Diagram for Padada RIS Lateral AA February 3, 2024 100 January 31, 2024
 
101 INTO, LEE WARREN PLANNING Schematic Diagram for Padada RIS Lateral A February 3, 2024 100 February 1, 2024
 
102 INTO, LEE WARREN PLANNING Schematic Diagram for Padada RIS Lateral A1 February 3, 2024 100 February 1, 2024
 
103 INTO, LEE WARREN PLANNING DE POW for PAGAN SRIP, Marilog District, Davao City February 3, 2024 100 February 2, 2024
 
113 ENCABO, PRINCESS SHAIRA MAE PLANNING Oversee the status of ongoing plantation at Padada RIS. January 29, 2024 100 January 29, 2024 Plantation activities and ongoing site preparation for the additional areas. - For Year 1: Continuous maintenance and protection. - For Year 2: Site preparation (Site clearing/Planting distance/Staking)
 
115 ENCABO, PRINCESS SHAIRA MAE PLANNING Oversee the Year 1 Maintenance and Protection Activities at Padada RIS. January 29, 2024 100 January 29, 2024 Continuous watering activity on-site for Year 1 plantations and maintenance of PRIS nursery.
 
116 CAYABYAB, REY JIM PLANNING Prepared Back-to-Office Report on Focus Group Discussion on Suawan SRIP FS January 29, 2024 100 February 2, 2024 Revised in accordance with the corrections and submitted the final report.
 
117 ENCABO, PRINCESS SHAIRA MAE PLANNING Updating of Year 1 and 2 Personnel Schedule of Activities. January 30, 2024 100 January 30, 2024 Schedule of activities were sent to the personnel on-site to serve as their basis of their activities.
 
118 ENCABO, PRINCESS SHAIRA MAE PLANNING Updating of maps of Year 1 and 2 IWRMP Plantation Establishment January 30, 2024 100 January 30, 2024 Printed maps were submitted to the Planning Unit Head for signing.
 
119 ENCABO, PRINCESS SHAIRA MAE PLANNING Finalize PRIS and MRIS IWRMP Annual Accomplishment Report Year 2. January 31, 2024 100 January 31, 2024 Submitted to Planning Unit Head MLCJ, for corrections and finalization of document.
 
120 ENCABO, PRINCESS SHAIRA MAE PLANNING Updated the inventory of delivered seedlings in PRIS plantation sites. January 31, 2024 100 January 31, 2024 Updated the excel for the inventory of seedlings.
 
121 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare DTR and WAR. February 1, 2024 100 February 1, 2024 Completed and submitted.
 
126 CAYABYAB, REY JIM PLANNING Labeled Sitio Lenna Lat. A-1R (MC1), Lat. A-2r, and MC1-1R January 29, 2024 100 January 29, 2024
 
128 CAYABYAB, REY JIM PLANNING Labeled and Plotted DRC of Padada River Irrigation System (Length = 4256.89 meters) January 30, 2024 100 January 30, 2024
 
129 CAYABYAB, REY JIM PLANNING Labeled and Plotted DRD Special of Padada River Irrigation System (Length = 1,068.56 meters) January 31, 2024 100 January 31, 2024
 
130 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare Payroll of JO Personnel of PRIS (Year 1) February 1, 2024 100 February 1, 2024 Completed and submitted.
 
131 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare Payroll of JO Personnel of PRIS (Year 2) February 1, 2024 100 February 5, 2024 For signing. Other accomplishment: Delivered seedlings and drums for Year 2 Plantation Establishment & monitoring of tree guard preparation.
 
132 ENCABO, PRINCESS SHAIRA MAE PLANNING Update with Mal RIS personnel the status of Implementation for MRIS Plantation Sites for Year 1 and 2 February 2, 2024 100 February 2, 2024 As per Mal RIS personnel report: On-going delivery of seedlings for Year 2 Implementation. Updates for Year 1 are to be complied after delivery.
 
133 ENCABO, PRINCESS SHAIRA MAE PLANNING Update of accomplishment per plantation areas (PRIS and MRIS) February 2, 2024 100 February 2, 2024 Updated the monitoring sheet per plantation areas.
 
134 ENCABO, PRINCESS SHAIRA MAE PLANNING Monitoring of the accomplishment of JO personnel onsite. February 2, 2024 100 February 2, 2024 * On-going tree guard preparation. * On-going plantation activities for Brgy. Clib (Year 2) * On-going site preparation for additional land areas in Brgy. Langa-an, Matanao ,DDS (Year 2)
 
135 CUICO, JHO-ANN A. PLANNING Attended flag raising ceremony January 29, 2024 100 January 29, 2024 COMPLETED
 
136 CUICO, JHO-ANN A. PLANNING Prepared Summary of CIS Lined and Unlined Canal Lengths February 2, 2024 100 January 29, 2024 COMPLETED
 
137 CUICO, JHO-ANN A. PLANNING TROUBLESHOOT NIS PER CY MAL RIS February 2, 2024 100 January 30, 2024 COMPLETED
 
138 CUICO, JHO-ANN A. PLANNING TROUBLESHOOT NIS PER CY PADADA RIS February 2, 2024 100 January 31, 2024 Additional actual Accomplishments: Received, Record, Reproduce, Field and distribute engineering Documents, Input Data to LUC log book (O&M)
 
139 HERNAN, ALDEN PLANNING Design and drafting Bolo-bolo SIP RMPC3: Identification of pipe support along a particular stretch for the station of 0+000.00 to 0+799.05, edit and tagging of RMPC3 profile January 29, 2024 85 N/A Submitted to the Design Unit Head for checking and review, Inserted work: (1) Reproduction of Cogon Bacaca docuents for IDU copies,(2) update NCIP for FPIC status, (3) communication w/ BLGU cogon Bacaca for schedule of the special session (4) Revision o
 
140 CUICO, JHO-ANN A. PLANNING Prepared Layout maps for KISULAN SPIP Feasibility Study: LAND USE MAP, LAND CLASS, LOCATION MAP February 2, 2024 100 February 1, 2024 COMPLETED
 
141 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents February 2, 2024 100 February 1, 2024 COMPLETED
 
142 CUICO, JHO-ANN A. PLANNING Input Data to LUC tracker (O&M) February 2, 2024 100 February 1, 2024 COMPLETED
 
143 HERNAN, ALDEN PLANNING Design and drafting Bolo-bolo SIP LMPC3-LAT.A: Identification of pipe support along a particular stretch for the station of 0+000.00 to 0+799.05, edit and tagging of RMPC3 profile January 30, 2024 85 N/A Inserted work/activities: (1)Drafting of checked/reviewed RMPC-3, (2) Finalize reviewed draft of Community- Based Proposal
 
145 HERNAN, ALDEN PLANNING Drafting of letter requesting for ADSDPP plan to NCIP-Davao del Sur January 31, 2024 100 N/A a.Submitted to planning unit head, for review and checking, b.Inserted work/activities: (1)Attend special session at Cogon Bacaca Brgy. Hall for the community-based, meeting matters, (2) submitted communication letters to MAO- Padada and MAO-Sulop, (
 
146 HERNAN, ALDEN PLANNING Prepare minutes of the conducted special meeting of Cogon Bacaca,Prepare Presentation (powerpoint) of the project background for Community-based meeting February 2, 2024 100 N/A b.Inserted work/activities: (1)Coordination with property and procurement unit for the conduct of communit-based meeting, (2) Brief orientation of WAR computer program manipulation, (3) Prepare DTR and other related attchment documents (4) Revision of Pla
 
147 CUICO, JHO-ANN A. PLANNING Prepared Layout maps for KISULAN SPIP Feasibility Study: SOIL MAP, GENERAL LAYOUT MAP, DRAINAGE AREA MAP February 2, 2024 100 February 2, 2024 COMPLETED
 
148 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents February 2, 2024 100 February 2, 2024 COMPLETED
 
149 CUICO, JHO-ANN A. PLANNING Input data to inventory Tracker (COMPLETED Work items, Reported as of 02-022023): Reported as of 02-022023) : MALIGAYA CIS (FAW) KILOLOG CIS, BALUTAKAY CIS, BANGKAL CIS, MALRIS (LMC-DS-2023-27), LACSON CIS, PADADA RIS, UNIFARM CIS, Bala-Kanapulo CIS, February 2, 2024 100 February 2, 2024 COMPLETED
 
152 CAYABYAB, REY JIM PLANNING Labeled and Plotted DRA of Padada River Irrigation System (Length = 5,058.33 meters) January 31, 2024 100 January 31, 2024
 
153 CAYABYAB, REY JIM PLANNING Labeled and Plotted DRM5 of Padada RIS (Length = 2,427.75 meters) February 1, 2024 100 February 1, 2024
 
154 CAYABYAB, REY JIM PLANNING Labeled and Plotted DRM4 of Padada RIS (Length = 1,418.06 meters) February 1, 2024 100 February 1, 2024
 
155 CAYABYAB, REY JIM PLANNING Labeled and Plotted DRB1 of Padada RIS (Length = 1,553.87 meters) February 1, 2024 100 February 1, 2024
 
156 CAYABYAB, REY JIM PLANNING Labeled and Plotted DRB of Padada RIS (Length = 2,553.26 meters) February 1, 2024 100 February 1, 2024
 
157 CAYABYAB, REY JIM PLANNING Labeled and Plotted DRM of Padada RIS Length = 824.72 meters) February 1, 2024 100 February 1, 2024
 
163 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony. January 29, 2024 100 N/A Completed
 
164 SASUMAN, MARY LOUISE J. PLANNING Finalize the service area of the list of proposed SPIP based on the conducted survey as per Engr. Espadera for CNC Application January 31, 2024 100 January 30, 2024 Other accomplishment: Attended exit meeting via zoom with the CO and RO personnel on the conducted WPT in Cogon Bacaca SRIP.
 
166 SASUMAN, MARY LOUISE J. PLANNING Prepare and submit SALN and updated PDS January 31, 2024 100 January 29, 2024 Completed
 
168 SASUMAN, MARY LOUISE J. PLANNING Apply online CNC on Bagumbayan SPIP, New Katipunan SPIP, Tacul Laya SPIP, Basiawan SPIP, Kibangay Creek-Kibanagay SPIP, New Sibonga SPIP, Admol Spring-Asinan SPIP, and Marber River-Lower Marber SPIP February 2, 2024 70 January 31, 2024 Waiting for the signed Sworn Statement to commence for the next step on the online CNC application
 
169 CAYABYAB, REY JIM PLANNING Labeling and plotting of Lat. AA of Padada River Irrigation System (Length = 3,478.99 meters) February 2, 2024 100 February 2, 2024
 
170 SASUMAN, MARY LOUISE J. PLANNING Prepare FSR on Basiawan SPIP specifically Chapter 6: Geology and its sub-sections of the report February 2, 2024 100 N/A Completed. Started on Feb. 1, 2024 the write-ups on .4, 6.5,6.5.1, 6.5.1.1,6.5.1.2,and 6.5.1.3.
 
171 CAYABYAB, REY JIM PLANNING Plotting of Parat LMC - Left Side (Length = 992.63 meters) February 2, 2024 100 February 2, 2024
 
173 SASUMAN, MARY LOUISE J. PLANNING Prepare FSR on Basiawan SPIP specifically Chapter 9: Environmental and Social Assessment and sub-sections of the report February 2, 2024 80 February 2, 2024 Other Accomplishment: Started Feb.1, 2024 preparing Basiawan SPIP FS Report specifically in Chapter 9 which includes Sections 9.1, 9,2.1,9.2.2,and 9.2.3; Read TOR of Suawann SRIP and pepared reply letter to CEST Consultants relative to the requested data
 
174 SASUMAN, MARY LOUISE J. PLANNING Update and orient Weekly Accomplishment Report from old to new system February 2, 2024 100 February 2, 2024 Completed; new system of Weekly Accomplishment Report is being utilized; prepared and submitted WAR and DTR on Feb. 1, 2024
 
182 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents January 29, 2024 100 January 29, 2024 COMPLETED
 
185 EUGENIO, VENANN PLANNING Travel back to NIA DDS IMO February 2, 2024 100 February 2, 2024 Completed
 
187 LUARDO, GLENN D. PLANNING Prepare FS Report for Basiawan SPIP (Conduct Agro-Socio Economic Survey and Drone Activity) January 31, 2024 100 February 1, 2024 Actual Accomplishment: The original schedule of the activity was moved due to bad weather condition. Actual Accomplishments: Prepare FS Report for the Proposed Kisulan SPIP, Prepare Layout Map of the proposed Basiawan SPIP in reference to the conduct of
 
190 CUICO, JHO-ANN A. PLANNING Prepared Layout Map of UNIFARM CIS for POW attachment: Sta: Lateral A2 Canal 0+131.57 - 0+344.07, Lateral A 2+659.20 - 2+699.20 and 2+711.90 - 2+843.52, Main Canal (chck. struct.) 0+103.68 - 0+155.08 and 0+158.08 - 0+184.08, Main Canal (Valdez Chk.) 0+18 February 2, 2024 100 February 2, 2024 COMPLETED
 
192 LUARDO, GLENN D. PLANNING Prepare and Submit BTOR of FGD for Suawan SRIP FS January 29, 2024 100 February 2, 2024 Revised in accordance with the corrections and submitted the final report. Other Accomplishments: Prepare SALN and PDS for CY 2023, Prepare FS Report for the proposed Kisulan SPIP
 
198 LUARDO, GLENN D. PLANNING Prepare FS Report for the proposed Kisulan SPIP January 30, 2024 100 January 31, 2024 Revised in accordance with the corrections and submitted the final report. Other Accomplishments: Prepare Bolo-bolo SPIP Layout Map with CADT Area layer, Revise prepared BTOR of FGD attended for Suawan SRIP FS
 
200 LUARDO, GLENN D. PLANNING Submit Hard and Electronic copy of FS Report for Kisulan SPIP @ NIA RIO XI February 2, 2024 100 February 2, 2024 Hard copy for signature and scan before submitting to NIA RIO XI
 
202 INTO, LEE WARREN PLANNING SUAWAN SRIP DE POW for CY2025 February 9, 2024 100 February 13, 2024 Fully accomplished draft For checking. For confirmation by supervisor whether to continue finalizing Suawan DE POW. (paused for now)
 
203 INTO, LEE WARREN PLANNING Schematic Diagram for Padada RIS Lateral B February 9, 2024 100 February 7, 2024
 
205 INTO, LEE WARREN PLANNING PERT-CPM for Mal RIS (EGPIP) (20M) February 9, 2024 100 February 7, 2024 Prepared and produced 5 copies for the assigned programmer.
 
207 INTO, LEE WARREN PLANNING Schematic Diagram for Padada RIS Lateral B2 February 9, 2024 100 February 8, 2024
 
208 INTO, LEE WARREN PLANNING Schematic Diagram for Padada RIS Lateral B3 February 9, 2024 100 February 8, 2024
 
211 INTO, LEE WARREN PLANNING Schematic Diagram for Padada RIS Lateral B4 February 9, 2024 100 February 12, 2024
 
212 INTO, LEE WARREN PLANNING Schematic Diagram for Padada RIS Lateral B1 February 9, 2024 100 February 8, 2024
 
248 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare payroll for Mal RIS Year 1 & 2 Personnel February 5, 2024 100 February 5, 2024 Already submitted.
 
249 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate fertilizer application for Year 1 areas. February 5, 2024 100 February 5, 2024 Completed fertilizer application for Year 1 Plantation areas.
 
250 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of POW for IWRMP Padada - Year 3 February 6, 2024 100 February 6, 2024 Feb. 6, 2024 Other accomplishment: - Prepared the corrected payrolls for Mal RIS personnel (Year 1 & 2). - Monitored and gathered updates for Mal RIS Plantation establishment.
 
252 ENCABO, PRINCESS SHAIRA MAE PLANNING Delivery of seedlings and fertilizers for Year 2 areas February 6, 2024 100 February 6, 2024 Completed delivery for Brgy. Clib, Hagonoy, DDS.
 
267 SASUMAN, MARY LOUISE J. PLANNING Prepare FSR on Basiawan SPIP specifically Chapter 9: Environmental and Social Assessment February 9, 2024 100 February 5, 2024 On Feb. 5, 2024 already completed the remaining discussion in Chapter 9 on Basiawan SPIP which includes 9.2.4,9.2.5,9.2.6,9.2.7,9.2.8,9.3, and 9.4 and attended flag raising ceremony
 
268 SASUMAN, MARY LOUISE J. PLANNING Conduct Water Pressure Test (WPT) in Cogon Bacaca SRIP February 6, 2024 100 February 8, 2024 On Feb. 6, 8, 10, 2024 completed the conduct of WPT and terminated BH 13; Other accomplishment: Already accomplished 35% (write-ups on Chapter 7: Surveying and Mapping - 7.1, 7.2, and 7.2.1 on Basiawan SPIP FSR);
 
269 LUARDO, GLENN D. PLANNING Prepare BTOR for the conducted Agro-socio Economic Activity and Drone Survey last February 1, 2024 @ the proposed Basiawan SPIP. February 5, 2024 100 February 5, 2024 Actual Accomplishments: Prepared 100% of Tables 1,2,3,4,5, and 6 for the proposed Basiawan SPIP Project.
 
271 SASUMAN, MARY LOUISE J. PLANNING Prepare Impact Management Plan (IMP) as per CO's comment in Padada RIS Modernization FSR February 9, 2024 5 February 8, 2024 Other Accomplishment: On Feb. 7, 2024, Already accomplished 100% of Basiawan SPIP FSR write-ups on Chapter 7: Surveying and Mapping - 7.1, 7.2, 7.2.1, 7.2.2 and 7.3. Also, accomplished 100% in Chapter 5: Hydrology write-ups specifically, 5.1,5.1.1,5.1.2,5
 
273 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony February 5, 2024 100 February 5, 2024
 
274 CUICO, JHO-ANN A. PLANNING Updating layout maps as per Cy 2023 completed Projects (KAWAYAN CIS, LOS AMIGOS CIS, Calinan Rice Farmers Association (CARFA) SIS) February 8, 2024 100 February 5, 2024 COMPLETED
 
275 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents February 8, 2024 100 February 5, 2024 COMPLETED
 
276 EUGENIO, VENANN PLANNING Workout the comments of CO on the hydrological aspect of Padada RIS Modernization February 8, 2024 100 N/A Feb. 5, 2024 - Attend flag-raising ceremony; 100%-Miral SRIS payroll for signature; 100%-Edit Mal RIS POW 15M; 30%-Prepare Hydrological Analysis of Basiawan SPIP Feb. 8, 2024: 100%-Edit Mal RIS POW 15M as per RIO comment
 
277 CUICO, JHO-ANN A. PLANNING Attended flag raising ceremony February 5, 2024 100 February 5, 2024 COMPLETED
 
279 INTO, LEE WARREN PLANNING Attend the Flag Ceremony February 5, 2024 100 February 5, 2024
 
281 EUGENIO, VENANN PLANNING Prepare Hydrological Analysis of Basiawan SPIP February 7, 2024 100 February 7, 2024 February 5, 2024: 10%-Preprared the Cropping Calendar of Cacao February 6, 2024: 100%- Prepared the Cropping Calendar for Cacao; 20%-Prepared the Cropping Calendar for Coconut February 7, 2024: 100%-Completed the cropping calendar of Basiawan SPIP for C
 
286 EUGENIO, VENANN PLANNING Inventory Form and MC 91 Report of Miral SRIS February 6, 2024 100 February 6, 2024 Completed
 
287 LUARDO, GLENN D. PLANNING Prepare FSR on Basiawan SPIP specifically Chapter 4 AGRICULTURE. February 6, 2024 100 February 6, 2024 Actual Accomplishments: Prepare 100% of Tables 6,8,9,10,11, and 12 with write-ups for the proposed Basiawan SPIP Project.
 
289 CAYABYAB, REY JIM PLANNING Prepare FSR on Basiawan SPIP specifically Chapter 8: Engineering Plans, Designs, and Estimates February 9, 2024 100 February 6, 2024 On February 5, 2024 - Already accomplished 60% (Write-ups on Chapter 8.1, 8.2, 8.3, 8.4, 8.5.1, and 8.5.2) and attended flag raising ceremony. On February 6, 2024 - Accomplished 100% (Prepared Table 8.1 & 8.2)
 
290 INTO, LEE WARREN PLANNING Costing of FSDE Funds February 9, 2024 100 February 8, 2024
 
291 CAYABYAB, REY JIM PLANNING Prepare FSR on Basiawan SPIP specifically Chapter 4: Agriculture February 9, 2024 100 February 7, 2024 On February 5, 2024 - Already accomplished 15% (Write-ups on Chapter 4.1 and 4.1.1) On February 6, 2024 - Already accomplished 75% (Write-ups on Chapter 4.1.2, 4.1.3, 4.1.4, 4.1.5, 4.2.1, 4.2.2, 4.2.3, 4.2.5, 4.3, and 4.4). On February 7, 2024 - Complete
 
296 LUARDO, GLENN D. PLANNING Prepare FSR on Basiawan SPIP specifically Chapter 10 ECONOMIC AND FINANCIAL EVALUATION. February 9, 2024 100 February 8, 2024 On February 7, 2024 - Completed Tables 13,14,15,16, and 17 with write-ups for the Proposed Basiawan SPIP Project. On February 8, 2024 - Completed Tables 7,27, and 28 and submitted final FS Draft of the proposed Basiawan SPIP Project.
 
297 ESPADERA, MA LOURDES PLANNING Prepared Monitoring of Surveyed and Plotted Items of Mal RIS in preparation for Modernization February 5, 2024 100 February 5, 2024
 
300 HERNAN, ALDEN PLANNING Communicate and Coordinate Brgy. Secretary for the the status of participants (landowners, gov't agencies) and Prepare necessary materias/documents for Community-Based Public Meeting (prepare attendance sheets, prepare 'permit to enter', certif February 5, 2024 100 February 5, 2024 completed
 
302 CUICO, JHO-ANN A. PLANNING Updating layout maps as per Cy 2023 completed Projects (SAN AGUSTIN CIS, BALASIAO CIS, BONIFACIO CIS) February 9, 2024 100 February 7, 2024 Additional Accomplishments Received, Record, Reproduced Engineering Documents, Input Data to LUC Google sheet (O&M), 100% Prepared Layout maps for BASIAWAN SPIP Feasibility Study Report (GENERAL LAYOUT MAP, LOCATION MAP, PRELIMINARY BASE MAP)
 
304 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW attachment of PAGAN SRIP, SUAWAN SRIP February 9, 2024 100 February 6, 2024 COMPLETED
 
311 INTO, LEE WARREN PLANNING PERT-CPM for MIRAL SRIS EGPIP (10M) February 9, 2024 100 February 7, 2024 Prepared and produced 5 copies for the assigned programmer.
 
314 INTO, LEE WARREN PLANNING Attend Virtual Budget Forum (02/06/2024) February 6, 2024 100 February 6, 2024
 
316 INTO, LEE WARREN PLANNING Prepare PERT-CPM for MOAB CREEK-MOAB SIP February 9, 2024 100 February 7, 2024 Prepared and produced 5 copies for the assigned programmer.
 
318 EUGENIO, VENANN PLANNING Consolidate comments of CO on the 1st and 2nd RIMP Cluster Workshop February 7, 2024 100 February 6, 2024 Completed
 
319 CUICO, JHO-ANN A. PLANNING Prepared layout Map for POW Attachment of miral - egpip cy 2024 (LAMACIA IA) February 9, 2024 100 February 6, 2024 COMPLETED
 
320 CUICO, JHO-ANN A. PLANNING Prepared Location for Turn Over Attachment (LANURO CIS) February 9, 2024 100 February 6, 2024 COMPLETED
 
321 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for BASIAWAN SPIP - FSR (Liquefaction Hazard Map, Ground Rupture Hazard Map) February 9, 2024 100 February 6, 2024 COMPLETED
 
322 CAYABYAB, REY JIM PLANNING Prepare FSR on Basiawan SPIP specifically Chapter 5.2: Irrigation Water Requirement February 9, 2024 100 February 7, 2024
 
356 ENCABO, PRINCESS SHAIRA MAE PLANNING Delivery of seedlings for Brgy. Langa-an and Brgy. San Miguel, Matanao as part of Year 2 Implementation. February 7, 2024 100 February 7, 2024 Some seedlings delivered were damaged and were already replaced.
 
358 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of payroll of Year 2 Landowners (Brgy. Langa-an, Matanao, Davao del Sur). February 7, 2024 100 February 7, 2024 The payroll was prepared late due to late submission of DTRs.
 
359 ENCABO, PRINCESS SHAIRA MAE PLANNING Supervision of inventory of survival rate for Year 1 Plantation Establishment. February 7, 2024 100 February 7, 2024 Updated the lists of inventory of Year 1 Survival and Mortality Rate.
 
360 ENCABO, PRINCESS SHAIRA MAE PLANNING Supervision of tree guards preparation at Padada RIS office to be used in Year 2 Plantation. February 7, 2024 100 February 7, 2024 On-going preparation of tree guards, with a maximum of 80 sets of tree guards prepared per day.
 
362 HERNAN, ALDEN PLANNING Attend/facilitate the conduct of community-based public meeting at Cogon Bacaca, Kiblawan for Cogon Bacaca SRIP February 6, 2024 100 February 6, 2024 Completed
 
363 SASUMAN, MARY LOUISE J. PLANNING Finalized and print Basiawan SPIP FSR February 9, 2024 100 February 8, 2024 Other Accomplishment: On Feb. 7, 2024 already accomplished 100% in proofreading and finalization of Chapters 1,2, and 3 of Basiawan SPIP FSR;
 
366 ENCABO, PRINCESS SHAIRA MAE PLANNING Monitor ongoing progress for Year 1 &2 Plantation Establishment at Padada RIS February 8, 2024 100 February 8, 2024 Watering activities for Year 1 & 2 Plantations.
 
369 INTO, LEE WARREN PLANNING Made few corrections over the Design Plans of Sitio Lenna SIP Service Roads Sta 0+000.00 to Sta 0+610.00 February 9, 2024 100 February 9, 2024 Changed RCP Diameter from 24" to 36". Submitted with transmittal.
 
370 HERNAN, ALDEN PLANNING Design and Drafting of Bolo-bolo SIP RMPC3 AND LMPC3-LAT. A, Drafting of irrigation network February 7, 2024 100 February 7, 2024 completed: for printing
 
375 ENCABO, PRINCESS SHAIRA MAE PLANNING Tabulate and summarize the results of water quality tests for PRIS Modernization. February 8, 2024 100 February 8, 2024 Tabulated data and provided write-ups as per comments on the PRIS Modernization.
 
377 CAYABYAB, REY JIM PLANNING Prepare List of References of Basiawan SPIP FSR February 9, 2024 100 February 8, 2024
 
380 CAYABYAB, REY JIM PLANNING Prepare updated 2024 projects description and indicators and prepare powerpoint presentation February 8, 2024 100 February 8, 2024 Other accomplishments: Prepare travel request for the field validation with the consultant of Pagan SRIP on February 12, 2024
 
391 EUGENIO, VENANN PLANNING Reproduce and distribute CO comments on the RIMP to the PIMP writers and data preparers February 12, 2024 100 February 12, 2024 Completed.
 
392 EUGENIO, VENANN PLANNING Prepare a communication letter to BSWM for the request of soil data February 12, 2024 100 February 12, 2024 Feb. 12, 2024 - Submitted to MLCJ for checking.
 
393 EUGENIO, VENANN PLANNING Attend workshop on generating PIA using the NIMP data February 14, 2024 100 February 14, 2024 Completed
 
394 EUGENIO, VENANN PLANNING Attend workshop on generating PIA using the NIMP data February 15, 2024 100 February 15, 2024 Completed
 
395 EUGENIO, VENANN PLANNING Attend workshop on generating PIA using the NIMP data February 16, 2024 100 February 16, 2024 Completed
 
397 EUGENIO, VENANN PLANNING Print and submit MC 91 report of Miral SRIS Inventory February 13, 2024 100 February 12, 2024 Feb. 12, 2024 - Submitted to MLCJ for checking
 
398 HERNAN, ALDEN PLANNING Draft Back-To-Office -Report of the conducted Community-Based Meeting, February 8, 2024 50 N/A Inserted Activities: Conduct Water Pressure Test for Cogon Bacaca
 
399 CUICO, JHO-ANN A. PLANNING Prepare layout Map for Turn over documents Attachments (TITUGOP CIS, BPANAGLIB, WANGAN CIS) February 8, 2024 100 February 12, 2024 TARGET TO ACCOMPLISHED (02-12-2023) Actual Accomplishments: Prepared Layout Maps for BASIAWAN SIP Feasibility Study Report (Administrative Map, Land use Map, Tsunami Hazard Map, Ground Shaking Hazard Map), Received, Record, Reproduce Engineering Document
 
400 ESPADERA, MA LOURDES PLANNING Monitoring and Update Accomplishment of Survey Team (Mal RIS, Padada RIS and Pagan SRIP) February 5, 2024 100 February 5, 2024
 
401 ESPADERA, MA LOURDES PLANNING Prepare Pre-Survey Data at Suawan SRIP February 5, 2024 100 February 5, 2024
 
402 ESPADERA, MA LOURDES PLANNING Identify Proposed Location of Control Points along canal for Suawan SRIP February 5, 2024 100 February 5, 2024
 
403 ESPADERA, MA LOURDES PLANNING Generate Lateral B1 Profile and Cross Section February 5, 2024 100 February 5, 2024
 
405 ESPADERA, MA LOURDES PLANNING Update PRIS and Pagan SRIP Daily Accomplishment February 6, 2024 100 February 6, 2024
 
406 ESPADERA, MA LOURDES PLANNING Generate Profile and Cross - Section of PRIS Lateral B3 and SKLA February 6, 2024 100 February 6, 2024
 
407 ESPADERA, MA LOURDES PLANNING Generate Profile and Cross Section of PRIS SMIA MC, SMIA Lat A, SMIA Lat A-1 February 7, 2024 100 February 7, 2024
 
408 INTO, LEE WARREN PLANNING Attend Flag Ceremony February 12, 2024 100 February 12, 2024 Attended on time.
 
410 ESPADERA, MA LOURDES PLANNING Assist in the preparation of Basiawan SPIP FS (Surveying and Mapping) February 7, 2024 100 February 7, 2024
 
412 INTO, LEE WARREN PLANNING Prepare PERT-CPM for SUAWAN-RIVER TAMUGAN-SIP (8M) February 16, 2024 100 February 12, 2024 Prepared and produced 5 copies for the programmer.
 
414 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Mal_RIS Resto-NIS CY 2022-Supplemental February 16, 2024 100 February 12, 2024 Prepared and produced 5 copies for the programmer.
 
415 ESPADERA, MA LOURDES PLANNING Generate Profile and Cross-Section of PRIS Parat RMC and LMC February 7, 2024 100 February 7, 2024
 
416 ESPADERA, MA LOURDES PLANNING Update Survey Accomplishment as of Feb 7 (Pagan SRIP and Padada RIS) February 8, 2024 100 February 8, 2024
 
417 ESPADERA, MA LOURDES PLANNING Prepare Survey Schedule and Target for next week's activity February 8, 2024 100 February 8, 2024
 
418 ESPADERA, MA LOURDES PLANNING Prepare Survey Team Travel Docs and Facilitate the preparation of Travel Order February 8, 2024 100 February 8, 2024
 
422 ESPADERA, MA LOURDES PLANNING Prepare overtime request for survey team for February 09, 2023 February 8, 2024 100 February 8, 2024
 
437 ESPADERA, MA LOURDES PLANNING Generating of Profile and Cross Section for Lat B2, B3 and B3-A February 9, 2024 70 N/A Carry-over: for verification of survey data
 
438 ESPADERA, MA LOURDES PLANNING Generating of Profile and Cross Section for Lat Aa, Lat B4 and SKLA February 9, 2024 85 N/A Carry-over: New data, owner does not allow survey activities to avoid possible contamination on their banana plantation at Lateral AA
 
439 ESPADERA, MA LOURDES PLANNING Checking and Polishing PRIS Levelling Data February 9, 2024 10 N/A
 
440 ESPADERA, MA LOURDES PLANNING Plotting of Badagoy CIS FY 2025 February 9, 2024 50 N/A Carry Over: Stationing of canal to be determined, survey was conducted last May 2023 wherein surveys does not begin at Sta 0+000
 
450 INTO, LEE WARREN PLANNING Prepare Schematic Diagram for Padada RIS Sacub Main Canal February 16, 2024 100 February 12, 2024 COMPLETED
 
451 INTO, LEE WARREN PLANNING Prepare Schematic Diagram for Padada RIS Sacub Lateral A February 16, 2024 100 February 14, 2024 COMPLETED
 
453 INTO, LEE WARREN PLANNING Prepare Schematic Diagram for Padada RIS PARAT LMC February 16, 2024 100 February 14, 2024 COMPLETED
 
454 INTO, LEE WARREN PLANNING Prepare Schematic Diagram for Padada RIS SMIA Main Canal February 16, 2024 100 February 15, 2024 COMPLETED
 
455 INTO, LEE WARREN PLANNING Prepare Schematic Diagram for Padada RIS SMIA Lateral A February 16, 2024 100 February 15, 2024 COMPLETED
 
458 INTO, LEE WARREN PLANNING Prepare Schematic Diagram for Padada RIS SMIA Lateral A1 February 16, 2024 100 February 15, 2024 COMPLETED
 
459 LUARDO, GLENN D. PLANNING Conduct Project ID for the additional proposed pump sites and service area of Kibangay SPIP @ Brgy. Suawan, Marilog District, Davao City. February 15, 2024 100 February 15, 2024 Other Accomplishments: Conduct Site Validation @ Saloy 2 SIP & Saloy SIS existing system & the proposed expansion @ Brgy. Saloy, Lacson, Davao City.
 
460 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony. February 12, 2024 100 November 25, 2024
 
461 LUARDO, GLENN D. PLANNING Prepare tabulated Status of Irrigation Development Based on Inventory for CY 2018-2023. February 14, 2024 100 February 13, 2024 Other Accomplishment: Prepare Indicative Procurement Management Plan (PPMP) for CY 2024 for Planning and Design Unit using the Online Project Procurement Management Plan and Purchase Request Information System (OPPIS) generated output (40%)
 
462 LUARDO, GLENN D. PLANNING Prepare Indicative Procurement Management Plan (PPMP) for CY 2024 for Planning and Design Unit using the Online Project Procurement Management Plan and Purchase Request Information System (OPPIS) generated output. February 13, 2024 100 February 14, 2024 Other Accomplishment: Facilitate in posting three (3) Invitation to Bid (ITB) for NIA DDS-IMO Project (MAL & Padada RIS) through NIA Region XI Website (100%).
 
464 CUICO, JHO-ANN A. PLANNING Prepare layout Map for Turn over documents Attachments (Bala-Kanapulo CIS, Blucon-Albatana CIS) February 16, 2024 100 February 13, 2024 Additional Accomplishments: Received, Record, Record Engineering Documents, Prepared Layout Maps for CEBUZA SIS for turn over Documents Attachment, Prepared Layoput Maos for MAL RIS Calanization RMC LATERAL E Sta: 0+685.00 - 0+698.88 and Sta: 0+727.94 -
 
465 CUICO, JHO-ANN A. PLANNING Prepare layout Map for Turn over documents Attachments (TITUGOP CIS, BPANAGLIB, WANGAN CIS) February 12, 2024 100 February 12, 2024 Additional Accomplishments: Received, Record, Reproduce Engineering Documents, Prepared Layout Map of MAL RIS (Service Roads Along Main Canal (0+025.7 - 0+133.00)) for POW attachments
 
472 INTO, LEE WARREN PLANNING Costing of FSDE Funds (Feb 12 - 16, 2024) February 16, 2024 100 February 16, 2024 Reconciled with RAOCO as of February 15, 2024
 
473 INTO, LEE WARREN PLANNING Prepare Physical and Financial Status under FSDE Project as of February 15, 2024 February 15, 2024 100 February 15, 2024 Completed, produced 2 copies and sent advance e-copy to RIO.
 
474 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Mal RIS (Repair-NIS) (15M) February 16, 2024 100 February 13, 2024 Revised PERT-CPM (due to the corresponding POW being revised). Prepared and produced 5 copies for the programmer.
 
475 ENCABO, PRINCESS SHAIRA MAE PLANNING POW Preparation for Mal RIS CY 2024 February 12, 2024 100 February 12, 2024 Completed.
 
476 ENCABO, PRINCESS SHAIRA MAE PLANNING Printing of DTR's and Accomplishment Report for Year 1 & Year 2 Personnel of Padada and Mal RIS. February 13, 2024 100 February 13, 2024 Completed and submitted.
 
477 ENCABO, PRINCESS SHAIRA MAE PLANNING Processing of documents pertinent to Semestral Monitoring and Assessment for PRIS and MRIS. February 13, 2024 100 February 13, 2024 Submitted approved proposal at the procurement office for processing of the pertinent activities.
 
478 ENCABO, PRINCESS SHAIRA MAE PLANNING Designating personnel (Y1 & Y2 - Padada RIS) for their tasks and duties for this week. February 12, 2024 100 February 12, 2024 Completed and assigned the tasks for the Y1 and Y2 Personnel of Padada RIS - IWRMP
 
480 ENCABO, PRINCESS SHAIRA MAE PLANNING Follow-up payrolls for payment of wages for Y1 & Y2 Personnel of Mal RIS February 13, 2024 100 February 13, 2024 Completed. On-going signing of the DTRs and payroll.
 
481 ENCABO, PRINCESS SHAIRA MAE PLANNING To work out FSR Padada RIS Modernization comments: Tabulate and summarize soil quality sampling results and provide write-ups compared with BSWM Standards. February 14, 2024 60 February 14, 2024 Completed the tabulation, yet the BSWM Standards for soil quality are unavailable so finding alternative references for the standards is ongoing.
 
485 INTO, LEE WARREN PLANNING Revise PAGAN CREEK DE POW February 16, 2024 100 February 13, 2024 Submitted e-copy to supervisor and to be forwarded to RIO for checking. Removed "SEIA" from contract works. Closed the amount to Php 12,000,000.00
 
487 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Sitio Lenna SIP (25M) February 16, 2024 100 February 14, 2024 Prepared and sent e-copy to programmer.
 
496 CUICO, JHO-ANN A. PLANNING Attend workshop on generating PIA using the NIMP Data February 16, 2024 100 February 14, 2024 Additional Accomplishments: Prepared Layout Maps for PADADA RIS (SERVICE ROAD) for POW Attachments along DRM sta: 0+000.00 - 0+042.00 (42Meters), Along Lateral B sta: 3+284.5 - 3+350.00 (65.50 Meters), Prepared Layout map for BASIAWAN FSR (CADT AREAS)
 
497 CUICO, JHO-ANN A. PLANNING Attend workshop on generating PIA using the NIMP Data February 16, 2024 100 February 15, 2024 COMPLETED
 
504 SASUMAN, MARY LOUISE J. PLANNING Prepare Impact Management Plan (IMP) as per CO's comment in Padada RIS Modernization FSR February 16, 2024 100 February 14, 2024 Carry Over: Prioritized the write-ups in Hydrology, Surveying and Mapping and finalized the consolidation of Basiawan SPIP FSR. As of Feb. 14, 2024, accomplished 100% of IMP; Current Status: for checking by IMO Planning Unit Head, RO, and CO designated p
 
505 SASUMAN, MARY LOUISE J. PLANNING Conduct Water Pressure Test (WPT) of Bore Hole 14 in Cogon Bacaca SRIP February 15, 2024 0 N/A
 
506 SASUMAN, MARY LOUISE J. PLANNING Revise and finalize Basiawan Feasibility Study Report (FSR) as per comment by the Planning Unit Head February 16, 2024 100 February 15, 2024 Revised FSR as per comments from Planning Unit Head
 
510 CAYABYAB, REY JIM PLANNING Attend Fieldwork for the Environmental Baseline Survey and Irrigation and Drainage Investigation on Pagan SRIP with the Consultant February 12, 2024 100 February 12, 2024
 
511 CAYABYAB, REY JIM PLANNING Attend Fieldwork for the Irrigation and Drainage Investigation on Pagan SRIP with the Consultant February 13, 2024 100 February 13, 2024
 
518 EUGENIO, VENANN PLANNING Print, bind, and submit Mal RIS POW (15M RRENIS) February 13, 2024 100 February 13, 2024 Completed. Submitted to Engr. Charisse Q. Montebon last Feb. 13, 2024
 
519 INTO, LEE WARREN PLANNING Re-Printing of Dakinus Lateral B Plan and Profile February 15, 2024 100 December 15, 2024 Re-printed Plan and Profile, included Cross-sections and submitted with transmittal.
 
522 CAYABYAB, REY JIM PLANNING Attend Fieldwork for the Irrigation and Drainage Investigation on Pagan SRIP with the Consultant February 14, 2024 100 February 14, 2024 Other accomplishments: - Attended Exit Conference at the Regional Office together with the Consultant - Prepared write-ups on Basiawan SPIP Corrections (Chapter 5.2.2.2, 5.2.9, and 8.4)
 
524 CAYABYAB, REY JIM PLANNING Plotting DRQ of Padada RIS (Length = 1730.20 m) February 16, 2024 100 February 15, 2024
 
525 CAYABYAB, REY JIM PLANNING Plotting DRI of Padada RIS (Length = 3386.20 m) February 16, 2024 100 February 15, 2024
 
526 HERNAN, ALDEN PLANNING conduct water pressure test for BH-14 of Cogon Bacaca SRIP February 13, 2024 100 February 13, 2024 completed
 
528 CAYABYAB, REY JIM PLANNING Labeling DRM Continuation of Padada RIS Modernization (Length = 2429.36 m) February 16, 2024 100 February 15, 2024
 
530 HERNAN, ALDEN PLANNING update and consolidate Padada RIS inventory Main Canal, Lateral A, Lateral A1, reconciling survey data February 16, 2024 100 April 4, 2024 inserted activites: prepare Dtr and other attachments, acquire document at NCIP davao del sur
 
533 ESPADERA, MA LOURDES PLANNING Generating of Profile and Cross Section for Lat B2, B3 and B3-A February 16, 2024 70 N/A Carry-over: for verification of survey data
 
535 ESPADERA, MA LOURDES PLANNING Generating of Profile and Cross Section for Lat Aa, Lat B4 and SKLA February 16, 2024 85 N/A Carry-over: New data, owner does not allow survey activities to avoid possible contamination on their banana plantation at Lateral AA
 
536 ESPADERA, MA LOURDES PLANNING Checking and Polishing PRIS Levelling Data February 16, 2024 20 N/A
 
537 ESPADERA, MA LOURDES PLANNING Plotting of Badagoy CIS FY 2025 February 16, 2024 40 N/A Carry Over: Stationing of canal to be determined, survey was conducted last May 2023 wherein surveys does not begin at Sta 0+000 and used assumed coordinates
 
539 ESPADERA, MA LOURDES PLANNING Checking and Imported Pagan SRIP Data to dwg file February 12, 2024 100 February 12, 2024
 
540 ESPADERA, MA LOURDES PLANNING Attended Virtual Meeting with CEST regarding the Topographic Survey February 13, 2024 100 February 13, 2024
 
545 ESPADERA, MA LOURDES PLANNING Miscellaneous Works: Follow-up Submission of SALN and Original DTRs Follow-up Inventory of Remaining Construction Materials at Padada RIS for the Establishment of CPs February 12, 2024 100 February 12, 2024
 
547 ESPADERA, MA LOURDES PLANNING Drafted Letter to Private Land Owner at Suawan SRIP and Pagan SRIP February 13, 2024 100 February 13, 2024
 
548 ESPADERA, MA LOURDES PLANNING Miscellaneous Works: Facilitate requesting in advance of Printed DTRs for the survey team assigned at Marilog Area Follow-up level route map of Padda RIS Secure a copy of Suawan Brgy Reso for the survey team February 13, 2024 100 February 13, 2024
 
549 ESPADERA, MA LOURDES PLANNING Plotting of Padada RIS - Sacub Dam U/S (FY 2024 Additional) February 14, 2024 100 February 14, 2024
 
550 ESPADERA, MA LOURDES PLANNING Plotting of Mal RIS - RRENIS FY 2025 (LMC Lat E) February 14, 2024 100 February 14, 2024
 
551 ESPADERA, MA LOURDES PLANNING Update survey team schedule, prepared pre-survey data in KMZ format and conducted pre-deployment meeting with survey team leaders February 14, 2024 100 February 14, 2024
 
552 ESPADERA, MA LOURDES PLANNING Update the PRIS Plotting and Drafting Accomplishment both in Canal and Drainage Network and Facilitate setting the target accomplishment of draftsman February 15, 2024 100 February 15, 2024
 
553 ESPADERA, MA LOURDES PLANNING Generate New Profiles and Cross Section for Kisulan 1 for change lines February 15, 2024 100 February 15, 2024
 
554 ESPADERA, MA LOURDES PLANNING Labelling and Drafting of Mal RIS RRENIS FY 2025 (LMC Lat E) February 15, 2024 100 February 16, 2024
 
555 ESPADERA, MA LOURDES PLANNING Miscellaneous Works: Update survey team schedule, prepared pre-survey data in KMZ format Contacted Team Leaders at Marilog Area for Claiming of Local Personnel Salaries Meeting with JUM to fasttrack the target submission of Additional Projects February 15, 2024 100 February 15, 2024
 
573 CAYABYAB, REY JIM PLANNING Prepare and submit draft back to office report of the conducted field investigation at Pagan SRIP February 16, 2024 100 February 16, 2024 On February 15, 2024: Accomplished 50% of the Draft BTOR preparation. On February 16, 2024: Submitted
 
602 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend Workshop on Regenerating Potential Irrigable Area and Mapping of Watershed Area of Davao Region. February 14, 2024 100 February 14, 2024 Attended workshop. Other accomplishment: Monitor the ongoing activities of Y1 and Y2 personnel through documentation sent by the personnel on site.
 
603 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend Workshop on Regenerating Potential Irrigable Area and Mapping of Watershed Area of Davao Region. February 15, 2024 100 February 15, 2024 Other accomplishment: Mandated the Year 1 personnel to facilitate the delivery of damaged seedlings on 2 sites of Padada RIS situated at Matanao, Davao del Sur. - Follow up on the delivery requests of bamboo slats for tree guard preparation.
 
604 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend Workshop on Regenerating Potential Irrigable Area and Mapping of Watershed Area of Davao Region. February 16, 2024 100 February 16, 2024 Other Accomplishment: -Follow up the data for Mal RIS delivery of seedlings as well as monitor the instructed filling out of DTRs of the PRIS and MRIS personnel.
 
608 CAYABYAB, REY JIM PLANNING Plotting and labeling of DRD-1 (Length = 889.72 m) February 16, 2024 100 February 16, 2024
 
609 CAYABYAB, REY JIM PLANNING Plotting of DRM right side (Length = 2729.35 m) February 16, 2024 100 February 16, 2024
 
610 CAYABYAB, REY JIM PLANNING Plotting of DRM-3 (Length = 557.57 m) February 16, 2024 100 February 16, 2024
 
611 ESPADERA, MA LOURDES PLANNING Update Weekly Accomplishment February 16, 2024 100 February 16, 2024
 
612 ESPADERA, MA LOURDES PLANNING Checking of Survey Team DTRs February 16, 2024 100 February 16, 2024
 
613 ESPADERA, MA LOURDES PLANNING Checking of Suawan SRIP Survey Weekly Accomplishment February 16, 2024 100 February 16, 2024
 
614 ESPADERA, MA LOURDES PLANNING Miscellaneous Works: Prepare Travel Documents for Survey Team Attend Client for TOT February 16, 2024 100 February 16, 2024
 
615 MARTURILLAS, JOHN LLOYD PLANNING Conduct leveling survey at Pagan SRIP February 12, 2024 100 February 12, 2024 Other accomplishment: leveling at Padada RIS DR 1 to DVS 3980 Leveling of 4 control points of Pagan SRIP: PSP 31, PSP 32, PSP 35, PSP 36
 
616 MARTURILLAS, JOHN LLOYD PLANNING Conduct leveling survey at Pagan SRIP February 13, 2024 100 February 13, 2024 Leveling of 8 control points of Pagan SRIP: PSS 75, PSS 76, PSS 59, PSS 60, PSS 83, PSS 84, PSS 63, PSS 64
 
617 MARTURILLAS, JOHN LLOYD PLANNING Conduct leveling survey at Pagan SRIP February 14, 2024 100 February 14, 2024 Leveling of 6 control points of Pagan SRIP: PSP 29, PSP 30, PSP 26, PSP 25, PSP 33, PSP 34
 
618 MARTURILLAS, JOHN LLOYD PLANNING Conduct leveling survey at Pagan SRIP February 15, 2024 100 February 15, 2024 Leveling of 8 control points of Pagan SRIP: PSS 11, PSS 12, PSS 13, PSS 14, PSP 19, PSP 20, PSS 23, PSS 24
 
619 MARTURILLAS, JOHN LLOYD PLANNING Conduct leveling survey at Pagan SRIP February 16, 2024 100 February 16, 2024 Leveling of 2 control points of Pagan SRIP: PSS 29, PSS 30
 
635 ESPADERA, MA LOURDES PLANNING Prepare Payroll for Local Personnel at Marilog Area for Feb 1-15 February 19, 2024 100 February 19, 2024
 
636 ESPADERA, MA LOURDES PLANNING Submit Revised Topographic Map of Pagan SRIP February 23, 2024 20 February 19, 2024
 
641 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Tanwalang SIP CY2022 Supplemental February 23, 2024 100 February 19, 2024 Completed
 
649 LUARDO, GLENN D. PLANNING Prepare BTOR for the conducted project ID on February 12 & 15, 2024 for the proposed additional Damsite/Pumpsite and Service area for Kibangay SPIP Project @ Brgy. Suawan, Marilog District, Davao City. February 19, 2024 100 February 19, 2024 Other accomplishment: Attended and Participated in Flag Raising Ceremony.
 
650 LUARDO, GLENN D. PLANNING Conduct Agro-socio Economic Survey and Drone Activity @ the Proposed Bagumbayan SPIP, located @ Brgy. Bagumbayan, Kiblawan, Davao del Sur. February 21, 2024 100 February 21, 2024 On Feb. 20, 2024- Revised write-ups and provide tables on Farming Pop., Poverty Incidence, and Ethnicity/Indigenous People (100%). Other Accomplishment: Prepare Table on Productivity of Palay & other crops (70%).
 
651 INTO, LEE WARREN PLANNING Prepared Budget Proposal FY 2025 draft hard copy. February 20, 2024 100 February 19, 2024 Completed
 
653 INTO, LEE WARREN PLANNING Costing of FSDE Funds (Feb 19 - 23, 2024) February 23, 2024 100 February 23, 2024 Double checked logbook for reconciliation.
 
654 INTO, LEE WARREN PLANNING Prepare Budget Proposal FY 2025 Draft Soft Copy (PDF) February 20, 2024 100 February 23, 2024 Double-checked logbook as per encoded in the costing spreadsheet.
 
659 HERNAN, ALDEN PLANNING Inventory Report of Padada RIS -Modernization (as per MC 91) February 23, 2024 100 February 26, 2024 completed
 
676 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Datu Danwata CY 2022 Supplemental POW February 24, 2024 100 February 23, 2024 Completed
 
700 MARTURILLAS, JOHN LLOYD PLANNING Re-static survey of rejected controls of Padada RIS February 22, 2024 100 February 22, 2024 *survey data cannot be processed for the mean time because NIA RIO XI magnet tool software license is expire.
 
702 ENCABO, PRINCESS SHAIRA MAE PLANNING Checking of DTRs/Attachments and preparation of payroll for Padada & Mal RIS Year 1 & 2 Personnel February 19, 2024 100 February 19, 2024 Accomplished: Checked and prepared payroll for Padada RIS Y1 & Y2 Personnel. Ongoing: Checking of DTRs and prepared payrolls for Mal RIS Year 1 & 2 Personnel.
 
703 ENCABO, PRINCESS SHAIRA MAE PLANNING Monitoring of the remaining activities for Year 1 & Year 2 implementation in Padada RIS. February 20, 2024 100 February 20, 2024 Other accomplishments: - Checked and prepared payroll for Mal RIS Y1 & Y2 Personnel.
 
704 ENCABO, PRINCESS SHAIRA MAE PLANNING Delineation of watersheds for Davao Occidental to be used in the Provincial Irrigation Master Plan. February 21, 2024 100 February 21, 2024 Delineated watershed and submitted output for consolidation. Other accomplishment: - Monitored the accomplishments of the personnel for Year 1 (watering activities); and Year 2 (planting/watering/fertilizer application).
 
706 ENCABO, PRINCESS SHAIRA MAE PLANNING Working out on PIMP comments. February 23, 2024 100 February 23, 2024 Accomplishments: Feb. 22, 2024 - Complied with the comments on Chapter 6.4.1. Formulation of Management Plan and Budget for PIMP - Davao del Sur. Feb. 23, 2024 - Prepared POW for Watershed Management Formulation for Asbang SRIP and Miral SRIS.
 
715 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of Program/Presentation and Itinerary for the upcoming Semestral Assessment and Monitoring of Plantation Activities. February 23, 2024 100 February 23, 2024 Accomplished: - Prepared itinerary for the CO personnel in preparation of the semestral assessment.
 
716 INTO, LEE WARREN PLANNING Project Validation for Padada CIS, Lanuro CIS and Unifarm CIS February 21, 2024 100 February 21, 2024 Completed
 
717 INTO, LEE WARREN PLANNING Project Validation for Badagoy CIS, Kilolog CIS, San Jose SIP and New Cabasagan CIS February 23, 2024 100 February 22, 2024 Completed
 
718 INTO, LEE WARREN PLANNING Updated Annex 5 of Provincial Irrigation Master Plan as per new format. (New spreadsheet columns intended for key indicators of projects) February 23, 2024 100 February 23, 2024 Completed
 
719 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel request/documents for surveying activities at Suawan, Saloy, and Titugop. February 23, 2024 100 February 23, 2024
 
720 MARTURILLAS, JOHN LLOYD PLANNING Create monument description sheet for Padada RIS control monuments for modernization. February 19, 2024 30 February 19, 2024 *Encoding of grid and geographic coordinates of Padada RIS control monuments. *Location and details of control monuments at Padada RIS.
 
721 MARTURILLAS, JOHN LLOYD PLANNING Create monument description sheet for Padada RIS control monuments for modernization. February 20, 2024 50 February 20, 2024 *Generate sketch map of control monuments at Padada RIS. *Plotting of 1 LUC application.
 
722 MARTURILLAS, JOHN LLOYD PLANNING Create monument description sheet for Padada RIS control monuments for modernization. February 21, 2024 100 February 21, 2024 *Generate sketch map of control monuments at Padada RIS. *Lacking of elevation values. To be encoded after polishing the level data
 
723 MARTURILLAS, JOHN LLOYD PLANNING Polishing of leveling data of Padada RIS control monuments. February 23, 2024 100 March 4, 2024 COMPLETED
 
725 LUARDO, GLENN D. PLANNING Revise write-ups & Provide Tables on the Provincial Irrigation Master Plan of the Province of Davao del Sur based on the comments provided. February 23, 2024 100 February 26, 2024 02/22/24-Revised write-ups & Provided Tables on Prod. of Palay & other Crops, Agri. Prod. & Farmers Income,& Income from other generated proj. of Org. (100%),Other Accomp.:Revised write-ups & Provided Tables on Rice Prod. Incr. & Other Agri. Crops Incr. (
 
726 ESPADERA, MA LOURDES PLANNING Assist in the Preparation of Map Layout for Budget Workshop February 19, 2024 100 February 19, 2024
 
727 ESPADERA, MA LOURDES PLANNING Assist in mapping of Sitio Lenna SIP February 19, 2024 100 February 19, 2024
 
728 ESPADERA, MA LOURDES PLANNING Plotting of Unifarm CIS for CY 2024 Additional (Calamity) February 19, 2024 100 February 19, 2024
 
729 ESPADERA, MA LOURDES PLANNING Plotting of Padada RIS for CY 2024 (Repair of Flume and Prop Riprap at MDR) February 20, 2024 100 February 20, 2024
 
730 ESPADERA, MA LOURDES PLANNING Plotting of Badoma CIS for CY 2024 Additional (Calamity) February 21, 2024 100 February 21, 2024
 
731 ESPADERA, MA LOURDES PLANNING Plotting of Lanuro CIS for CY 2024 Additional (Calamity) February 21, 2024 100 February 21, 2024
 
732 ESPADERA, MA LOURDES PLANNING Update Accomplishment of Survey Activities February 21, 2024 100 February 21, 2024
 
733 ESPADERA, MA LOURDES PLANNING Plotting of Lower Marber CIS for CY 2024 Additional (Solar) February 22, 2024 100 February 22, 2024
 
734 ESPADERA, MA LOURDES PLANNING Generate Profile and Cross Section for Bolo-bolo SIP Access Road February 22, 2024 100 February 22, 2024
 
735 ESPADERA, MA LOURDES PLANNING Plotting of Kiopao SPIP for CY 2024 Additional (Solar) February 23, 2024 100 February 23, 2024
 
736 ESPADERA, MA LOURDES PLANNING Update Accomplishment and Schedule of Survey Activities February 23, 2024 100 February 23, 2024
 
737 ESPADERA, MA LOURDES PLANNING Checking and Polishing PRIS Levelling Data February 23, 2024 80 N/A To be completed by JRM
 
738 ESPADERA, MA LOURDES PLANNING Plotting of Badagoy CIS FY 2025 February 23, 2024 40 N/A
 
739 ESPADERA, MA LOURDES PLANNING Generating of Profile and Cross Section for Lat B2, B3 and B3-A February 23, 2024 70 N/A Carry-over: for verification of survey data
 
740 ESPADERA, MA LOURDES PLANNING Generating of Profile and Cross Section for Lat Aa, Lat B4 and SKLA February 23, 2024 85 N/A Carry-over: New data, owner does not allow survey activities to avoid possible contamination on their banana plantation at Lateral AA Update: New data for re-survey, base was moved during survey
 
741 CUICO, JHO-ANN A. PLANNING Attend workshop on generating PIA using the NIMP Data February 16, 2024 100 February 16, 2024 COMPLETED
 
742 CUICO, JHO-ANN A. PLANNING Flag Raising Ceremony February 19, 2024 100 February 19, 2024 COMPLETED
 
743 CUICO, JHO-ANN A. PLANNING Prepared POW Attachment of MAMACAO CIS for POW attachments: LATERAL A Sta: 0+238.34 - 1+563.72, MAIN CANALS Sta: 0+430.68 - 0+655.63, LATERAL B Sta: 0+195.51 - 2+246.666, Diversion Works and Protection Works February 19, 2024 100 February 19, 2024 COMPLETED
 
744 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps of MAL RIS POW Attachments RMC LATERAL E Sta: 0+685.00 - 0+694.88, sta: 0+727.00 - 0+788.48 February 23, 2024 100 February 19, 2024 COMPLETED
 
745 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents February 19, 2024 100 February 19, 2024 COMPLETED
 
747 ESPADERA, MA LOURDES PLANNING Assist in encoding of 2025 projects in OPAIPBP February 23, 2024 100 February 23, 2024
 
749 CUICO, JHO-ANN A. PLANNING Prepared Layout Map of CEBUZA CIS for POW Attachments PROTECTION WORKS: @Left side Station: 0+000.00 - 0+033.50 @Rigth Side Station: 0+000.00 - 0+0021.40 @Left end Portion Station: 0+033.50 - 0+033.65 Length: 55.05 Meters February 24, 2024 100 February 20, 2024 Additional Accomplishments: Prepared Layout Map of MAL RIS Lateral F-2 Sta: 0_205.00 - 0+412.00 (203.48 Meters), Received, Record, Reproduce Engineering Documents, Prepared Layout Maps
 
751 CUICO, JHO-ANN A. PLANNING Attended Write shop on the Finalization of the Regional Irrigations Masterplan 2023-2030 Davao Region February 22, 2024 100 February 22, 2024 Attended the writeshop at NIA-RIO.
 
752 CUICO, JHO-ANN A. PLANNING Attended Write shop on the Finalization of the Regional Irrigations Masterplan 2023-2030 Davao Region February 23, 2024 100 February 23, 2024 Attended the writeshop at NIA-RIO.
 
753 CUICO, JHO-ANN A. PLANNING Attended Briefing/Instructions from Unit Head for Next week Accomplishments and Reports of accomplishments as per previous week Performance February 24, 2024 100 February 24, 2024 COMPLETED
 
755 CUICO, JHO-ANN A. PLANNING Tabulated data and comply with lacking as per comments for PIMP of Davao Del Sur February 24, 2024 100 February 24, 2024 Actual Accomplishments: Tabulated updated Datas as per Regions Shapefiles (LAND COVER 2020, SOIL TYPE, LAND USE, LAND SLIDE HAZARD MAP, FLOOD HAZARD MAP, BALUTAKAY WATERSHED, PADADA RIVERS, DIGOS RIVER), Prepared Layout Map for FY 2025 Attachments BALAWAN
 
757 CUICO, JHO-ANN A. PLANNING Updated Layout Maps attached in the PIMP as per updated Boundaries (DAVAO DEL SUR) February 24, 2024 100 February 24, 2024 Actual Accomplishments: Prepared Layout maps of Davao Del Sur as per New boundaries (LAND COVER 2020, SOIL TYPE, LAND USE, LAND SLIDE HAZARD MAP, FLOOD HAZARD MAP, BALUTAKAY WATERSHED, PADADA RIVERS, DIGOS RIVER), Prepared Layout Map for FY 2025
 
768 SASUMAN, MARY LOUISE J. PLANNING Attend writeshop on the finalization of the RIMP 2023-2030 on Feb 20-23, 2024 February 23, 2024 100 February 23, 2024 Attended the writeshop at NIA-RIO and made initial revision on the content for DDS PIMP.
 
769 CAYABYAB, REY JIM PLANNING Attend writeshop on the finalization of the RIMP 2023-2030 on February 20-23, 2024 February 23, 2024 100 February 23, 2024 Attended writeshop at the RIO.
 
770 CAYABYAB, REY JIM PLANNING Labeling of DRI & DRH of Padada RIS February 19, 2024 100 February 19, 2024
 
771 CAYABYAB, REY JIM PLANNING Plotting DRD of Padada RIS (L = 4082.74 m) February 19, 2024 100 February 19, 2024
 
772 CAYABYAB, REY JIM PLANNING Plotting DRI-1 & DRK of Padada RIS February 19, 2024 100 February 19, 2024
 
773 EUGENIO, VENANN PLANNING Polishing of Davao del Sur regenerated PIA shapefiles February 19, 2024 100 February 19, 2024 Completed (for Davao del Sur only).
 
774 EUGENIO, VENANN PLANNING Prepare layout map of Miral SRIS for FY2025 Budget Proposal Attachment. February 19, 2024 100 February 19, 2024 Completed.
 
775 EUGENIO, VENANN PLANNING Prepare travel documents for writeshop on the finalization of the RIMP 2023-2030 on Feb 20-23, 2024 at NIA XI RIO February 19, 2024 100 February 19, 2024 Completed. Signed TR and Trip Ticket was cancelled.
 
776 EUGENIO, VENANN PLANNING Attended write shop on the finalization of the RIMP 2023-2030 on Feb 20-23, 2024 at NIA XI RIO February 23, 2024 100 February 23, 2024 100%-Mapping of watershed areas of 3 Provinces; 100%-regenerated PIA of Davao del Sur; 100%-Updated PIMP main tables required; ON-GOING revision of Davao del Sur PIMP for the compliance of the comments
 
777 EUGENIO, VENANN PLANNING Study MC 66 S. 1973, MC 100 S. 2023, MC 136 S. 2023, and MC 145 S. 2023 for PIMP write up for chapter 6.3 (Research & Development) February 26, 2024 100 February 26, 2024 Update write-up for Davao del Sur PIMP Chapter 6.3; Check layout map for PCR attachment.
 
778 CUICO, JHO-ANN A. PLANNING Attend writeshop on the finalization of the RIMP 2023-2030 on Feb 20-23, 2024 February 21, 2024 100 February 21, 2024 Attended the writeshop at NIA-RIO.
 
779 EUGENIO, VENANN PLANNING Comply comments on the Davao del Sur PIMP March 1, 2024 100 March 4, 2024 Feb 27-100% Prepare layout map for the Potention Irrigable Area of Davao del Sur PIMP; 100% Prepare layout map for the Remaining Area to be Developed of Davao del Sur PIMP; 80% Update write up of assigned chapters in Davao del Sur PIMP as per CO comments.
 
780 EUGENIO, VENANN PLANNING Finalize Davao del Sur PIMP March 1, 2024 100 February 28, 2024 Feb 28 - 100% Update write-up of assigned chapters in Davao del Sur PIMP as per CO comments; 100% - Prepare location layout map of Davao del Sur Existing and Proposed Irrigation Systems; 100% - Locate the parcel of NIA assets within Hagonoy, Davao del Su
 
866 CUICO, JHO-ANN A. PLANNING Comply Comment on the Davao Del Sur PMP March 1, 2024 100 February 29, 2024 Received ,Record, Reproduce Engineering Documents, Prepared Layout maps for Davao del sur PIMP (HAZARD MAPS: Tsunami Map, Liquefaction Hazard Map, Ground Shaking Hazard Map, Ground Rupture Hazard Map), Tabulated All Data Generated of SIBULAN RIVER
 
867 CUICO, JHO-ANN A. PLANNING Finalized Davao Del Sur PIMP March 1, 2024 100 February 28, 2024 Additional Accomplishments:Received ,Record, Reproduce Engineering Documents; Prepared layout Maps of MAIN WATERSHED as per Data generated and new Boundaries of Davao Del Sur; Prepared Layout Map for KAWAYAN SIS (Sta. 0+182.38 - 392.50 (206 Meters)) Can
 
869 CUICO, JHO-ANN A. PLANNING Comply Comments on the Davao Del Sur PIMP as per New generated Data March 1, 2024 100 February 27, 2024 Received ,Record, Reproduce Engineering Documents; Prepared Layout maps for Davao del sur PIMP (Cadt Map, Climate Map, Groundwater Map); Tabulated All Data Generated as per the new boundaries of Davao del sur (Cadt Data); Delinated/Create Updated shape
 
891 ENCABO, PRINCESS SHAIRA MAE PLANNING Update the proposal for Semestral Assessment, and follow up pertinent documents/activities relative thereto. February 26, 2024 100 February 26, 2024 Updated proposal, submitted menu for PR, and processed pertinent documents for the activity.
 
892 ENCABO, PRINCESS SHAIRA MAE PLANNING Updated the IWRMP Progress Report for the month of February 2024. February 26, 2024 100 February 26, 2024 Updated and submitted advance copy to RIO personnel for compilation. A hard copy was already submitted to the unit head, for signing.
 
893 ENCABO, PRINCESS SHAIRA MAE PLANNING Designated works for the field personnel in Padada RIS for Year 1 & 2. February 26, 2024 100 February 26, 2024 Designated workloads to Y1 & Y2 personnel prioritizing the watering activities due to intense heat that may affect the planted seedlings. Give tips and suggestions to landowners to minimize heat damage to plants, such as mulching.
 
894 ENCABO, PRINCESS SHAIRA MAE PLANNING Comply comments for Davao del Sur PIMP. February 27, 2024 100 February 28, 2024 Complied comments for Land Cover discussions.
 
896 ENCABO, PRINCESS SHAIRA MAE PLANNING Updated maps and added details for the Y1 and Y2 plantation sites of Padada and Mal RIS. February 27, 2024 100 February 27, 2024 Updated maps with details; a hard copy was already printed.
 
897 ENCABO, PRINCESS SHAIRA MAE PLANNING Updated POW for Asbang and Miral SRIP Management Plan Formulation. February 28, 2024 100 February 28, 2024 Updated POW based on an in-house type of formulation; was incorporated in Davao del Sur PIMP, under the watershed prioritization in the province.
 
898 ENCABO, PRINCESS SHAIRA MAE PLANNING Comply with comments for Davao del Sur PIMP. February 28, 2024 100 February 28, 2024 Complied comments for the Main Watershed within the region.
 
900 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of communication letters for the upcoming activity on semestral assessment, request for extension of tree guard personnel & monitor on-going progress of plantation sites. February 29, 2024 100 February 29, 2024 Completed.
 
901 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of payrolls and attachments for Y1 & Y2 field personnel for Padada and Mal RIS. February 29, 2024 100 February 29, 2024 Completed the preparation of payrolls and attachments for Y1 & Y2 personnel of Padada and Mal RIS.
 
902 ENCABO, PRINCESS SHAIRA MAE PLANNING Finalize comments for Davao del Sur PIMP. March 1, 2024 100 March 1, 2024 Provided write-ups for the comments on Davao del Sur PIMP.
 
903 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony February 26, 2024 100 February 26, 2024 Completed
 
905 CUICO, JHO-ANN A. PLANNING Finalize Comments for Davao Occidental PIMP March 1, 2024 60 March 1, 2024 Actual Accomplishments: 100% - Tabulated data of MAIN WATERSHED, LAND CLASSIFICATION, SOIL TYPE, LAND COVER, ADMINISTRATIVE MAP as per Data generated and new Boundaries of Davao Occidental , Prepared Layout Map; Received, Record, Reproduced Engineering
 
907 INTO, LEE WARREN PLANNING Assist in the preparation of Budget Proposal FY 2025 February 27, 2024 100 February 27, 2024 Completed
 
908 INTO, LEE WARREN PLANNING Assist in encoding in OPAIPBP. February 27, 2024 100 February 27, 2024 Completed.
 
910 CAYABYAB, REY JIM PLANNING Labeling DRK and DRI-1 of Padada RIS Drainage February 27, 2024 100 February 27, 2024
 
911 CAYABYAB, REY JIM PLANNING Labeling DRM-3, DRQ, and DRD of Padada RIS Drainage February 26, 2024 100 February 26, 2024
 
912 CAYABYAB, REY JIM PLANNING Binding of Basiawan SPIP Feasibility Study Report February 27, 2024 100 February 27, 2024
 
914 CAYABYAB, REY JIM PLANNING Comply comments of 3rd District, Davao City PIMP February 27, 2024 100 February 27, 2024
 
915 CAYABYAB, REY JIM PLANNING Labeling and Plotting DRA continuation (L = 1075.57m) February 28, 2024 100 February 28, 2024
 
916 CAYABYAB, REY JIM PLANNING Prepare and submit Back-to-Office report for Pagan SRIP Field Investigation February 28, 2024 100 February 28, 2024
 
919 EUGENIO, VENANN PLANNING Finalize Davao del Sur PIMP March 1, 2024 100 March 6, 2024 Feb 29 - 80% - Prepare location layout map of Davao Occidental Existing and Proposed Irrigation Systems; 100% - Compute the Dependable Water Supply of Malita River; 100% - Edited location layout map of Davao del Sur Existing and Proposed Irrigation Syst
 
921 INTO, LEE WARREN PLANNING Prepare Back-to-Office Report for Lanuro CIS Project Validation conducted last February 22, 2024 February 29, 2024 100 February 28, 2024 Completed
 
922 INTO, LEE WARREN PLANNING Prepare Back-to-Office Report for UNIFARM CIS Project Validation conducted last February 22, 2024 February 29, 2024 100 February 29, 2024 Completed
 
923 EUGENIO, VENANN PLANNING Finalize Davao del Sur PIMP March 1, 2024 100 March 1, 2024 Mar. 1 - 80% - Prepare location layout map of Davao Occidental Existing and Proposed Irrigation Systems; ___ Compute the Dependable Water Supply of Lais & Culaman River
 
924 INTO, LEE WARREN PLANNING Prepared Layout map for Lanuro CIS Site Inspection of Dam, unlined canals and Proposed IA Building Location. February 29, 2024 100 February 28, 2024 Completed
 
925 INTO, LEE WARREN PLANNING Prepare Layout maps for the site inspection of UNIFARM CIS Site Inspection of dam and unlined canals. February 29, 2024 100 February 29, 2024 Completed
 
928 CAYABYAB, REY JIM PLANNING Comply with comments of Davao Occidental PIMP February 29, 2024 100 February 29, 2024
 
929 ESPADERA, MA LOURDES PLANNING Oversee/ Monitor Surveying Activities at Suawan SRIP February 26, 2024 100 February 26, 2024
 
930 ESPADERA, MA LOURDES PLANNING Oversee/ Monitor Surveying Activities at Suawan SRIP February 26, 2024 100 February 27, 2024 Lead the surveying activities at Saloy SIS Main Dam
 
931 ESPADERA, MA LOURDES PLANNING Plotting of Badagoy CIS CY 2024 Additional (Calamity) March 1, 2024 50 N/A Additional Survey Activities to be completed by March 1
 
932 SASUMAN, MARY LOUISE J. PLANNING Consolidate comments for the finalization of DDS PIMP February 28, 2024 100 February 28, 2024 Completed the consolidation of comments per discipline for the finalization of DDS PIMP. Other accomplishment: Prepared Memo for Notice of Meeting for ISO Training and Education Team
 
934 SASUMAN, MARY LOUISE J. PLANNING Finalized write-ups for the finalization of DDS PIMP March 1, 2024 100 March 1, 2024 Completed the finalization of the over-all write-ups of DDS PIMP
 
935 ESPADERA, MA LOURDES PLANNING Plotting of Titugop SIP CY 2024 Additional (Calamity) March 1, 2024 20 N/A Additional Survey Activities to be completed by March 1 Common point of previous and new data were not identified by survey team
 
936 SASUMAN, MARY LOUISE J. PLANNING Submit final DDS PIMP to NIA-RO via email March 1, 2024 100 March 1, 2024 Completed. Already submitted the advance copy of DDS PIMP to NIA-RO Planning. Other Accomplishment: Attended ISO Training and Education Team Meeting.
 
937 ESPADERA, MA LOURDES PLANNING Plotting of Saloy SIS CY 2024 Additional (Calamity) March 1, 2024 100 February 29, 2024
 
938 ESPADERA, MA LOURDES PLANNING Draft Incident Report on the damaged RTK (Topcon) Charger March 1, 2024 50 N/A
 
940 CAYABYAB, REY JIM PLANNING Prepare Estimate of Materials and Breakdown of Cost for Construction for Saloy 2 SIP CY 2024 February 29, 2024 100 February 29, 2024
 
941 ESPADERA, MA LOURDES PLANNING Prepare own DTR, checking and conforming of survey team DTR March 1, 2024 100 March 1, 2024
 
942 ESPADERA, MA LOURDES PLANNING Checking and Polishing PRIS Levelling Data March 1, 2024 100 March 1, 2024 Completed by JRM
 
943 ESPADERA, MA LOURDES PLANNING Plotting of Badagoy CIS FY 2025 March 1, 2024 40 N/A On hold: Prioritize CY 2024 Additional (Calamity and Leadership Fund)
 
944 ESPADERA, MA LOURDES PLANNING Generating of Profile and Cross Section for Lat B2, B3 and B3-A March 1, 2024 70 N/A On hold: Prioritize CY 2024 Additional (Calamity and Leadership Fund) Carry-over: for verification of survey data for Lateral B2
 
945 ESPADERA, MA LOURDES PLANNING Generating of Profile and Cross Section for Lat Aa, Lat B4 and SKLA March 1, 2024 85 N/A On hold: Prioritize CY 2024 Additional (Calamity and Leadership Fund) Carry-over: New data, owner does not allow survey activities to avoid possible contamination on their banana plantation at Lateral AA Update: New data for re-survey, base was moved dur
 
946 ESPADERA, MA LOURDES PLANNING Submit Revised Topographic Map of Pagan SRIP March 1, 2024 30 N/A On hold: Prioritize CY 2024 Additional (Calamity and Leadership Fund)
 
947 ESPADERA, MA LOURDES PLANNING Update Accomplishment of Survey Team in Suawan SRIP February 28, 2024 100 February 28, 2024
 
948 ESPADERA, MA LOURDES PLANNING Update Surveying and Plotting Activities Accomplishment (Padada RIS Canal and Drainage, FY 2025, CY 2024 Additional Projects, SRIP Projects) March 1, 2024 100 March 1, 2024
 
949 ESPADERA, MA LOURDES PLANNING Facilitate the issuance of Travel Order, Travel Request and Trip Tickets of Survey Team March 1, 2024 100 March 1, 2024
 
950 ESPADERA, MA LOURDES PLANNING Regenerate Profile and Cross Section for Badoma CIS CY 2024 Additional (Change in Stationing) February 28, 2024 100 February 28, 2024
 
958 LUARDO, GLENN D. PLANNING Revise write-ups & Provide Tables on the Provincial Irrigation Master Plan of the Province of Davao del Sur based on the comments provided. March 1, 2024 100 February 29, 2024 Other Accomp.: Prepared Tables for Poverty Incidence, Agricultural Productivity & Farmers Income, Productivity of Palay & other Crops, and Farmers Household Income for Davao Occidental PIMP (2020-2030)
 
959 LUARDO, GLENN D. PLANNING Revise write-ups and update Tables Physical Targets and Budgetary Requirements and Physical Targets, Budgetary Requirements for Palay, and Physical Targets and Budgetary Requirements for other Crops for Davao del Sur PIMP (2020-2030) February 26, 2024 100 February 26, 2024 Other Accompl.: Updated PDU PPMP for CY 2024 and Prepared purchase request for the conduct of Monitoring and Evaluation of Padada and Mal RIS IWRMP Projects (100%).
 
960 LUARDO, GLENN D. PLANNING Revise write-ups and update Figure on Physical Targets and Budgetary Requirements for other Crops, Investment Program, Expected Benefits, Farmers Organization & Development & Budgetary Requirements, and Institutional Development Deployment for Davao del S February 27, 2024 100 February 27, 2024
 
961 LUARDO, GLENN D. PLANNING Revise write-ups and update Tables on Employment Opportunity, Foreign Currency Saved, Farmers Organization & Development & Bugetary Requirements, and Institutional Development Deployment for Davao del Sur PIMP (2020-2030) February 28, 2024 100 February 28, 2024
 
963 LUARDO, GLENN D. PLANNING Revise write-ups and prepare tables and figures for Chapter 2 of Davao Occidental PIMP (2020-2030) March 6, 2024 100 March 6, 2024 Prepared Tables for Poverty Incidence, Agricultural Productivity & Farmers Income, Productivity of Palay & other Crops, and Farmers Household Income for Davao Occidental PIMP (2020-2030)
 
964 LUARDO, GLENN D. PLANNING Conduct Project ID at the proposed additional pump sites and service for Kibangay SPIP, located at Brgy. Suawan, Marilog Dist., Davao City. February 12, 2024 100 February 12, 2024
 
965 HERNAN, ALDEN PLANNING Site inspection in the conduct of water pressure test/ coordinate NCIP for the the conduct of FBI February 26, 2024 100 February 26, 0024 completed
 
971 CAYABYAB, REY JIM PLANNING Prepare the format of 3rd District, Davao City PIMP as per Writing Guide March 1, 2024 100 March 1, 2024
 
972 MARTURILLAS, JOHN LLOYD PLANNING Conduct surveying activities at Badagoy CIS supplementary dam and New Silay SIP March 1, 2024 100 March 1, 2024 Completed
 
973 MARTURILLAS, JOHN LLOYD PLANNING Conduct surveying activities at Mal RIS dam February 29, 2024 100 February 29, 2024 Completed
 
974 MARTURILLAS, JOHN LLOYD PLANNING Conduct surveying activities at Unifarm CIS February 28, 2024 100 February 28, 2024 Completed
 
975 MARTURILLAS, JOHN LLOYD PLANNING Plotting of New Silay SIP February 27, 2024 100 March 5, 2024 Other accomplishment : Plotted 4 LUC applications, Prepare travel documents for surveying activities, polishing of level data of padada ris controls for modernization.
 
976 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Badagoy CIS February 26, 2024 100 March 4, 2024 Other accomplishment : Checking of survey data of Titugop SIP, and Suawan SRIP. Polishing of level data of padada ris controls for modernization.
 
1038 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend the Capacity Development for the Simplified Formulation of Management Plan Under the Rehabilitation & Protection of Water Resources Supporting Irrigation Systems (R&P WRSIS) Program March 4, 2024 100 March 4, 2024 Attended the Capacity Development for the Simplified Formulation of Management Plan Under the Rehabilitation & Protection of Water Resources Supporting Irrigation Systems (R&P WRSIS) Program
 
1039 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend the Capacity Development for the Simplified Formulation of Management Plan Under the Rehabilitation & Protection of Water Resources Supporting Irrigation Systems (R&P WRSIS) Program March 5, 2024 100 March 5, 2024 Attended the Capacity Development for the Simplified Formulation of Management Plan Under the Rehabilitation & Protection of Water Resources Supporting Irrigation Systems (R&P WRSIS) Program
 
1040 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend the Capacity Development for the Simplified Formulation of Management Plan Under the Rehabilitation & Protection of Water Resources Supporting Irrigation Systems (R&P WRSIS) Program March 6, 2024 100 March 6, 2024 Attended the Capacity Development for the Simplified Formulation of Management Plan Under the Rehabilitation & Protection of Water Resources Supporting Irrigation Systems (R&P WRSIS) Program
 
1041 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend the Capacity Development for the Simplified Formulation of Management Plan Under the Rehabilitation & Protection of Water Resources Supporting Irrigation Systems (R&P WRSIS) Program March 7, 2024 100 March 7, 2024 Attended the Capacity Development for the Simplified Formulation of Management Plan Under the Rehabilitation & Protection of Water Resources Supporting Irrigation Systems (R&P WRSIS) Program
 
1042 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend the Capacity Development for the Simplified Formulation of Management Plan Under the Rehabilitation & Protection of Water Resources Supporting Irrigation Systems (R&P WRSIS) Program March 8, 2024 100 March 8, 2024 Attended the Capacity Development for the Simplified Formulation of Management Plan Under the Rehabilitation & Protection of Water Resources Supporting Irrigation Systems (R&P WRSIS) Program
 
1061 HERNAN, ALDEN PLANNING Drafting of Padada RIS Lat. B3 for modernization March 1, 2024 60 March 1, 2024 Inserted: (march 01- prepare dtr and other attachments - 8:00 a.m to 9;30 am), negotiate ROW at Cogon Bacaca, Kiblwan @ 1:00 pm onwards)
 
1063 HERNAN, ALDEN PLANNING Coordinate with O&M unit regarding on the inventory data provided, Draft MOA, revised WFP, Coordinate finance unit regarding on the WFP, Coordinate NCIP about WFP activities February 27, 2024 100 February 27, 2024 completed
 
1065 HERNAN, ALDEN PLANNING Work out modernization write-ups as per C.O comments and coordinate with O&M unit February 28, 2024 100 February 28, 2024 completed
 
1083 INTO, LEE WARREN PLANNING Prepare Back-to-Office Report for New Cabasagan CIS Project Validation conducted last February 21, 2024 March 8, 2024 100 March 4, 2024 Completed
 
1090 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony March 4, 2024 100 March 4, 2024 COMPLETED
 
1091 CUICO, JHO-ANN A. PLANNING Comply comments on the Davao occidental PIMP March 5, 2024 100 March 4, 2024 Tabulated data of MAIN WATERSHED (Lais River, Malita River, Sarangani River) LAND CLASSIFICATION, SOIL TYPE, LAND COVER, ADMINISTRATIVE MAP as per Data generated / new Boundaries of Davao Occidental.
 
1093 CUICO, JHO-ANN A. PLANNING Comply Coments on the Davao Occidental PIMP March 5, 2024 100 March 5, 2024 Prepared Layout Maps and Discuss for CADT AREA, Ground Water Availability, Tsunami Map, Liquefaction Map, Landslide Hazard Map, Flood Hazard Map, Ground Rupture Map, Prepared ADDITIONAL ACCOMPLISHMENTS: -Created final Shapefiles as per design Plan Can
 
1094 CUICO, JHO-ANN A. PLANNING Comply Comments on 3rd District, Davao City PIMP March 6, 2024 100 March 6, 2024 -Prepared Layout Map for CADT Map, Ground Water/wells Location Map, Soil Type, Land Used Map, Land Cover Map, Land classification, Main Watershed, Administrative Map, Land slide Hazard Map, Flood Hazard Map, Ground Rupture, Liquefaction Hazard Map, Tsunam
 
1095 CAYABYAB, REY JIM PLANNING Consolidate inputs as per comments for the finalization of District 3, Davao City PIMP March 6, 2024 100 March 6, 2024 Other accomplishments: Prepared Annex table 4 & 5 and Table 2-14, 2-15, and 2-16 of 3rd District, Davao City PIMP
 
1096 CAYABYAB, REY JIM PLANNING Finalize write-ups for the finalization of District 3, Davao City PIMP March 6, 2024 100 March 6, 2024 Other accomplishments: Prepared write-ups of Chapter 2.3 - Land Resources and Chapter 2.4.1.1 - Main Watershed Area within District 3, Davao City and Assisted in tabulation of Davao City Watershed
 
1103 INTO, LEE WARREN PLANNING Attend the Flag Raising Ceremony March 4, 2024 100 March 4, 2024 Attended on time.
 
1104 INTO, LEE WARREN PLANNING Prepare Back-to-Office Report for Padada CIS Project Validation conducted last February 22, 2024 March 8, 2024 100 March 5, 2024 Completed.
 
1105 INTO, LEE WARREN PLANNING Prepare Layout map for the site inspection of Padada CIS dam. March 8, 2024 100 March 5, 2024 Completed.
 
1106 INTO, LEE WARREN PLANNING Prepare Layout maps for the site inspection of New Cabasagan CIS Proposed location for protection dike and damaged canals. March 8, 2024 100 March 4, 2024 Completed.
 
1107 INTO, LEE WARREN PLANNING Assist in preparing tabulation of Davao River basins for PIMP. March 6, 2024 100 March 6, 2024 Completed.
 
1108 INTO, LEE WARREN PLANNING Costing of FSDE Funds (March 4 to 8, 2024) March 8, 2024 100 March 8, 2024 Completed.
 
1109 INTO, LEE WARREN PLANNING Prepare Convergence Report as of February 29, 2024 March 4, 2024 100 March 4, 2024 Completed.
 
1110 INTO, LEE WARREN PLANNING Attended the seminar Re: "Gender and Development: Magna Carta of Women and Safe Spaces Act" March 7, 2024 100 March 7, 2024 Attended.
 
1111 INTO, LEE WARREN PLANNING Prepared a draft response letter Re: "Request for fund Allocation for the Continuous Concreting of Canal Linings in District 1 to District 5 and Repair/rehab of Balawanan main dam and sub-dam" March 7, 2024 100 March 8, 2024 Completed.
 
1112 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Badagoy CIS Supplementary dam river profile and cross-section March 4, 2024 100 March 4, 2024 *Submitted *Other accomplishment : Prepare travel documents for surveying activities.
 
1113 MARTURILLAS, JOHN LLOYD PLANNING Plotting of New Silay SIP profile and cross-section of riverbed. March 5, 2024 100 March 5, 2024 Submitted Other accomplishment : Prepare travel documents for surveying activities.
 
1114 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Titugop SIP riverbed. March 6, 2024 50 March 6, 2024 Other accomplishment : Plotting of 9 Land use applications (completed) *Lack of survey data *Prepare travel documents for surveying activities. *Checking of survey data of Mal RIS LMC lateral E.
 
1115 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Mal RIS LMC lateral E March 7, 2024 20 March 7, 2024 Attended Seminar on Gender and Development : Magna Carta of Women and Safe Spaces Act.
 
1116 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Mal RIS LMC lateral E March 8, 2024 100 March 8, 2024 STA 0+000.00 to 3+621.18 Other accomplishment : Prepare travel documents for surveying activities
 
1118 SASUMAN, MARY LOUISE J. PLANNING Prepare assigned write-ups for Davao Occidental and District 3, Davao City PIMP March 5, 2024 100 March 5, 2024 Completed the assigned write-ups for Davao Occidental and District 3, Davao City PIMP.
 
1119 SASUMAN, MARY LOUISE J. PLANNING Prepare Commercial Sand and Gravel Certification March 6, 2024 100 March 6, 2024 Completed the CSAG certification and submitted for signatories.
 
1120 SASUMAN, MARY LOUISE J. PLANNING Prepare NWRB Certificate of Posting March 4, 2024 100 March 4, 2024 Completed.
 
1121 SASUMAN, MARY LOUISE J. PLANNING Submit the revised PIMP for Davao Occidental and District 3, Davao City to RO via Google Drive March 6, 2024 100 March 6, 2024 Completed. Already submitted the PIMP for Davao Occidental and District 3, Davao City to RIO via google drive.
 
1122 SASUMAN, MARY LOUISE J. PLANNING Print and bind the final and revised PIMP for Davao del Sur, Davao Occidental, and District 3, Davao City March 8, 2024 100 March 8, 2024 Completed. Already accomplished printing and binding. Submitted for signatories.
 
1123 SASUMAN, MARY LOUISE J. PLANNING Conduct inspection for the drilling activities in Cogon Bacaca SRIP with RO Geologists March 8, 2024 100 March 8, 2024 Completed.
 
1128 HERNAN, ALDEN PLANNING Drafting of Padada RIS Lat. B3 for modernization March 4, 2024 100 N/A completed
 
1129 HERNAN, ALDEN PLANNING Drafting of Padada RIS SMIA MC March 5, 2024 100 March 5, 2024 completed
 
1130 HERNAN, ALDEN PLANNING Drafting of Padada RIS SMIA Lat. A and Lat. A1 modernization March 6, 2024 100 N/A inserted work: drafting of request letter re certifications: CNO/CP -completed
 
1131 HERNAN, ALDEN PLANNING Attend seminar on Gender and Development at IA federation Building March 7, 2024 100 March 7, 2024 completed
 
1132 HERNAN, ALDEN PLANNING Coordinate NCIP for the conduct of FBI, polished drafting of SMIA Lat. A and Lat. A1 March 8, 2024 100 March 8, 2024 inserted work: update WAR
 
1133 CAYABYAB, REY JIM PLANNING Submit the revised PIMP of District 3, Davao City through Google Drive March 6, 2024 100 March 6, 2024
 
1134 CAYABYAB, REY JIM PLANNING Attend Seminar on Gender and Development: Magna Carta of Women and Safe Spaces Act March 7, 2024 100 March 7, 2024 Other accomplishment: Printing of Annex tables and annexes of 3rd District, Davao City PIMP
 
1136 CUICO, JHO-ANN A. PLANNING Attend Seminar on Gender and Development: Magna Carta of Women and Safe Spaces Act March 7, 2024 100 March 7, 2024 Additional Accomplishments: Printing, Binding, Folding of PIMP (Davao City, Davao Occidental and Davao City (6 copies))
 
1138 LUARDO, GLENN D. PLANNING Revise write-ups and prepare tables and figures for the 3rd District, Davao City PIMP (2020-2030) March 6, 2024 100 March 6, 2024 On March 5, 2024; Completed revised write-ups of tables 2-4, 2-6 , table annex 1&2, & figures 2-3 & 2-4 for 3rd District, Davao City PIMP (2020-2030) 100%.
 
1139 LUARDO, GLENN D. PLANNING Printing 2 copies of the 3rd District, Davao City PIMP (2020-2030) and Annexes of Davao del Sur, Davao Occidental and 3rd District of Davao City. March 7, 2024 100 March 7, 2024
 
1140 LUARDO, GLENN D. PLANNING Binding 6 copies of PIMP (Davao del Sur, Davao Occidental, and 3rd District of Davao City) for submission to NIA RIO XI. March 8, 2024 100 March 8, 2024 Other accomp.: Prepared data information of SMIA and response letter to the CJC College of Engineering request to be used for the methods of research & community awareness purposes (100%).
 
1141 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony March 4, 2024 100 March 4, 2024
 
1142 LUARDO, GLENN D. PLANNING Revise write-ups and prepare tables and figures for Chapter 6 of Davao Occidental PIMP (2020-2030) March 4, 2024 100 March 4, 2024 Other Accomp.: Completed Revised write-ups and prepared tables and figures for Chapter 2 of Davao Occidental PIMP (2020-2030) 100%.
 
1143 CUICO, JHO-ANN A. PLANNING Organize Shapefiles for PRIS Modernization FSR as per comments (Preparation for layouting as per new boundary Generated) March 8, 2024 100 March 8, 2024 Additional Accomplishments: Organized Shapefiles for PRIS Modernization FSR as per comments (Preparation for layouting as per new boundary Generated), Pampering with Memorandum Circular, Prepared Layout map for PANAGLIB CIS and MOAB SIP for PCR Documents
 
1145 EUGENIO, VENANN PLANNING Consolidate Davao Occidental PIMP. March 6, 2024 100 March 6, 2024 Mar. 4, 2024 - 30% Consolidated Davao Occidental PIMP. 100% Locate parcel of NIA DDS-IMO Assets within Matanao.
 
1146 EUGENIO, VENANN PLANNING Consolidate Davao Occidental PIMP. March 6, 2024 100 March 6, 2024 Mar. 5 - 80% Consolidated Davao Occidental PIMP.
 
1147 EUGENIO, VENANN PLANNING Consolidate Davao Occidental PIMP. March 6, 2024 100 March 6, 2024 Mar. 6, 2024 - 100% Consolidated Davao Occidental PIMP. 100% Recalculate the Estimated Dependable Water Supply of Davao River.
 
1148 EUGENIO, VENANN PLANNING Print 2 copies of Davao Occidental PIMP. March 7, 2024 100 March 7, 2024 Completed. Actual Additional Accomplishment: Mar. 7, 2024 - 50% Edit and recalculate shapefiles for Estimated Total Irrigable Area of Davao del Sur PIMP.
 
1151 EUGENIO, VENANN PLANNING Attend National Women's Month Celebration - Pampering Services. March 8, 2024 100 March 8, 2024 Completed. Additional Actual Accomplishment: Mar. 8, 2024 - 100% - Edit and recalculate shapefiles for Estimated Total Irrigable Area of Davao del Sur PIMP. 100% - Print updated chapters of Davao del Sur PIMP due to recalculated ETIA. Updated onlin
 
1153 CAYABYAB, REY JIM PLANNING Prepare draft response letter to MIBASFECIA March 8, 2024 100 March 8, 2024 Other accomplishment: Assist in binding Davao del Sur, Davao Occidental, and 3rd District, Davao City PIMP
 
1155 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Balasiao CIS CY2023 March 8, 2024 100 March 8, 2024 Completed
 
1178 CAYABYAB, REY JIM PLANNING Printed - Overall POW of Saloy 2 SIP March 15, 2024 75 March 12, 2024 On March 12, 2024 - Printed overall POW of Saloy 2 SIP for Checking.
 
1179 INTO, LEE WARREN PLANNING Printed - Overall POW of Suawan Tamugan SIP March 15, 2024 75 March 12, 2024 Printed Draft for checking by supervisor.
 
1180 INTO, LEE WARREN PLANNING Printed - Overall POW of Waterfall SIP March 15, 2024 75 March 12, 2024 Printed Draft for Checking By Advisor.
 
1188 LUARDO, GLENN D. PLANNING Attend Conduct of Public Consultation for the Feasibility Study of Pagan Small Reservoir Irrigation Project March 13, 2024 100 March 13, 2024 Actual Accomp.: Attended the Courtesy Call to the NIA RIO XI Director & Brgy. Officials of Brgy. Tamugan with regards to the conduct of Public Consultation of the proposed Pagan SRIP (100%).
 
1189 LUARDO, GLENN D. PLANNING Attend Conduct of Public Consultation for the Feasibility Study of Pagan Small Reservoir Irrigation Project March 14, 2024 100 March 14, 2024 Actual Accomp.: Assisted the Conduct of Public Consultation meeting for the Feasibility Study of Pagan SRIP @ Brgy. Hall of Brgy. Tamugan, Marilog District, Davao City.
 
1190 LUARDO, GLENN D. PLANNING Attend Conduct of Public Consultation for the Feasibility Study of Pagan Small Reservoir Irrigation Project March 15, 2024 100 March 15, 2024 Actual Accomp.: Attended the Exit Conference @ NIA DDS-IMO with regards to the conducted Public Consultation meeting for the Feasibility Study of Pagan SRIP @ Brgy. Tamugan, Marilog District, Davao City. (100%)
 
1191 CAYABYAB, REY JIM PLANNING Attend Virtual Meeting on the invitation to the Online Report on Davao City and Davao del Sur's February 2024 Inflation March 13, 2024 100 March 13, 2024
 
1192 SASUMAN, MARY LOUISE J. PLANNING Attend Consultative Meeting on the Creation of Watershed Management Planning Team (WMPT) on the characterization cum vulnerability Assessment Balutakay Waterhsed March 13, 2024 100 March 13, 2024 Attended the meeting.
 
1203 EUGENIO, VENANN PLANNING Printed Inventory Report of Miral SRIS March 15, 2024 100 March 13, 2024 Printed Mar 13, 2024. Submitted to MLCJ for checking. Mar. 11, 2024- 100% - Edit Miral SRIS Form B & Form C as per corrections. 70% - Edit attribute table of Miral SRIS irrigation canal as per latest inventory prioritization of canal repair.
 
1204 CAYABYAB, REY JIM PLANNING Response communication letter from the Kabula Irrigators Association requesting for a Solar Water Pump 150 or more less hectares March 14, 2024 75 March 12, 2024 On March 12, 2024 - Printed draft response letter for Kabula IA.
 
1205 CAYABYAB, REY JIM PLANNING Proposal for the conduct of semestral Assessment and Evaluation Activity of Davao del Sur Irrigation Management Office Planning and Design Unit March 15, 2024 100 March 15, 2024 Prepared and submitted proposal for semestral assessment and evaluation activity.
 
1206 INTO, LEE WARREN PLANNING Submit the signed and final list of FY 2025 AIP to RIO PDS March 14, 2024 100 February 13, 2024 Submitted advance e-copy to RIO. Hard copy for signing by Acting Division Manager.
 
1207 MARTURILLAS, JOHN LLOYD PLANNING Encoding of Pagan SRIP leveling data March 13, 2024 35 March 12, 2024 *Plotted 4 land use applications
 
1208 MARTURILLAS, JOHN LLOYD PLANNING Encoding of Pagan SRIP leveling data March 12, 2024 100 March 13, 2024 Completed
 
1209 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Titugop SIP riverbed March 11, 2024 100 March 11, 2024 Completed
 
1222 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of Program and Lay-out of tarpaulin for the upcoming Semestral Assessment. March 11, 2024 100 March 11, 2024 Prepared Program and Lay-out of tarpaulin for the upcoming Semestral Assessment.
 
1223 ENCABO, PRINCESS SHAIRA MAE PLANNING Monitoring of on-site field personnel works with the coordination of assigned personnel therein. March 11, 2024 100 March 11, 2024 Monitored on-site field personnel works with the coordination of assigned personnel therein.
 
1224 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of invitation letter for the RIO personnel as part of the preparation of Semestral Assessment. March 12, 2024 100 March 12, 2024 Completed and submitted.
 
1225 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of presentation/documentation pertinent for the Semestral Assessment and Monitoring. March 12, 2024 100 March 12, 2024 Prepared and edited as per comments on the content of the presentation.
 
1227 ENCABO, PRINCESS SHAIRA MAE PLANNING Compile and label the documents/reports of the IWRMP-related matters for Padada and Mal RIS. March 13, 2024 100 March 13, 2024 Completed.
 
1228 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate delivery of tree guard sets on Year 2 plantation sites. March 13, 2024 100 March 13, 2024 Initially delivered tree guard sets on Brgy. Langa-an, Matanao.
 
1229 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend Pre-Deployment Seminar for the Newly Hired Staff and Re-Orientation of the Existing Employees March 14, 2024 100 March 14, 2024 Attended Pre-Deployment Seminar for the Newly Hired Staff and Re-Orientation of the Existing Employees
 
1230 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend Pre-Deployment Seminar for the Newly Hired Staff and Re-Orientation of the Existing Employees March 15, 2024 100 March 15, 2024 Other accomplishment: - Nursery visit for the preparation of the upcoming activity of IWRMP. - Coordination meeting with field personnel. - Site visit and monitoring of plantation sites. - Send data files as per requested by the CO Personnel relative
 
1254 ESPADERA, MA LOURDES PLANNING Advance Topo Survey Report of Pagan SRIP March 15, 2024 100 March 15, 2024
 
1261 EUGENIO, VENANN PLANNING Printed Inventory Report of Miral SRIS March 15, 2024 100 March 13, 2024 Printed Mar 13, 2024. Submitted to MLCJ for checking. Mar 12, 2024 - 100% - Edit attribute table of Miral SRIS irrigation canal as per latest inventory prioritization of canal repair; 100% - Add new documented check structures and canals on Miral SRIS inv
 
1262 CUICO, JHO-ANN A. PLANNING Attended Flad Raising Ceremony March 11, 2024 100 March 11, 2024 Completed
 
1263 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents, Record/Input data to LUC LOGBOOK Certifications to O&M Tracker March 11, 2024 100 March 11, 2024 Completed
 
1264 LUARDO, GLENN D. PLANNING Prepare tables on Chapter 4 for FS Report of the Proposed Bagumbayan SPIP. March 12, 2024 60 March 12, 2024 Actual Accomp. Prepared Tables 2, 8, 9, 10, 11, 12, 13 & 14 on Chapter 4 for FS Report of the proposed Bagumbayan SPIP (100%).
 
1265 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony March 11, 2024 100 March 11, 2024
 
1267 LUARDO, GLENN D. PLANNING Prepare response letter and documents to the Cor Jesu College Engineering Department personnel for the requested data with regards to the Water Quality results, existing problem and General Layout Map of San Miguel Irrigators Association (SMIA). March 11, 2024 100 March 12, 2024
 
1270 CAYABYAB, REY JIM PLANNING Attend Pre-Deployment Seminar for the Newly Hired Staff and Re-Orientation of the Existing Employees March 14, 2024 100 March 14, 2024
 
1271 CAYABYAB, REY JIM PLANNING Attend Pre-Deployment Seminar for the Newly Hired Staff and Re-Orientation of the Existing Employees March 15, 2024 100 March 15, 2024
 
1274 ESPADERA, MA LOURDES PLANNING Prepare response communication letter to Altrade Inc letter March 15, 2024 100 March 14, 2024
 
1275 HERNAN, ALDEN PLANNING Coordinate with NCIP for the the final WFP, also for Kisulan PIP, draft BOTR of Public Meeting of Cogon Bacaca SRIP March 11, 2024 100 March 11, 2024 completed
 
1276 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for SALOY 2 SPIP MAIN CANAL: Sta. 0+000.00 - 0+738.86, LATERAL A: Sta. 0+000.00 - 0+214.20, Access Road: Sta. 0+000.00 - 0+592.37, Canal Structures, ROad Structures March 12, 2024 100 March 11, 2024 Actual Accomplishments: Prepared Layout Map for SALOY 2 SPIP MAIN CANAL: Sta. 0+000.00 - 0+738.86, LATERAL A: Sta. 0+000.00 - 0+214.20, Access Road: Sta. 0+000.00 - 0+592.37, Canal Structures, Road Structures, Scanned Back to Office Report per Systems (40
 
1277 HERNAN, ALDEN PLANNING Drafting of CARFA CIS protection works- polishing of dike cross section March 12, 2024 100 March 12, 2024 completed
 
1278 HERNAN, ALDEN PLANNING Drafting of CARFA CIS- detail of weepholes, ypical cross-section of PW, Typical end of P.W, labeling/editing March 15, 2024 50 March 15, 2024 inserted activity: pre-deployment seminar (march 14-15)
 
1283 CUICO, JHO-ANN A. PLANNING Prepared Layout maps for POW, PRC, Turnover Attachments March 12, 2024 100 March 12, 2024 Prepared Layout maps for POW Attachment MAL RIS RMC Lateral F2 (Sta. 0+412.00 - 0+451.86, 0+46259 - 0+500.00); RMC Lateral B Spl. (Sta.: 0+342.00 - 0+794.90); RMC Lateral A (Sta. 4+862.00 - 5+395.81); RMC Lateral E (Sta. 2+397.00 - 2+437.00); RMC Lateral
 
1292 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW, PCR, Turnover, attachments; Received, Record, Reproduce Engineering Documents March 15, 2024 100 March 13, 2024 Actual Accomplishments: Prepared Layout maps for POW Attachment MAL RIS RMC Lateral F2 (Sta. 0+412.00 - 0+451.86, 0+46259 - 0+500.00); RMC Lateral B Spl. (Sta.: 0+342.00 - 0+794.90); RMC Lateral A (Sta. 4+862.00 - 5+395.81); RMC Lateral E (Sta. 2+397.00 -
 
1293 EUGENIO, VENANN PLANNING Printed Inventory Report of Miral SRIS March 15, 2024 100 March 13, 2024 Printed Mar 13, 2024. Submitted to MLCJ for checking. Mar 13, 2024 - 100% - Prepare and submit write-up of Miral SRIS inventory for checking (Narrative, Table, etc.)
 
1294 EUGENIO, VENANN PLANNING Printed Inventory Report of Miral SRIS March 15, 2024 100 March 13, 2024 Printed Mar 13, 2024. Submitted to MLCJ for checking. Mar 14, 2024 - 100% - Generate watershed area of Bagumbayan SPIP; 100% - Prepare Coconut Irrigation Water Requirement Computation and Cropping Calendar for Bagumbayan SPIP; 100% - Prepare Banana Irriga
 
1295 EUGENIO, VENANN PLANNING Printed Inventory Report of Miral SRIS March 15, 2024 100 March 15, 2024 Submit corrected Miral SRIS inventory. Mar 15, 2024 100% - Prepare Sugarcane Irrigation Water Requirement Computation and Cropping Calendar for Bagumbayan SPIP; 100% - Print, bind and submit corrected write-up of Miral SRIS inventory.
 
1296 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for BAGUMBAYAN PIP FSR March 11, 2024 45 March 11, 2024 Actual Accomplishments: Prepared Layout Maps for BAGUMBAYAN PIP (6 Layouts), Only 2 Layout Maps finished (Administrative Map & Location Map) due to Lacking data of final Proposed Pumps Locations
 
1297 CUICO, JHO-ANN A. PLANNING Attended Pre-Deployment Seminar for newly hired staff and Re-Orientation of the existing employees of NIA Davao Del Sur Imo March 14, 2024 100 March 14, 2024 Additional Accomplishments: Prepared Layout Map for POW attachment of PADADA RIS: Sta. 1+356.60 - 1+366.00 (9.40 Meters), Received , Record, Reproduce engineering Documents
 
1298 CUICO, JHO-ANN A. PLANNING Attended Pre-Deployment Seminar for newly hired staff and Re-Orientation of the existing employees of NIA Davao Del Sur Imo March 15, 2024 100 March 15, 2024 Attended Pre-Deployment Seminar for newly hired staff and Re-Orientation of the existing employees of NIA Davao Del Sur Imo, Received, Record, Reproduce Engineering Documents
 
1299 ESPADERA, MA LOURDES PLANNING Finalize plotting of Padada RIS - Lateral B4 (0+000 - 3+328.53) March 11, 2024 100 March 11, 2024
 
1300 ESPADERA, MA LOURDES PLANNING Finalize plotting of Padada RIS Modernization (DE)- SKMC (0+000 - 3+783.69) March 11, 2024 100 March 11, 2024
 
1301 ESPADERA, MA LOURDES PLANNING Finalize plotting of Padada RIS Modernization (DE)- SKLA (0+000 - 1+970.72) March 12, 2024 100 March 12, 2024
 
1302 ESPADERA, MA LOURDES PLANNING Finalize plotting of Padada RIS Modernization (DE)- PARAT RMC (0+000 - 0+959.00) March 12, 2024 100 March 12, 2024
 
1303 ESPADERA, MA LOURDES PLANNING Finalize plotting of Padada RIS Modernization (DE)- LATERAL B (0+000 - 7+160.34) March 13, 2024 100 March 13, 2024
 
1304 ESPADERA, MA LOURDES PLANNING Prepare TEV of the attendees for the upcoming survey training on March 19-22, 2024 March 14, 2024 100 March 14, 2024
 
1305 ESPADERA, MA LOURDES PLANNING Drafted Request Letter for Additional Survey Personnel March 15, 2024 100 March 15, 2024
 
1306 ESPADERA, MA LOURDES PLANNING Train Mr. Albores Plotting of Survey Data using Civil 3D March 15, 2024 100 March 12, 2024
 
1307 ESPADERA, MA LOURDES PLANNING Other Miscellaneous Task: Checking plotted lots for Land Use Conversion Application Update Accomplishment and Schedule of Survey Team March 13, 2024 100 N/A Additional: Follow-up Sending of Comm Letters to Brgy Tamugan and Tambobong for Public Consultation Follow - up quotation for the charging pins of RTK from the supplier
 
1308 MARTURILLAS, JOHN LLOYD PLANNING NIA XI DAVAO DEL SUR IMO PRE-DEPLOYMENT SEMINAR FOR THE NEWLY HIRED STAFF AND RE-ORIENTATION OF EXISTING EMPLOYEES March 14, 2024 100 March 14, 2024 *Other accomplishment : Plotted MAL RIS SUPPLEMTARY CANAL RMC STA 0+000 - STA 1+449
 
1309 MARTURILLAS, JOHN LLOYD PLANNING NIA XI DAVAO DEL SUR IMO PRE-DEPLOYMENT SEMINAR FOR THE NEWLY HIRED STAFF AND RE-ORIENTATION OF EXISTING EMPLOYEES March 15, 2024 100 March 15, 2024
 
1311 INTO, LEE WARREN PLANNING Attend Flag Ceremony March 11, 2024 100 March 11, 2024 Attended.
 
1312 INTO, LEE WARREN PLANNING Costing of FSDE Funds (March 11-15, 2024) March 15, 2024 100 March 15, 2024 Reconciled with RAOCO as of 3/13/2024. Completed.
 
1313 INTO, LEE WARREN PLANNING Attended 2-day "Pre-deployment Seminar for the Newly Hired Staff and Re-Orientation of Existing Employees" March 15, 2024 100 March 15, 2024 Attended.
 
1314 INTO, LEE WARREN PLANNING Edited, Finalized and re-submitted response letter Re: REQUEST FOR FUND ALLOCATION FOR CONTINUOUS CONCRETING OF CANAL LINING, REPAIRS OF BALAWANAN MAIN DAM AND BALAWANAN SUB-DAM AND REPAIRS OF OTHER NIA EXISTING PROJECTS FROM DISTRICT 1-6 OF DAVAO DEL SUR March 14, 2024 100 March 14, 2024 Completed.
 
1315 SASUMAN, MARY LOUISE J. PLANNING Gathered secondary data and prepared write-ups for the proposed Bagumbayan PIP FSR. March 12, 2024 80 March 12, 2024 Actual Accomplishment: 100% completion on Chapter 1: Introduction, Chapter 6: Geology and Chapter 7: Surveying and Mapping and 75% completion on Chapter 9: Environmental and Social Assessment
 
1316 SASUMAN, MARY LOUISE J. PLANNING Prepare Commercial Sand and Gravel Certification. March 13, 2024 100 March 13, 2024 Completed.
 
1317 SASUMAN, MARY LOUISE J. PLANNING Prepare NWRB Certificate of Notice of Posting March 13, 2024 100 March 13, 2024 Completed.
 
1318 SASUMAN, MARY LOUISE J. PLANNING Attend Pre-Deployment Seminar for the Newly Hired Staff and Re-Orientation of the Existing Employees March 15, 2024 100 March 14, 2024 Attended the seminar on March 14-15, 2024.
 
1368 CAYABYAB, REY JIM PLANNING Prepare Chapter 8 - Engineering plans, Designs, and Estimates of Bagumbayan PIP FSR March 13, 2024 100 March 13, 2024
 
1369 INTO, LEE WARREN PLANNING Prepare FSDE Report as of March 15, 2025 March 18, 2024 100 March 18, 2024 Prepared and submitted advance e-copy to RIO.
 
1370 INTO, LEE WARREN PLANNING Attend Flag Ceremony. March 18, 2024 100 March 18, 2024 Attended on time.
 
1386 INTO, LEE WARREN PLANNING Prepare Funding Requirement for personnel charged to FSDE Funds March 20, 2024 100 March 20, 2024 Prepared and provide 1 copy to supervisor.
 
1387 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Basiawan SPIP (EGPIP-Solar) (10M). March 19, 2024 100 March 19, 2024 Prepared and provide 5 copies to programmer.
 
1388 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Titugop SIS -Supplemental. March 19, 2024 100 March 19, 2024 Prepared and provide 5 copies to programmer.
 
1416 EUGENIO, VENANN PLANNING Update hydrological aspect of Padada RIS Modernization as per CO comments March 29, 2024 100 N/A Mar. 18 - 100% Finalize Inventory Report of Miral SRIS 100% Reproduce Inventory Report of Miral SRIS 100% Edit cropping pattern and cropping calendar of Padada River water source for the Banana and rice and 50% for Munbean and Watermelon
 
1418 EUGENIO, VENANN PLANNING Attend STI Planning Workshop March 19, 2024 100 March 19, 2024 Day 1 Completed.
 
1419 EUGENIO, VENANN PLANNING Attend Davao del Sur STI Planning Workshop March 20, 2024 100 March 20, 2024 Last day of workshop completed.
 
1420 EUGENIO, VENANN PLANNING Attend Regional PSABE-SEM Convention March 21, 2024 100 March 21, 2024 Day 1 Completed
 
1421 EUGENIO, VENANN PLANNING Attend Regional PSABE-SEM Convention March 22, 2024 100 March 22, 2024 Day 2 Completed.
 
1427 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation for the conduct of Semestral Assessment and Monitoring for Year 1 Implementation of IWRMP in Padada and Mal RIS. March 18, 2024 100 March 18, 2024 Completed.
 
1428 ENCABO, PRINCESS SHAIRA MAE PLANNING Checking of DTRs and preparation of payrolls of Year 1 & 2 personnel of Padada & Mal RIS. March 18, 2024 100 March 18, 2024 Completed and submitted DTRs & Payrolls.
 
1429 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend/present/assist in the conduct of Semestral Monitoring and Assessment for Year 1 Implementation of Padada & Mal RIS. March 19, 2024 100 March 19, 2024 Presented the Year 1 and Year 2 Accomplishments & Status for Padada and Mal RIS as part of the Semestral Monitoring and Assessment.
 
1430 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend/present/assist in the conduct of Semestral Monitoring and Assessment for Year 1 Implementation of Padada & Mal RIS. March 20, 2024 100 March 20, 2024 Site visited Year 1 & 2 plantation sites & model farm in Padada RIS together with the RIO and CO Personnel.
 
1431 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend/present/assist in the conduct of Semestral Monitoring and Assessment for Year 1 Implementation of Padada & Mal RIS. March 21, 2024 100 March 21, 2024 Site visited Year 1 & 2 plantation sites & model farm in Mal RIS together with the RIO and CO Personnel.
 
1432 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend/present/assist in the conduct of Semestral Monitoring and Assessment for Year 1 Implementation of Padada & Mal RIS. March 22, 2024 100 March 22, 2024 Attended the Exit Conference for the conducted Semestral Monitoring and Assessment for Year 1 Implementation of Padada & Mal RIS.
 
1448 CUICO, JHO-ANN A. PLANNING Flag Raising ceremony March 18, 2024 100 March 18, 2024 Completed
 
1449 CUICO, JHO-ANN A. PLANNING Assist Documents Preparation for Semestral Monitoring and Assessment for IWRMP in PADADA RIS and MAL RIS March 18, 2024 100 March 18, 2024 Completed
 
1451 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachment of BADOMA CIS MAIN CANAL: Sta. 1+827.50 - 2+828.30 = 843 Meters March 18, 2024 100 March 18, 2024 Completed
 
1452 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents March 18, 2024 100 March 18, 2024 Completed
 
1453 SASUMAN, MARY LOUISE J. PLANNING Prepare and finalize the Impact Management Plan (IMP) for Padada RIS Modernization FSR. March 22, 2024 100 March 21, 2024 Completed and finalized the IMP for Padada RIS Modernization FSR.
 
1454 SASUMAN, MARY LOUISE J. PLANNING Prepare and finalize the Environmental Monitoring Plan (EMoP) for Padada RIS Modernization FSR. March 22, 2024 100 March 22, 2024 Completed and finalized the EMoP for Padada RIS Modernization FSR.
 
1455 SASUMAN, MARY LOUISE J. PLANNING Assist in the opening program of the Semestral Monitoring and Assessment for IWRMP in Padada RIS and Mal RIS March 18, 2024 100 March 18, 2024 Assisted the opening program of the semestral monitoring and assessment of IWRMP in Padada RIS and Mal RIS. Other accomplishment: Attended flag raising ceremony. Released to the applicant the approved Sand and Gravel Certification.
 
1456 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachment of MAL RIS_CY 2021 KIMIA IA, LAGOMIA IA, SAFIA IA, LOTOFIA IA, WESLASUFIA IA, KAMOFIA IA (Construction of Deep Well and Pump House), BURLAN IA, LABAKAFIA IA, TIFIA IA (Installation of Water Connection), Input Data to March 18, 2024 100 March 18, 2024 Completed
 
1457 SASUMAN, MARY LOUISE J. PLANNING Tabulate the status of accomplishment of the Padada RIS Modernization FSR March 19, 2024 100 March 19, 2024 Completed. Tabulated and follow-up to the assigned personnel each comment for each discipline of PRIS Modernization FSR. Other accomplishment: Accomplished 40% of the final IMP.
 
1458 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for BAGUMBAYAN PIP FSR March 22, 2024 45 N/A Due to Lacking Data
 
1459 SASUMAN, MARY LOUISE J. PLANNING Attend Provincial Mining Regulatory Board (PMRB) meeting March 22, 2024 100 March 22, 2024 Completed.
 
1460 SASUMAN, MARY LOUISE J. PLANNING Carry-over: Completion on Bagumbayan PIP FSR, specifically, Chapter 9: Environmental and Social Assessment March 22, 2024 85 March 22, 2024 Other accomplishment: Attended exit conference of the Semestral Monitoring and Assessment of IWRMP in Padada RIS and Mal RIS. Tabulated the accomplishment of Padada RIS Modernization FSR. Prepare draft proposal for PRIS geores survey.
 
1461 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter for the resumption of drilling activity in Cogon Bacaca SRIP to be submitted to RIO March 21, 2024 80 March 21, 2024 Completed the draft communication letter for review and comments of the PDU head.
 
1462 CUICO, JHO-ANN A. PLANNING Assisted semestral Monitoring and Assessment for IWRMP in PADADA RIS and MAL RIS Program, Received, Record, Reproduced Engineering Documents, Input data to LUC Logbook certification tracker for O&M March 19, 2024 100 March 19, 2024 Additional accomplishments: Prepared Layout Map for PRIS Modernization as per Comment from Central Office and New Boundaries Generated (Proposed Automated Headgates, Figure 1.4.2. 2019, 2020, 2021, 2022 Padada RIS Firmed-up Service Area, Kitaha Creek-Dig
 
1463 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony March 18, 2024 100 March 18, 2024
 
1464 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Wangan SIS. March 21, 2024 100 March 21, 2024 Prepared and provided 5 copies to programmer.
 
1465 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Mal RIS (CCAW-NIS) (Construction of Protection Dike at Mal RIS Dam Upstream L/S & R/S and Repair of Sluice Gate) March 21, 2024 100 March 21, 2024 Prepared and provided 5 copies to programmer.
 
1466 CAYABYAB, REY JIM PLANNING Prepare draft response letter to Brgy. Bantol, Marilog District, Davao City March 18, 2024 75 March 18, 2024 Submitted draft response letter (for checking)
 
1467 INTO, LEE WARREN PLANNING Prepare typical design plans for Canal Structures listed under Table 3.2.3 of Padada RIS Modernization for Annex B.6 March 22, 2024 100 March 25, 2024 Completed
 
1468 CAYABYAB, REY JIM PLANNING Prepare write-ups on Chapter 4.2.8 and 5.3 of Bagumbayan PIP FSR March 18, 2024 100 March 18, 2024
 
1469 LUARDO, GLENN D. PLANNING Prepared Tables for Prod. Cost/hectare of Coconut, Sugarcane, Banana & Rice; Rice Price Assumption & NPV for the Proposed Bagumbayan PIP. March 18, 2024 100 March 18, 2024
 
1470 INTO, LEE WARREN PLANNING Prepare detailed estimate for Canal Structures as compliance to CO's comments on Padada RIS Modernization "Project Cost". March 22, 2024 100 March 27, 2024 Completed. E-file saved at Team Collab.
 
1471 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachment of BASIAWAN PIP (HDPE Pipe Canal Supply Pipe 1: Sta. 0+000.00 - 0+342.00, Installation of Electro-Mechanical Works, Construction of Powerhouse, Installation of Reservoir Tank) - 10M-EGPIP_additional Fund March 19, 2024 100 March 19, 2024 Completed
 
1472 CAYABYAB, REY JIM PLANNING Prepare detailed cost estimate on access and service roads under Civil Works I - System Improvement of Padada RIS Modernization FSR March 18, 2024 100 March 18, 2024
 
1473 LUARDO, GLENN D. PLANNING Attended and participated in the semestral Monitoring and Assessment for IWRMP in PADADA RIS and MAL RIS Program. March 19, 2024 100 March 19, 2024
 
1474 CAYABYAB, REY JIM PLANNING Prepare detailed cost estimate on Protection Works and Canalization Works under Civil Works I - System Improvement of Padada RIS Modernization FSR March 19, 2024 100 March 19, 2024
 
1475 CUICO, JHO-ANN A. PLANNING Created / Delaminated ni shapefiles of BASIAWAN PIP as per final Plan from Design, Prepared Layout Map of BASIAWAN PIP for Overall POW Attachment March 22, 2024 100 March 20, 2024 Additional Accomplishments: Prepared Layout Map for PRIS Modernization as per comment from Central Office and new Boundary generated (Figure 2.1.1 General Layout of the whole Watershed Area, Figure 2.1.2 Catchment Area of Padada River Intake) Prepared Lay
 
1476 CAYABYAB, REY JIM PLANNING Prepare Padada RIS Drainage canal inventory for Modernization FSR using the available survey data March 20, 2024 100 March 20, 2024
 
1477 CAYABYAB, REY JIM PLANNING Prepare Padada RIS Drainage canal structures inventory for Modernization FSR using the available survey data March 21, 2024 100 March 21, 2024
 
1478 LUARDO, GLENN D. PLANNING Reviewed and supplemented required data for table 10.1.8-9 (Production Input & Price Assumption for Mungbean & Melon) & table 2.2.7-1 (Present Labor requirement for Banana) for Padada RIS Modernization Program. March 20, 2024 100 March 22, 2024 On Mar. 22, 2024 - Completed required data for Table 10.1.8-9 & Table 2.2.7-1 for Padada RIS Modernization Program (100%). Other accomp.: Assist 2 applicants for Transfer of Title (TOT) (100%).
 
1480 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachment of MAL RIS (Main dam Mal RIS Sta: 0+009.74 - 0+095.93 L/S, 0+035.01 - 0+054.49 R/S, Diversion Works) Received, Record, Reproduce Engineering Documents, BADOMA CIS (Sta: 1+764.96-1+825.11 = 60.15M) March 21, 2024 100 March 21, 2024 Additional Accomplishments: Prepared Layout Map for POW Attachment LANURO CIS Sta: Along Main Canal (Access Roads sta: 0+604.60 - 1+197.00 = 592.40M, Access Roads sta: 0+000.00 - 0+328.47 = 328.47m) RESTO CIS, Received, Record, Reproduce Engineering Doc.
 
1481 LUARDO, GLENN D. PLANNING Update required data for Table 2.3.1 (Future land Use, Cropped Area, Cropping Intensity, Yield & Production) & Table 10.1.12&13 (Production Cost/Hectare of Mungbean & Water Melon) for Padada RIS Modernization Program. March 21, 2024 100 March 21, 2024 Other Accomplishments: Assisted 2 applicants for Land Use Classification (LUC) and releasing of Certificate for Transfer of Title (TOT) for 1 applicant (100%)
 
1482 CUICO, JHO-ANN A. PLANNING Prepared layout map for Padada RIS Modernization as per comment from Central Office and New Boundary Generated (Figure 2.1.4 Catchment Area of SMIA River Intake, Figure 2.1.5 Catchment Area for Padada RIS Expansion, Figure 2.1.6. Location Map Padada RIS March 22, 2024 100 March 21, 2024 COMPLETED
 
1483 ESPADERA, MA LOURDES PLANNING Attended Orientation and Workshop on Survey and mapping preparatory to Detailed Engineering March 19, 2024 100 March 19, 2024
 
1486 ESPADERA, MA LOURDES PLANNING Attended Orientation and Workshop on Survey and mapping preparatory to Detailed Engineering March 20, 2024 100 March 20, 2024
 
1487 ESPADERA, MA LOURDES PLANNING Attended Orientation and Workshop on Survey and mapping preparatory to Detailed Engineering March 21, 2024 100 March 21, 2024
 
1490 ESPADERA, MA LOURDES PLANNING Prepare DTR, and WAR March 18, 2024 100 March 18, 2024
 
1491 ESPADERA, MA LOURDES PLANNING Checking and conforming of survey personnel DTR and WAR March 18, 2024 100 March 18, 2024
 
1493 ESPADERA, MA LOURDES PLANNING Prepare Payroll for Local Personnel at Suawan SRIP March 18, 2024 100 March 18, 2024
 
1495 ESPADERA, MA LOURDES PLANNING Update Accomplishment of Surveying and Plotting Activities as of March 15, 2024 March 18, 2024 100 March 18, 2024
 
1497 ESPADERA, MA LOURDES PLANNING Other Miscellaneous Task: Identify lot area location for LUC Application Facilitate tracking of advance TEV for survey personnel Prepare Travel Order Request for the survey training March 18, 2024 100 March 18, 2024
 
1498 ESPADERA, MA LOURDES PLANNING Finalize Survey and Mapping Chapter for Padada RIS (Modernization) Feasibility Study March 18, 2024 100 March 18, 2024
 
1499 ESPADERA, MA LOURDES PLANNING Attended Orientation and Workshop on Survey and mapping preparatory to Detailed Engineering March 22, 2024 100 March 22, 2024
 
1509 MARTURILLAS, JOHN LLOYD PLANNING Attend Orientation and Workshop on Survey and Mapping Preparatory to Detailed Engineering. March 19-22, 2024 March 22, 2024 100 March 22, 2024 Completed
 
1510 MARTURILLAS, JOHN LLOYD PLANNING Create a Monument Description Sheet of Pagan SRIP new controls established "encoding of Description, elevation, coordinates (grid and geographic) March 18, 2024 100 March 18, 2024 Completed
 
1511 HERNAN, ALDEN PLANNING Prepare DTR and other attachments, prepare Cogon Bacaca project milestone March 18, 2024 100 March 18, 2024 completed
 
1513 HERNAN, ALDEN PLANNING Drafting of BADOMA CIS- Typical Plans and Cross Sections (sta. 0+000.00-sta. 0+120.00) March 20, 2024 100 March 20, 2024 submitted to Engr. Marlon Vencilao for Checking, Inserted work: prepare DTR of Mr. Bairoy (survey personnel) and other attachments
 
1515 HERNAN, ALDEN PLANNING Work-Out Modernization as per C.O comments March 22, 2024 85 March 22, 2024 Inserted Work: Drafting of Badoma CIS as per checked by Engr. M. Vencilao, Replying queries of modernization preparers regarding modernization
 
1521 CUICO, JHO-ANN A. PLANNING Prepare and finalize the Padada RIS modernization as per comment of Central Office and Update Layouts as per New boundary Generated (Chapter 1) March 22, 2024 100 March 22, 2024 COMPLETED: Prepare and finalize the Padada RIS modernization as per comment of Central Office and Update Layouts as per New boundary Generated (Chapter 1) Additional Accomplishments: Prepared Layout Map for POW, PCR, TURN, Received, Record, Reprodu
 
1522 CAYABYAB, REY JIM PLANNING Prepare detailed cost estimate on Drainage Canal and Drainage Canal Structures under Civil Works I - System Improvement of Padada RIS Modernization FSR March 22, 2024 100 March 22, 2024
 
1523 INTO, LEE WARREN PLANNING Assist Rey Jim Cayabyab in producing 2 copies of FY 2025 Annual Investment Program March 22, 2024 100 March 22, 2024 Completed.
 
1525 INTO, LEE WARREN PLANNING Oriented OJT personnel re: Preparation of PERT-CPM March 22, 2024 100 March 22, 2024 Completed.
 
1531 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Lacson CIS March 25, 2024 100 March 25, 2024 Printed and provided 5 copies to programmer.
 
1557 CAYABYAB, REY JIM PLANNING Assist in producing 2 copies of FY 2025 Annual Investment Program March 22, 2024 100 March 22, 2024
 
1643 INTO, LEE WARREN PLANNING Check and finalize PERT CPM for Wangan SIS prepared by OJT personnel March 25, 2024 100 March 25, 2024 Checked and revised few errors. Provided 5 copies to programmer.
 
1648 CAYABYAB, REY JIM PLANNING Attend flag raising ceremony March 25, 2024 100 March 25, 2024
 
1653 INTO, LEE WARREN PLANNING Attend Flag Ceremony March 25, 2024 100 March 25, 2024 Attended on time.
 
1662 INTO, LEE WARREN PLANNING Compiled and finalized Annex B.6 Canal Structures. March 25, 2024 100 March 25, 2024 Completed. Softcopy were saved in Team Collab directory.
 
1663 INTO, LEE WARREN PLANNING Compiled and finalized Annex B.8 Service Roads. March 25, 2024 100 March 25, 2024 Completed. Softcopy were saved in Team Collab directory.
 
1690 INTO, LEE WARREN PLANNING Compiled and finalized Annex B.5 Canal Structures March 27, 2024 100 March 26, 2024 Completed. Softcopy were saved in Team Collab directory.
 
1691 INTO, LEE WARREN PLANNING Worked on few corrections over the submitted Lacson CIS Desilting Design plans March 27, 2024 100 April 4, 2024 Printed and submitted.
 
1692 ENCABO, PRINCESS SHAIRA MAE PLANNING Check DTR and Payrolls for Year 1 & 2 personnel. March 25, 2024 100 March 25, 2024 Completed and submitted payrolls of Year 1 & 2 personnel for Padada RIS.
 
1693 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of IWRMP Progress Report for the Month of March 2024. March 25, 2024 100 March 25, 2024 Completed and forwarded soft copy for RIO Personnel.
 
1694 ENCABO, PRINCESS SHAIRA MAE PLANNING Tabulate, summarize and discuss the soil quality test result as compared to BSWM Standards. March 26, 2024 100 March 26, 2024 Completed and uploaded in the Team Collab folder for compilation.
 
1695 ENCABO, PRINCESS SHAIRA MAE PLANNING Conduct coordination meetings with Year 1 & 2 farmer-beneficiaries for their plantation status and other issues and concerns relevant to the implementation. March 26, 2024 100 March 26, 2024 Conducted and coordinated with the Padada RIS personnel.
 
1696 ENCABO, PRINCESS SHAIRA MAE PLANNING Liquidation of cash advance for the recently conducted Semestral Monitoring and Assessment. March 27, 2024 100 March 27, 2024 Prepared pertinent documents for the cash liquidation of the recently conducted Semestral Monitoring and Assessment.
 
1697 MARTURILLAS, JOHN LLOYD PLANNING Plotted 11 lots of land applications March 25, 2024 100 March 25, 2024 *Prepare travel documents for surveying activities.
 
1698 MARTURILLAS, JOHN LLOYD PLANNING Attach geotag pictures of controls for monument description sheet of Pagan SRIP new controls. March 25, 2024 100 March 25, 2024
 
1700 MARTURILLAS, JOHN LLOYD PLANNING Prepare liquidation report for Surveying and Mapping seminar at Davao De Oro IMO. March 26, 2024 80 March 26, 2024 *For signatures
 
1701 MARTURILLAS, JOHN LLOYD PLANNING Create sketch map of controls for monument description sheet of Pagan SRIP (Primary Controls) March 26, 2024 100 March 26, 2024 *Prepare travel documents for surveying activities
 
1702 MARTURILLAS, JOHN LLOYD PLANNING Create sketch map of controls for monument description sheet of Pagan SRIP (Secondary Controls) March 27, 2024 20 March 27, 2024 *Prepare travel documents for surveying activities *Plotting of New Silay SIP Intake of Pump and River
 
1706 SASUMAN, MARY LOUISE J. PLANNING Prepare Land Acquisition and Resettlement Framework (LARF) for Padada RIS Modernization FSR March 27, 2024 40 March 27, 2024 Completed Chapters 1, 2, and 4 for LARF Formulation. Other Accomplishment: Research on the process of LARF Formulation
 
1707 SASUMAN, MARY LOUISE J. PLANNING Consolidate the initial accomplished write-ups for Padada RIS Modernization FSR March 27, 2024 90 March 26, 2024 March 25-26, 2024: Initially consolidated the accomplished write-ups for Padada RIS Modernization FSR. Other accomplishment: Attended flag raising ceremony. Entertained client for application of NIA CSAG Certificate. Posted NWRB Notice of Hearing.
 
1725 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony March 25, 2024 100 March 25, 2024
 
1727 LUARDO, GLENN D. PLANNING Prepare List of Project Affected Person/Family (PAP/PAF) at Main & Lateral Canals of the existing system in line with the Land Acquisition and Resettlement Formulation (FARF) for the Padada RIS FS Modernization. March 26, 2024 100 March 26, 2024 On Mar. 25, 2024; Partial list of PAP/PAF was generated and plotted located @ Main & Lateral canal of the existing system (Padada RIS) (60%). On Mar. 26, 2024; Completed listing and plotting of PAP/PAF (100%).
 
1728 LUARDO, GLENN D. PLANNING Prepare List of Project Affected Person/Family (PAP/PAF) at Service road & Drainage canal of the existing system in line with the Land Acquisition and Resettlement Formulation (FARF) for the Padada RIS FS Modernization. April 5, 2024 20 March 27, 2024 Actual Accomp.; Completed list of PAP/PAF located @ Service road of the existing system (100%). Other accomp.; Prepare PDD form for the Proposed Kisulan SPIP project (100%).
 
1729 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony March 25, 2024 100 March 25, 2024 Completed
 
1730 CUICO, JHO-ANN A. PLANNING Comply comments from Central Office for PRIS Modernization FSR (Chapter 2 Layout Maps) March 25, 2024 100 March 25, 2024 COMPLETED: Actual Accomplishments: Prepared Layout Maps for the ff. Figure 2.1. 7, Figure 2.2. 1., Figure 2.2. 2., Figure 2.2. 3., Figure 2.3. 1., Prepared Layout Maps for POW, PCR, Turn Over Attachments, Received, Record, Reproduced Engineering Docume
 
1731 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for BAGUMBAYAN PIP FSR March 29, 2024 45 March 30, 2024 Due to Lacking Data
 
1732 ESPADERA, MA LOURDES PLANNING Prepare Payroll for JO personnel and checking/conforming of survey team personnel DTR March 25, 2024 100 March 25, 2024
 
1735 CUICO, JHO-ANN A. PLANNING Revised/Created new layout Template as per MC-2016-036 based on comment from Central Office (Revised CHAPTER 2 Layout maps base on MC-2016-036) March 26, 2024 100 March 26, 2024 COMPLETED Prepared Layout Maps for the ff. Figure 2.1. 7, Figure 2.2. 1., Figure 2.2. 2., Figure 2.2. 3., Figure 2.3. 1 (As per MC-2016-036 Template), Input data to LUC Logbook for O&M Tracker, Revised FY 2025 Program Layout Maps (45%)
 
1739 CUICO, JHO-ANN A. PLANNING Revise FY 2025 Program Layout Maps (45%) as of 03-26-2024, Printing, binding of FY 2025 Program Budgetary Book, Received, record, Reproduced Engineering Documents March 27, 2024 100 March 27, 2024 COMPLETED Additional Accomplishments: Prepared Layout Maps for POW,PCR,Turnover Attachments, Organized RESOLUTIONS and BACK TO OFFICE filer for file reference
 
1741 CAYABYAB, REY JIM PLANNING Prepare draft response letter to Bangkal Barangay Irrigation Development Association Inc. regarding their request on provision of IA bldg. March 25, 2024 100 March 25, 2024
 
1743 CAYABYAB, REY JIM PLANNING Prepare detailed cost estimate on Diversion Works under Civil Works II - System Expansion of Padada RIS Modernization FSR March 25, 2024 100 March 25, 2024
 
1749 ENCABO, PRINCESS SHAIRA MAE PLANNING To facilitate DTR and process payrolls of site personnel for Padada and Mal RIS. April 1, 2024 100 April 1, 2024 Checked, processed, and submitted payrolls of PRIS and MRIS personnel.
 
1751 ENCABO, PRINCESS SHAIRA MAE PLANNING To disseminate target deliverables for the existing field personnel under the RPWRSIS program. April 1, 2024 100 April 1, 2024 Coordinated with the existing field personnel as per their assigned target deliverables.
 
1752 ENCABO, PRINCESS SHAIRA MAE PLANNING Coordination meeting with the Mal RIS personnel as per the CO findings in the recently conducted assessment. April 1, 2024 100 April 1, 2024 Coordinated with Mal RIS personnel the CO findings and recommendations.
 
1753 ENCABO, PRINCESS SHAIRA MAE PLANNING Nursery and site visitation for the established plantations. April 2, 2024 100 April 2, 2024 Site visited the nursery and plantation sites; Sort seedlings and instructed landowners on the alternative measures for drip irrigation to address El Niño.
 
1755 ENCABO, PRINCESS SHAIRA MAE PLANNING Coordination meeting with the Mal RIS farmer-beneficiaries of IWRMP to discuss the project status. April 3, 2024 100 April 3, 2024 Conducted meeting with the Mal RIS farmer-beneficiaries and discussed the issues and concerns encountered in their areas.
 
1756 ENCABO, PRINCESS SHAIRA MAE PLANNING Nursery and Site visitation of the plantation sites in Mal RIS IWRMP under Year 1 & 2. April 3, 2024 100 April 3, 2024 Site visited nursery and plantation sites in Mal; Instructed personnel in the nursery to sort the seedlings and arrange them in an orderly manner. Additional Accomplishment: - Facilitate water delivery and tree guards on plantation sites in Padada RIS
 
1765 CAYABYAB, REY JIM PLANNING Assist in producing 2 copies of FY 2025 Annual Investment Program based on corrections March 27, 2024 100 March 27, 2024
 
1787 CAYABYAB, REY JIM PLANNING Revise Plotting and Alignment of Padada RIS Drainage - DRA, DRB, DRB-1, and DRC for Inventory March 26, 2024 100 March 26, 2024
 
1788 CAYABYAB, REY JIM PLANNING Revise Plotting and Alignment of Padada RIS Drainage - DRD, DRD-1, DRK, DRI, and DRI-1 for Inventory March 27, 2024 100 March 27, 2024
 
1794 ESPADERA, MA LOURDES PLANNING Update Accomplishment and Schedule of Surveying Activities at Suawan SRIP March 25, 2024 100 March 25, 2024 Coordinate with various personnel regarding the Miral SRIS FY 2025 Data
 
1795 ESPADERA, MA LOURDES PLANNING Prepare Request Slip for RTK Charging Pins March 25, 2024 100 March 25, 2024
 
1796 ESPADERA, MA LOURDES PLANNING Finalize plotting of Padada RIS Modernization (DE)- LATERAL B3 (0+000 - 7+493.27) March 26, 2024 100 May 3, 2024
 
1797 ESPADERA, MA LOURDES PLANNING Finalize plotting of Padada RIS Modernization (DE)- LATERAL B3 (0+000 - 7+493.27) March 27, 2024 75 March 27, 2024
 
1798 ESPADERA, MA LOURDES PLANNING Drafted request letter for the extension of surveying activities at Suawan SRIP March 27, 2024 100 March 27, 2024
 
1800 ESPADERA, MA LOURDES PLANNING Verify area location applied for LUC if within or not within NIA Existing Irrigation System (11 Titles) March 27, 2024 100 March 27, 2024
 
1808 INTO, LEE WARREN PLANNING Crafting draft Canal Lining Detailed design of Padada RIS Lateral B for Annex B.6 of Padada RIS Modernization. April 5, 2024 100 April 5, 2024 Completed
 
1809 INTO, LEE WARREN PLANNING Crafting draft Canal Lining Detailed design of Padada RIS Sacub Main Canal for Annex B.6 of Padada RIS Modernization April 5, 2024 100 April 4, 2024 Completed
 
1810 INTO, LEE WARREN PLANNING Crafting draft Canal Lining Detailed design of Padada RIS Lateral B4 for Annex B.6 of Padada RIS Modernization April 5, 2024 100 April 4, 2024 Completed.
 
1811 INTO, LEE WARREN PLANNING Crafting draft Canal Lining Detailed design of Padada RIS Parat RMC for Annex B.6 of Padada RIS Modernization April 5, 2024 100 April 4, 2024 Completed.
 
1812 INTO, LEE WARREN PLANNING Prepare PERT CPM for BADOMA CIS April 5, 2024 100 April 2, 2024 -Assisted by OJT in performing forward and backward activity pass. -Completed
 
1813 LUARDO, GLENN D. PLANNING Prepare BTOR for the conducted site inspection on the existing systems and proposed for expansion @ Brgy. Saloy, Calinan District, Davao City, for the conducted Agro-Socio Economic survey on the proposed Bagumbayan PIP located @ Brgy. Bagumbayan, Kiblawan April 1, 2024 100 April 1, 2024
 
1818 HERNAN, ALDEN PLANNING Work-out Modernization: Chapter 9: Tabulation of of modernization component and write-ups of salient features for existing structures as per C.O comments March 25, 2024 100 March 26, 2024 completed
 
1819 HERNAN, ALDEN PLANNING Drafting of Padada RIS: Tagging of plan and profile of Lateral B3 March 27, 2024 100 March 27, 2024 Inserted Work: prepare transmittal and printing of plans of BADAGOY CIS for submission to R.O
 
1820 EUGENIO, VENANN PLANNING (Carry Over; Target Date moved to April 12, 2024) Update hydrological aspect of Padada RIS Modernization as per CO comments March 29, 2024 100 N/A Deadline moved to April 12, 2025; Mar 25 - 80% Prepared IWR computation of Ampalaya for Dam 1; 100% Edit formula of chapter 2.4 of Padada RIS Modernization
 
1822 EUGENIO, VENANN PLANNING (Carry Over; Target Date moved to April 12, 2024) Update hydrological aspect of Padada RIS Modernization as per CO comments March 29, 2024 100 N/A Mar 26 - 100% Prepared IWR computation of Ampalaya, Cucumber, and Aggplent for Dam 1; 100% Recalculate ETIA of Davao Occidental
 
1823 EUGENIO, VENANN PLANNING (Carry Over; Target Date moved to April 12, 2024) Update hydrological aspect of Padada RIS Modernization as per CO comments March 29, 2024 100 N/A Mar 27 - 50% Prepared IWR computation of Ampalaya for Dam 2; 100% - Check layout maps for FY 2025 attachment; 50% - Prepare draft of communication letter.
 
1826 CAYABYAB, REY JIM PLANNING Prepare letter to Provincial Agricultural Office of Malita Davao Occidental re request of transfer of location from Sitio Kisoy to Sitio Bolobolo April 3, 2024 100 April 3, 2024
 
1827 CAYABYAB, REY JIM PLANNING Prepare the matrix in tabular form: NEP FY 2024 as of July 2023 vs FY 2024 GAA (as per approved) April 3, 2024 100 April 3, 2024
 
1829 EUGENIO, VENANN PLANNING Prepare DPCR for Planning and Design Unit for 1se semester January to June 2024 April 3, 2024 100 April 3, 2024 Completed
 
1841 INTO, LEE WARREN PLANNING Costing of FSDE Funds for April 1 - 5, 2024 April 5, 2024 100 April 5, 2024 Reconciled CCAW Funds with RAOCO as of March 15, 2024.
 
1842 INTO, LEE WARREN PLANNING Crafting draft Canal Lining Detailed design of Padada RIS Sacub Lateral A for Annex B.6 of Padada RIS Modernization April 4, 2024 100 April 5, 2024 Assisted by Jho-Ann in drafting of plan and profile.
 
1847 ENCABO, PRINCESS SHAIRA MAE PLANNING Checking of DTRs and Preparation of Payrolls of Mal RIS Year 1 & 2 personnel. April 4, 2024 100 April 4, 2024 Checked and submitted DTRs and payrolls of Mal RIS Year 1 & 2 personnel.
 
1848 ENCABO, PRINCESS SHAIRA MAE PLANNING Revised Year 3 Program of Works (POW) for IWRMP. April 4, 2024 100 April 11, 2024 On-going revision of POW for Year 3 Implementation since the CO had additional comments as to the content of the POW. Other accomplishment: - Compilation of lacking attachments for liquidation of the recently conducted activity.
 
1850 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony April 1, 2024 100 April 1, 2024 COMPLETED
 
1851 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for PRIS for GEORESISTIVITY Survey purposes April 1, 2024 100 April 1, 2024 COMPLETED
 
1852 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduced Engineering Documents April 1, 2024 100 April 1, 2024 COMPLETED
 
1853 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW, PCR, Turnover Attachments April 1, 2024 100 April 1, 2024 COMPLETED
 
1854 CUICO, JHO-ANN A. PLANNING Input data to LUC Logbook for O&M Tracker April 1, 2024 100 April 1, 2024 COMPLETED
 
1855 CUICO, JHO-ANN A. PLANNING Crafting draft Canal Lining Detailed design of PRIS SKLA for Annex B.6 of PADADA RIS Modernization April 2, 2024 100 April 2, 2024 COMPLETED
 
1856 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduced Engineering Documents April 2, 2024 100 April 2, 2024 COMPLETED
 
1857 CUICO, JHO-ANN A. PLANNING Input Data to LUC Logbook Tracker for O&M Tracker April 2, 2024 100 April 2, 2024 COMPLETED
 
1858 CUICO, JHO-ANN A. PLANNING Scanned, Upload Resolution and Back-to-office Report to Planning GDRIVE, Inputed to Monitoring Google Sheet og Resolution and BOTR Tracker April 2, 2024 100 April 2, 2024 COMPLETED
 
1859 CUICO, JHO-ANN A. PLANNING Scanned, Upload Resolution and Back-to-office Report to Planning GDRIVE, Inputed to Monitoring Google Sheet og Resolution and BOTR Tracker (2024) April 3, 2024 100 April 3, 2024 COMPLETED
 
1860 CUICO, JHO-ANN A. PLANNING Prepared Itinerary for Planning and Design assessment activities on April 18-20, 2024 April 3, 2024 100 April 3, 2024 COMPLETED
 
1861 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for WANGAN SIS for POW attachments (REPAIR OF DIVERSION DAM and CANAL STRUCTURES Thresher Rd. X-ing @ sta: 0+400.00) April 3, 2024 100 April 3, 2024 COMPLETED
 
1872 MARTURILLAS, JOHN LLOYD PLANNING Plotting of MAL RIS LATERAL E STA 2+480.85 - 4+478.44 *Polishing of survey data *Plotting of Profile and Cross-section April 4, 2024 100 April 4, 2024 Completed
 
1883 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Unifarm CIS (46M) April 5, 2024 100 April 5, 2024 Assisted by OJT in crafting diagram. Checked, finalized and provided 5 copies to programmer.
 
1885 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities April 5, 2024 100 April 5, 2024 Completed
 
1886 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 2 land use applications April 3, 2024 100 April 3, 2024 Completed
 
1887 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities April 3, 2024 100 April 3, 2024 Completed
 
1893 EUGENIO, VENANN PLANNING (Carry Over; Target Date moved to April 12, 2024) Update hydrological aspect of Padada RIS Modernization as per CO comments April 1, 2024 100 April 1, 2024 Prepared IWR computation of Ampalaya, Cucumber and Eggplant for Dam 2; Prepare communication letter; Edit Existing IWR of Rice for Padada River as per Approved Cropping Calendar
 
1894 EUGENIO, VENANN PLANNING (Carry Over; Target Date moved to April 12, 2024) Update hydrological aspect of Padada RIS Modernization as per CO comments April 2, 2024 100 April 2, 2024 Prepare updated PIMP layout map of Davao del Sur; Prepared IWR computation of Ampalaya, Cucumber and Eggplant for Dam 3
 
1895 EUGENIO, VENANN PLANNING (Carry Over; Target Date moved to April 12, 2024) Update hydrological aspect of Padada RIS Modernization as per CO comments April 3, 2024 100 April 3, 2024 Prepared IWR computation of Ampalaya, Cucumber and Eggplent for Dam 4; Edit Existing IWR of Rice for Padada River as per Approved Cropping Calendar; Prepare photos of Bolo-bolo SIP for CNC Application attachment
 
1896 EUGENIO, VENANN PLANNING (Carry Over; Target Date moved to April 12, 2024) Update hydrological aspect of Padada RIS Modernization as per CO comments April 4, 2024 100 April 4, 2024 Prepare photodocumentation Basiwan PIP for CNC Application attachment; Edit Existing IWR of Rice for Padada & Sacub River as per Approved Cropping Calendar of O&M; Edit DPCR targets of PDU as per RIO targets
 
1897 EUGENIO, VENANN PLANNING (Carry Over; Target Date moved to April 12, 2024) Update hydrological aspect of Padada RIS Modernization as per CO comments April 5, 2024 100 April 5, 2024 Edit Existing IWR of Rice for Odaka Creek as per Approved Cropping Calendar of O&M; Prepared layout map of Culaman SIP for POW attachment; Prepare proposed IWR of Rice, Mungbean & Water for Padada & Sacub River Intake
 
1898 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW attachment of BALA-KANAPULO CIS (Lateral A Station: 2+082.93 - 2+100.43 - 17.50 Meters) April 4, 2024 100 April 4, 2024 COMPLETED
 
1900 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW attachment of BADOMA CIS (Installation of Steel Sheet Piles (9 Meters) April 4, 2024 100 April 4, 2024 COMPLETED
 
1902 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachment of WANGAN SIS (Diversion works and Canal Structure: Repair of Diversion Dam and Canal Structure (Thresher-Xing) at Station 0+340.00 in Main Canal) April 4, 2024 100 April 4, 2024 COMPLETED
 
1903 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduced Engineering Documents April 4, 2024 100 April 4, 2024 COMPLETED
 
1904 CUICO, JHO-ANN A. PLANNING Input Data to LUC logbook for O&M Datasheet/Tracker April 4, 2024 100 April 4, 2024 COMPLETED
 
1905 CUICO, JHO-ANN A. PLANNING Drafting Padada RIS Lat. A. CY 2024 April 5, 2024 100 April 5, 2024 COMPLETED
 
1907 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachment of UNIFARM CIS (Diversion Works: Modification of Main Dam) (Protection Works: Main Dam (Upstream 0+000.00 - 0+320.00) Downstream: 0+010.00 - 0+037.00 April 5, 2024 100 April 5, 2024 COMPLETED
 
1908 MARTURILLAS, JOHN LLOYD PLANNING Create sketch map of controls for monument description sheet of Pagan SRIP Attachment of sketch map for Monument Description Sheet April 1, 2024 100 April 1, 2024 Completed
 
1910 MARTURILLAS, JOHN LLOYD PLANNING Checking and Polishing of survey data of Padada Drainage April 2, 2024 100 April 2, 2024 Completed
 
1915 MARTURILLAS, JOHN LLOYD PLANNING Plotting and Generating of Profile and Cross-section of Padada Drainage DRB 2+565.77 Plotting and Generating of Profile and Cross-section of Padada Drainage DRQ 1+727.89 April 3, 2024 100 April 3, 2024 Completed
 
1916 MARTURILLAS, JOHN LLOYD PLANNING Plotting and Generating of Profile and Cross-section of Padada Drainage DRI 3+348.89 Plotting and Generating of Profile and Cross-section of Padada Drainage DRI-1 1+718.88 April 4, 2024 100 April 4, 2024 Completed
 
1917 MARTURILLAS, JOHN LLOYD PLANNING Plotting and Generating of Profile and Cross-section of Padada Drainage DRH 1+884.36 Plotting and Generating of Profile and Cross-section of Padada Drainage DRM-3 557.71 April 5, 2024 100 April 5, 2024 Completed
 
1918 ENCABO, PRINCESS SHAIRA MAE PLANNING Update Timeline of Activities for Year 1-2 IWRMP Activities of Padada and Mal RIS. April 5, 2024 100 April 5, 2024 On-going update of timeline of activities for Year 1-2 IWRMP activities of Padada and Mal RIS.
 
1921 CAYABYAB, REY JIM PLANNING Prepared final reponse letter for Kabula IA re: Request for a Solar Water Pump for Buri area April 1, 2024 100 April 1, 2024
 
1923 CAYABYAB, REY JIM PLANNING Prepared draft letter template for Project Identification April 2, 2024 100 April 2, 2024
 
1925 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRB Sta. 0+000.00 - Sta. 2+565.77 on PRIS Drainage System for Modernization April 4, 2024 100 April 4, 2024
 
1926 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRQ Sta. 0+000.00 - Sta. 1+727.89 on PRIS Drainage System for Modernization April 4, 2024 100 April 4, 2024
 
1927 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRI Sta. 0+000.00 - Sta. 3+348.89 on PRIS Drainage System for Modernization April 4, 2024 100 April 4, 2024
 
1928 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRI-1 Sta. 0+000.00 - Sta. 1+718.88 on PRIS Drainage System for Modernization April 4, 2024 100 April 4, 2024
 
1929 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRH Sta. 0+000.00 - Sta. 1+884.36 on PRIS Drainage System for Modernization April 5, 2024 100 April 5, 2024
 
1930 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRM-3 Sta. 0+000.00 - Sta. 0+557.61 on PRIS Drainage System for Modernization April 5, 2024 100 April 5, 2024
 
1931 CAYABYAB, REY JIM PLANNING Update Canal Length and Structures Inventory (DRB, DRH, DRI, and DRI-1) of PRIS Drainage for Modernization April 5, 2024 100 April 5, 2024
 
1932 ENCABO, PRINCESS SHAIRA MAE PLANNING Updated parcellary maps per landowner of Padada and Mal RIS (Years 1 & 2). April 5, 2024 90 April 12, 2024 On-going update on the attributes for the parcellary maps of landowners (Padada and Mal RIS).
 
1934 HERNAN, ALDEN PLANNING Drafting of Sampaguita CIS Diversion Works Plan and Section April 4, 2024 100 April 4, 2024 submitted to Engr. Eugenio Dela Cruz for checking
 
1935 HERNAN, ALDEN PLANNING Update Cogon Bacaca SRIP Project Milestone and Project Progress Report Summary April 5, 2024 100 April 5, 2024 completed and submitted
 
1936 HERNAN, ALDEN PLANNING prepare Dtr and other attachment, Drafting: polishing pf Padada RIS Lateral B3-A plan and profile April 1, 2024 100 April 1, 2024 completed
 
1937 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony April 1, 2024 100 April 1, 2024
 
1939 LUARDO, GLENN D. PLANNING Prepare BTOR for the attended Public Consultation @ Tamugan Brgy. Hall regarding the Feasibility Study Report of the proposed Pagan SRIP. April 2, 2024 100 April 2, 2024 Other accomp.; Prepare 1 Purchase request for used in the Engineering & Operation personnel (100%), Prepare letter request for Davao del Sur Provincial Capitol regarding the Tax Map & Demographic data (100%).
 
1940 LUARDO, GLENN D. PLANNING Attend consultation meeting at NCIP Provincial Office of Davao Occidental regarding proposed Bolobolo & Sitio Lenna SIP Projects. April 3, 2024 100 April 3, 2024 Other accomp.; Prepare letter request for NCIP Provincial Office regarding the Pre-Con for the proposed Basiawan PIP Project located @ Barangay Basiawan, Sta. Maria, Davao Occidental (100%).
 
1941 LUARDO, GLENN D. PLANNING Attend Pre-Con meeting with NCIP Provincial Personnel @ the NCIP Office of Sta. Maria, Davao Occidental regarding the proposed Basiawan PIP project. April 4, 2024 100 April 4, 2024 Other Accomp.; Conduct geotagging @ the proposed Pumpsite of the proposed Basiawan PIP project (100%), Deliver letter request to Davao del Sur Provincial Capitol regarding the Tax Map of Davao del Sur (100%).
 
1942 LUARDO, GLENN D. PLANNING Prepare Proposals for the conduct of FPIC of the proposed projects Bolobolo SIP, Sitio Lenna SIP, and Basiawan SPIP located @ Davao Occidental. April 5, 2024 100 April 5, 2024 Other accomp.; Prepare 4 Purchase request for used in Planning & Design personnel (100%), Prepare DTR for the month of March 16-31, 2024 (100%), and Prepare TEV for the month of Jan. to Mar. (100%).
 
1943 ESPADERA, MA LOURDES PLANNING Finalize Request for Extension of Surveying Activities at Suawan SRIP April 1, 2024 100 April 1, 2024
 
1944 ESPADERA, MA LOURDES PLANNING Checking/Conforming of Original DTR of Local Survey Personnel April 1, 2024 100 April 1, 2024 Scanned Copy was submitted via messenger for early preparation/submission of Payroll
 
1945 SASUMAN, MARY LOUISE J. PLANNING Prepared letter to PMRB for GSUP application April 1, 2024 100 April 1, 2024 Completed. Prepared draft communication letter for checking.
 
1946 SASUMAN, MARY LOUISE J. PLANNING Prepare proposed georesistivity lines for the conduct of georesistivity survey in Padada RIS April 1, 2024 100 April 1, 2024 Completed. Prepared proposed geores lines and submitted to RO the advance copy.
 
1947 SASUMAN, MARY LOUISE J. PLANNING Posted NWRB Notice of Hearing April 1, 2024 100 April 1, 2024 Completed.
 
1948 SASUMAN, MARY LOUISE J. PLANNING Coordinate with RO geologist for the status on the exploration of borrow area in Cogon Bacaca SRIP April 3, 2024 100 April 3, 2024 Completed. RO Geologist coordinated with CO personnel relative to this matter.
 
1949 SASUMAN, MARY LOUISE J. PLANNING Prepared needed documents for the online CNC application of Bolo-bolo SIP and Basiawan PIP to DENR-EMB RXI. April 3, 2024 100 April 3, 2024 Completed.
 
1950 SASUMAN, MARY LOUISE J. PLANNING Apply online CNC application of Bolo-bolo SIP and Basiawan PIP to DENR-EMB RXI. April 3, 2024 100 April 3, 2024 Already applied CNC. Application is for screening by DENR-EMB RXI.
 
1951 SASUMAN, MARY LOUISE J. PLANNING Prepare TEV for the consultation workshop on the NIA SES and ROW Manual April 3, 2024 100 April 3, 2024 Completed.
 
1952 SASUMAN, MARY LOUISE J. PLANNING Prepare Chapters 5, 6,7,8 and 10 for LARF Formulation of Padada RIS Modernization FSR. April 5, 2024 100 April 5, 2024 Completed.
 
1953 SASUMAN, MARY LOUISE J. PLANNING Prepare and consolidate the progress report of Padada RIS Modernization FSR. April 5, 2024 100 April 5, 2024 Completed and submitted.
 
1979 ESPADERA, MA LOURDES PLANNING Verify area location applied for TOT if within or not within NIA Existing Irrigation System (2 Titles) April 1, 2024 100 April 1, 2024
 
1980 ESPADERA, MA LOURDES PLANNING Draft BTOR on the attended Orientation and Workshop on Survey and Mapping Preparatory to Detailed Engineering April 1, 2024 100 April 1, 2024
 
1981 ESPADERA, MA LOURDES PLANNING Update FY 2025 Survey Activity Accomplishment April 1, 2024 100 April 1, 2024
 
1982 ESPADERA, MA LOURDES PLANNING Submit DTR and WAR April 1, 2024 100 April 2, 2024
 
1985 ESPADERA, MA LOURDES PLANNING Prepare Revised Pagan SRIP Survey and Mapping Report April 2, 2024 100 April 2, 2024 Other Miscellaneous Works: Prepare Memorandum for Suawan SRIP Survey Activities
 
1986 ESPADERA, MA LOURDES PLANNING Prepare Revised Pagan SRIP Survey and Mapping Report April 3, 2024 100 April 5, 2024 Other Miscellaneous Works: Finalize BTOR on Survey Training; Finalize Response Letter to Altrade; Follow up call to Dano (Survey Personnel Applicant); Discussion over Mal RIS LAT E FY 2024
 
1987 ESPADERA, MA LOURDES PLANNING Prepare Revised Pagan SRIP Survey and Mapping Report April 4, 2024 100 April 4, 2024
 
1988 ESPADERA, MA LOURDES PLANNING Prepare Revised Pagan SRIP Survey and Mapping Report April 5, 2024 100 April 5, 2024 Other Works: Discussion with O&M, Planning and Design Focals with regards to clarification on Proposed Concreting of Canal at New Cabasagan CIS and Unifarm CIS for FY 2025
 
1989 CUICO, JHO-ANN A. PLANNING Prepared Layout map of Bala Kanapulo CIS for POW Attacments (Canalization LATERAL A Sta. 2+082.93 - 2+100.43) April 5, 2024 100 April 5, 2024 COMPLETED
 
1990 CUICO, JHO-ANN A. PLANNING Comply PRIS Modernization Comments as per CO April 5, 2024 100 April 5, 2024 Prepared layout maps of Figure 2.3.2., Figure 2.3.3., Figure 1.4.2., Figure 1.6.1. as per MC 036 S. 2016 Template
 
1991 CAYABYAB, REY JIM PLANNING Prepared final reponse letter for Bangkal Barangay Irrigation Development Association Inc. re: Request for provision of an IA building April 2, 2024 100 April 2, 2024
 
1992 CAYABYAB, REY JIM PLANNING Prepared final reponse letter for Barangay Bantol, Marilog District, Davao City re: Requesting assistance for the water service pipes for irrigation system April 2, 2024 100 April 2, 2024
 
1993 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Survey Sheets taken for PRIS Drainage Lining and Operation of Initial Profile for simultaneous dissemination of profile labelling to draftsman April 15, 2024 81 April 12, 2024 *Remaining drainages are subject for resurvey
 
2006 LUARDO, GLENN D. PLANNING Prepare Proposals for the conduct of FPIC of the proposed projects Bolobolo SIP, Sitio Lenna SIP, and Basiawan SPIP located @ Davao Occidental. April 8, 2024 100 April 8, 2024 Other accomp: Prepared 4 PR for use in various Planning and Design Unit Activity,
 
2031 INTO, LEE WARREN PLANNING Prepare PERT CPM for BOLO BOLO SIP (9.35M) April 12, 2024 100 April 12, 2024 Completed.
 
2032 INTO, LEE WARREN PLANNING Prepared Plan and Profile for Padada RIS Drainage B. April 12, 2024 100 April 8, 2024 Completed
 
2034 INTO, LEE WARREN PLANNING Prepared Plan and Profile for Padada RIS Drainage Q. April 12, 2024 100 April 12, 2024 Completed.
 
2035 INTO, LEE WARREN PLANNING Prepared Plan and Profile for Padada RIS Drainage I-1. April 12, 2024 100 April 12, 2024 Completed
 
2036 INTO, LEE WARREN PLANNING Prepared Detailed Engineering Design Plans of Kitaha Creek Digos SIP (PRIS Modernization Expansion) April 12, 2024 90 April 12, 2024 Completed DED plans for proposed check structures. On-going crafting of Plan and Profiles of the corresponding canals.
 
2037 INTO, LEE WARREN PLANNING Prepared Detailed Engineering Design plans of Sinaragan Creek Dam (PRIS Modernization expansion) April 12, 2024 90 April 12, 2024 Completed DED plans for proposed check structures. On-going crafting of Plan and Profiles of the corresponding canals.
 
2038 INTO, LEE WARREN PLANNING Prepare FSDE Fund Physical and Financial Status for Semestral Assessment Presentation April 12, 2024 100 April 16, 2024 Completed updating physical and financial completion status per FSDE Fund. Delayed FSDE Catch-up plan to follow.
 
2039 INTO, LEE WARREN PLANNING Re-submitting revised Back-to-Office Report of Unifarm CIS February 22, 2024 Site Inspection April 11, 2024 100 April 12, 2024 Completed
 
2043 ENCABO, PRINCESS SHAIRA MAE PLANNING Process liquidation for the recently conducted activity. April 8, 2024 100 April 8, 2024 Completed and submitted Liquidation of Cash Advance to Finance Unit.
 
2044 ENCABO, PRINCESS SHAIRA MAE PLANNING Designate tasks for tree guard and nursery personnel of Padada RIS April 8, 2024 100 April 8, 2024
 
2045 ENCABO, PRINCESS SHAIRA MAE PLANNING Coordination meeting with Mal RIS personnel to provide timeline of activities simultaneous with Padada RIS. April 8, 2024 100 April 8, 2024 Discussed and forwarded the template for Carlos Cardines reference on creating timeline for Mal RIS activities.
 
2046 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare the status of Rehabilitation and Protection of Water Resources Supporting Irrigation Systems for the presentation in the 1st Regionwide Assessment of Planning and Design Section. April 11, 2024 100 April 11, 2024
 
2047 ENCABO, PRINCESS SHAIRA MAE PLANNING Designate field personnel and ask for updates on their target deliverables. April 11, 2024 100 April 11, 2024
 
2048 ENCABO, PRINCESS SHAIRA MAE PLANNING Cope up with CO comments as for the Padada Modernization April 12, 2024 100 April 12, 2024 Discussed the minor comments of C.O in: Page 120. CADT/CADC/IP/ about discussing the level of modernization that will affect IPs as well as to verify if it is within the CADT/CADC boundaries.
 
2049 ENCABO, PRINCESS SHAIRA MAE PLANNING Update Project Progress Report April 12, 2024 100 April 12, 2024 Updated and submitted the Project Progress Report of IWRMP.
 
2055 CUICO, JHO-ANN A. PLANNING Prepared / Process rental fee for van PR and other documents April 8, 2024 100 April 8, 2024 COMPLETED
 
2056 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony April 8, 2024 100 April 8, 2024 COMPLETED
 
2063 EUGENIO, VENANN PLANNING (Carry Over; Target Date moved to April 12, 2024) Update hydrological aspect of Padada RIS Modernization as per CO comments April 8, 2024 100 April 8, 2024 Prepare ALLOWABLE DEPENDABLE WATER SUPPLY FOR PADADA RIS; Prepare Annex A.4-16 of PRIS Modernization; Prepared layout map of Matanao-Balabag SRIP
 
2064 EUGENIO, VENANN PLANNING (Carry Over; Target Date moved to April 12, 2024) Update hydrological aspect of Padada RIS Modernization as per CO comments April 11, 2024 100 April 11, 2024 Prepare Annex A.17-23 of PRIS Modernization; Edit communication to PRIS-ICIFIA for the conduct of georesistivity; Incorporate PDU assessment report to new template; Prepare travel documents for inventory of irrigation facility at Balutakay, Bansalan
 
2065 EUGENIO, VENANN PLANNING Conduct inventory of irrigation facility at Sitio Balutakay, Bansalan April 12, 2024 100 April 12, 2024 Completed.
 
2082 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents April 8, 2024 100 April 8, 2024 COMPLETED
 
2083 CUICO, JHO-ANN A. PLANNING Comply PRIS Modernization Comments as per CO (Updated Layout Maps - Chapter 3) April 8, 2024 100 April 8, 2024 COMPLETED: 100% (Figure 3.1.2, Figure 3.1.3, Figure 3.1.6 ,Figure 3.1.7, Figure 3.1.9) Additional Accomplishment: Layout Maps for POW attachments
 
2084 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents April 11, 2024 100 April 11, 2024 COMPLETED
 
2085 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW, TURNOVER, PCR Attachment April 11, 2024 100 April 11, 2024 COMPLETED: Additional Accomplishments: PRIS Modernization Revised Layouts (Figure 4.1.1.,Figure 5.5.1., Figure 5.5.4.,Figure 5.5.5.,Figure 5.6.16.)
 
2092 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW attachments April 12, 2024 100 April 12, 2024 COMPLETED: UNIFARM CIS (Lateral A2: Sta. 0+344.07 - 0+410.76 = 66.69 Meters), MC Canal Structures: 1+728.00 - Vertical Drop
 
2095 CAYABYAB, REY JIM PLANNING Prepare cost estimate of solar-powered pump irrigation projects on selected areas of Padada RIS for Modernization FSR April 8, 2024 100 April 8, 2024
 
2096 CAYABYAB, REY JIM PLANNING Update Canal Length and Structures Inventory (DRQ, DRM-3) of PRIS Drainage for Modernization FSR April 8, 2024 100 April 8, 2024
 
2097 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRM Sta. 0+000.00 - Sta. 3+578.08 of PRIS Drainage System for Modernization April 11, 2024 100 April 11, 2024
 
2098 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRM-4 Sta. 0+000.00 - Sta. 1+434.38 of PRIS Drainage System for Modernization April 11, 2024 100 April 11, 2024
 
2099 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRM-5 Sta. 0+000.00 - Sta. 3+022.50 of PRIS Drainage System for Modernization April 11, 2024 100 April 11, 2024
 
2100 CAYABYAB, REY JIM PLANNING Consolidate reports of assigned personnel for the powerpoint presentation on the upcoming PDS Regionwide Assessment April 11, 2024 100 April 11, 2024
 
2101 CAYABYAB, REY JIM PLANNING Update Canal Length and Structures Inventory (DRM, DRM-4, & DRM-5) of PRIS Drainage for Modernization FSR April 12, 2024 100 April 12, 2024
 
2102 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRK Sta. 0+000.00 - Sta. 0+474.30 of PRIS Drainage System for Modernization April 12, 2024 100 April 12, 2024
 
2103 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRD-1 Sta. 0+000.00 - Sta. 0+978.41 of PRIS Drainage System for Modernization April 12, 2024 100 April 12, 2024
 
2104 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRD SPECIAL Sta. 0+000.00 - Sta. 2+050.61 of PRIS Drainage System for Modernization April 12, 2024 100 April 12, 2024
 
2105 CAYABYAB, REY JIM PLANNING Prepare and print weekly progress report of PRIS Modernization FSR (April 8-12, 2024) April 12, 2024 100 April 12, 2024
 
2111 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter to IAs and BLGUs for the conduct of georesistivity survey in the expansion area of Padada RIS Modernization. April 8, 2024 100 April 8, 2024 Prepared draft communication letter (for checking).
 
2112 SASUMAN, MARY LOUISE J. PLANNING Prepare the final shapefiles for proposed georesistivity line and send to O&M for coordination. April 8, 2024 100 April 8, 2024 Completed.
 
2113 SASUMAN, MARY LOUISE J. PLANNING Prepare Certificate for Commercial Sand ang Gravel (CSAG). April 8, 2024 100 April 8, 2024 Completed.
 
2114 SASUMAN, MARY LOUISE J. PLANNING Coordinate to procurement relative to the food catering on the conduct of georesistivity survey in Padada RIS. April 8, 2024 100 April 8, 2024 Completed.
 
2115 SASUMAN, MARY LOUISE J. PLANNING Attend consultation workshop of NIA on Social and Environmental Safeguards Manual and Right-of-way Acquisition (ROWA) Manual. April 11, 2024 100 April 11, 2024 Completed.
 
2116 SASUMAN, MARY LOUISE J. PLANNING Attend consultation workshop of NIA on Social and Environmental Safeguards Manual and Right-of-way Acquisition (ROWA) Manual. April 12, 2024 100 April 12, 2024 Completed.
 
2117 ESPADERA, MA LOURDES PLANNING Update Proposed Schedule for weekly Surveying Activities April 8, 2024 100 April 8, 2024
 
2118 ESPADERA, MA LOURDES PLANNING Verify Item Description of Repair CIS FY 2025 Projects as per IA Resolutions submitted April 8, 2024 100 April 8, 2024
 
2119 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Padada Drainages DRM 3578.08m DRM-4 1434.38m DRM-5 3022.50m April 8, 2024 100 April 8, 2024 Generate profile and cross-section of drainages
 
2120 ESPADERA, MA LOURDES PLANNING Prepare pre-survey data to be used as a reference by the survey team (New Cabasagan CIS and Unifarm CIS) April 8, 2024 100 April 8, 2024
 
2121 ESPADERA, MA LOURDES PLANNING Address initial comments by RIO on the submitted Pagan SRIP Surveying and Mapping Report April 8, 2024 100 April 8, 2024
 
2122 ESPADERA, MA LOURDES PLANNING Address initial comments by RIO on the submitted Pagan SRIP Surveying and Mapping Report April 11, 2024 100 April 11, 2024
 
2123 ESPADERA, MA LOURDES PLANNING Update Suawan SRIP Topographic Surveying Weekly Accomplishment April 11, 2024 100 April 11, 2024
 
2124 MARTURILLAS, JOHN LLOYD PLANNING Plotting and Generating of Profile and Cross-section of Padada Drainage DRD-1 978.41m, DRK 474.30m, and DRD SPECIAL 2050.61m April 12, 2024 100 April 12, 2024 Completed
 
2125 ESPADERA, MA LOURDES PLANNING Update FY 2025 Accomplishment for PDU Assessment Powerpoint Presentation April 11, 2024 100 April 11, 2024
 
2126 ESPADERA, MA LOURDES PLANNING Update Milestone of SRIP Projects with regards to Surveying Activities as of April 10, 2024 April 11, 2024 100 April 11, 2024
 
2127 ESPADERA, MA LOURDES PLANNING Prepare pre-survey data to be used as a reference by the survey team (Kilolog CIS and Mabini - Barayong CIS) April 11, 2024 100 April 11, 2024
 
2128 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities April 12, 2024 100 N/A Completed
 
2129 ESPADERA, MA LOURDES PLANNING Arrange/ Facilitate preparation for the Map Testing Activity next week April 12, 2024 100 April 11, 2024 Request for Travel Order for two (2) Survey Teams
 
2130 ESPADERA, MA LOURDES PLANNING Prepare Proposal for Asbang SRIP Map Testing April 12, 2024 100 April 12, 2024
 
2131 ESPADERA, MA LOURDES PLANNING Prepare Template for Survey Validation Form to be signed by IA President during surveying works for Existing System April 12, 2024 100 April 12, 2024
 
2132 ESPADERA, MA LOURDES PLANNING Claim Medical Kit for Survey Team and Follow Up Charging Pin for RTK, Radio and Portable Generator at Procurement Unit April 12, 2024 100 April 12, 2024
 
2133 ESPADERA, MA LOURDES PLANNING Prepare pre-survey data to be used as a reference by the survey team (San Jose SIP and Lower Marber CIS) April 12, 2024 100 April 12, 2024
 
2134 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Padada RIS drainage DRC approximately 3037m April 9, 2024 100 April 9, 2024 Completed
 
2135 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Padada drainages DRD approximately 7860m April 10, 2024 100 April 10, 2024 Completed
 
2136 ESPADERA, MA LOURDES PLANNING Finalize plotting of Padada RIS Modernization (DE)- LATERAL B3 (0+000 - 7+493.27) April 12, 2024 100 May 3, 2024
 
2137 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Padada drainages DRA approximately 7163.725 April 11, 2024 100 April 11, 2024 Completed
 
2138 HERNAN, ALDEN PLANNING Design and drafting of submitted checked plan and section of Sampaguita Diversion dam April 8, 2024 100 April 8, 2024 Completed/ Inserted work: drafting of padada Ris lateral A thresher x-ing
 
2139 HERNAN, ALDEN PLANNING Drafting of Unifarm CIS, plan and sections April 11, 2024 100 April 11, 2024 Inserted work: scan and consolidate documents submitted to NCIP-XI
 
2140 HERNAN, ALDEN PLANNING Drafting of MAL RIS RMC (sta. 2+480.55 to sta. 3+922.50) plan and profile April 12, 2024 45 April 12, 2024 Inserted work:Discussion about drafting of MAL RIS, responding/discussion regarding modernization, updating accomplishments, printing of BOTR
 
2141 LUARDO, GLENN D. PLANNING Prepare request letter to Barangay Little Baguio & Municipality of Sta. Maria for the conduct of FPIC. April 11, 2024 100 April 11, 2024 Other accomp.: Follow-up Cash Advance in preparation for the conduct of FPIC meeting (70%); Prepare 2 PR for the Planning & Design Unit activity (100%).
 
2142 LUARDO, GLENN D. PLANNING Prepare power point presentation for the conduct of FPIC for the proposed Bolobolo and Sitio Lenna SIP projects. April 12, 2024 100 April 12, 2024 Other accomp.; Notarized contract agreement for the Planning & Design Unit upcoming activity (100%); Prepared require documents for CNC application of the proposed Kisulan PIP project (90%).
 
2144 CUICO, JHO-ANN A. PLANNING Prepared Layout map of KAWAYAN SIS for POW attachment April 12, 2024 100 April 12, 2024 COMPLETED: 100% Canalization (MAIN CANAL 2 sta.: 0+182.38 - 0+212.490, 0+215.94 - 206.67 meters) Canala Structures (Sta.: 0+212.21 - Siphonic Drainage Culvert, 0+214 - Vertical Drop
 
2145 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents April 12, 2024 100 April 12, 2024 COMPLETED
 
2146 CUICO, JHO-ANN A. PLANNING Prepared layout map of CARFA SIS for POW attachments April 12, 2024 100 April 12, 2024 COMPLETED: 100% WORK ITEM: Cougan Creek Desilting: sta.: 0+000.00-0+300.00, PROTECTION DIKE: Sluice/ Check Date, Intake Gate, DRAINAGE STRUCTURES: 2 Structures of Box Culvert, RETAINING WALL UPSTREAM
 
2177 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Panaglib SIS Suplemental (83k) April 19, 2024 100 April 15, 2024 Completed and provided 5 copies to programmer.
 
2178 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Blucon-Albatana CIS Suplemental. April 19, 2024 100 April 15, 2024 Completed and provided 5 copies to programmer.
 
2191 INTO, LEE WARREN PLANNING Prepare FSDE Report as of April 15, 2024 April 15, 2024 100 April 15, 2024 Prepared and printed 3 copies. Submitted advanced e-copy to RIO.
 
2192 INTO, LEE WARREN PLANNING Prepare Plan and Profile of Padada RIS Lateral B3-A (Sta. 1+270 to 1+819) for PRIS MODERNIZATION April 19, 2024 100 April 16, 2024 Completed.
 
2196 ENCABO, PRINCESS SHAIRA MAE PLANNING Coordination meeting with DENR-PENRO NGP and Watershed Focal re: Potential Sites for IWRMP Implementation. April 15, 2024 100 April 15, 2024
 
2197 ENCABO, PRINCESS SHAIRA MAE PLANNING Submit damage report: Forest Fire Incident in Mal RIS plantation site. April 15, 2024 100 April 15, 2024 Completed and submitted.
 
2198 ENCABO, PRINCESS SHAIRA MAE PLANNING Submit letter request of extension of Year 1 & 2 personnel for the watering activities of IWRMP. April 15, 2024 100 April 15, 2024 Completed.
 
2209 CUICO, JHO-ANN A. PLANNING Prepared Layout map for POW, Turnover Attachment April 15, 2024 100 April 15, 2024 Prepared Layout Map for KISULAN PIP for Survey Purposes, Prepared Layout Map for BOLOBOLO (MCP1, Lat. A, Lat. B, Lat. C, Lat. D = 3,760.79 Meters), Diversion Works Sluice Gate and Intake Gate
 
2210 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for MALIGAY CIS (MAIN CANAL: Sta.: 2+620.00 - 2+800.00) = 180 Meters April 15, 2024 100 April 15, 2024 COMPLETED
 
2220 EUGENIO, VENANN PLANNING Finalize Annex 4-30 of Padada RIS Modernization FSR April 15, 2024 100 April 15, 2024 Completed Annex 4-30; 70% - Edit Miral SRIS inventory report; 100% - Prepare communication letter
 
2221 EUGENIO, VENANN PLANNING Update and Finalize Miral SRIS Inventory Report April 16, 2024 100 April 16, 2024 Updated Miral SRIS inventory report completed with binded hard copy.
 
2222 EUGENIO, VENANN PLANNING Attend Planning and Design Assessment at Davao Oriental April 19, 2024 100 April 19, 2024
 
2226 CUICO, JHO-ANN A. PLANNING Prepared layout Map for POW attachments April 16, 2024 100 April 16, 2024 COMPLETED: Concreting along Main Canal 0+000.00 - 0+013.50 = 13.50 Meters, Prepared Layout Maps for PCR/TURNPOVER Attachment
 
2227 CUICO, JHO-ANN A. PLANNING Prepared liquidation Report and Other Documents of PLANNING and DESIGN SEMESTRAL ASSESSMENT ACTIVITY April 16, 2024 100 April 16, 2024 COMPLETED
 
2234 INTO, LEE WARREN PLANNING Attend Planning and Design Assessment at Davao Oriental. April 19, 2024 100 April 19, 2024 Attended.
 
2235 ESPADERA, MA LOURDES PLANNING Attend PDS Assessment April 18, 2024 100 April 18, 2024
 
2236 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Mal RIS Roads 2023 Supplemental POW April 17, 2024 100 April 17, 2024 Prepared and provided 5 copies to programmer.
 
2237 CAYABYAB, REY JIM PLANNING Attend Regionwide PDS Assessment April 18, 2024 100 April 18, 2024
 
2240 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend Regionwide PDS Assessment April 18, 2024 100 April 18, 2024 Other accomplishments: 4/16/2024 - Checked DTR and prepared payrolls of field personnel of Padada and Mal RIS. - Monitor field personnel activities (watering/tree guards preparation/nursery clearing). - Shapefiles updating
 
2252 SASUMAN, MARY LOUISE J. PLANNING Conduct georesistivity survey in Padada RIS. April 17, 2024 100 April 17, 2024 Completed. Conducted georesistivity survey last April 15-17, 2024.
 
2253 SASUMAN, MARY LOUISE J. PLANNING Prepare Back-to-office Report for the attended of NIA on Social and Environmental Safeguards (SES) and Right-of-way Acquisition (ROWA) Manuals at NIA-Central Office. April 18, 2024 100 April 18, 2024 Completed.
 
2254 SASUMAN, MARY LOUISE J. PLANNING Plot the applied area for Commercial Sand and Gravel (CSAG) to Google Earth. April 18, 2024 100 April 18, 2024 Completed.
 
2255 SASUMAN, MARY LOUISE J. PLANNING Prepare certification for the Commercial Sand and Gravel (CSAG). April 18, 2024 100 April 18, 2024 Completed.
 
2256 SASUMAN, MARY LOUISE J. PLANNING Prepare NWRB Certificate of Posting. April 18, 2024 100 April 18, 2024 Completed.
 
2275 SASUMAN, MARY LOUISE J. PLANNING Upload CNC Application Supporting Documents for Basiawan SPIP. April 19, 2024 100 April 19, 2024 Completed.
 
2276 SASUMAN, MARY LOUISE J. PLANNING Prepare and formulate Chapter 10 of LARF for Padada RIS Modernization FSR. April 19, 2024 100 April 19, 2024 Completed.
 
2277 SASUMAN, MARY LOUISE J. PLANNING Compile the accomplished write-ups per discipline of Padada RIS Modernization FSR. April 19, 2024 100 April 19, 2024 Completed. Only those personnel with accomplished write-up were incorporated in the overall Padada RIS Modernization FSR.
 
2297 MARTURILLAS, JOHN LLOYD PLANNING Conduct re-map test at Asbang SRIP (April 15-17, 2024) with NIA Region XI and Consultant. April 17, 2024 100 April 17, 2024 Completed
 
2298 MARTURILLAS, JOHN LLOYD PLANNING Generating profile and cross-section of Padada Drainage Lateral D 7+858.21m April 18, 2024 100 April 18, 2024 Completed
 
2299 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Lateral A1 of Padada RIS canals April 19, 2024 100 April 19, 2024 Completed
 
2300 MARTURILLAS, JOHN LLOYD PLANNING Generating profile and cross-section of Lateral A1 Padada RIS canals. April 19, 2024 100 April 19, 2024 Completed
 
2307 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend Regionwide PDS Assessment April 19, 2024 100 April 19, 2024 Other accomplishments: 4/17/2024 - Updated seedlings inventory per landowners (Year 1&2). - Initially looped 20 hectares of additional lands to be planted under Y2 implementation
 
2309 CUICO, JHO-ANN A. PLANNING Prepared layout Map for POW attachments April 17, 2024 100 April 17, 2024 COMPLETED: Prepared Layout Map of BLUCON-ALBATANA CIS for POW attachment, Drafting Details of MAL-RIS-RMC LATERAL E-04-03-24 FY 2024 (40%)
 
2310 CAYABYAB, REY JIM PLANNING Attend Regionwide PDS Assessment April 19, 2024 100 April 19, 2024
 
2312 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony April 15, 2024 100 April 15, 2024
 
2313 LUARDO, GLENN D. PLANNING Prepare power point presentation for the conduct of FPIC for the proposed Bolobolo and Sitio Lenna SIP projects. April 15, 2024 100 April 15, 2024 Other Accomplishment: Follow-up Cash Advance in preparation for the conduct of FPIC meeting (100%).
 
2316 CAYABYAB, REY JIM PLANNING Prepare Program of Works (POW) for Maliit Digos SIP April 24, 2024 100 April 22, 2024 April 15, 2024 - 25% Accomplished. April 16, 2024 - 40% Accomplished. April 17, 2024 - 50% Acomplished. April 22, 2024 - Printed draft POW for checking.
 
2321 LUARDO, GLENN D. PLANNING Attend and participate in the conduct of FPIC Consultation meeting @ Brgy. Little Baguio, Malita, Davao Occidental regarding the Bolo-bolo and Sitio Lenna SIP projects. April 16, 2024 100 April 16, 2024
 
2323 CUICO, JHO-ANN A. PLANNING Attended Planning and Design Semestral Assessment Activity April 18, 2024 100 April 18, 2024 COMPLETED
 
2324 CUICO, JHO-ANN A. PLANNING Attended Planning and Design Semestral Assessment Activity April 19, 2024 100 April 19, 2024 COMPLETED
 
2325 CAYABYAB, REY JIM PLANNING Plan station labelling and profile labelling of DRB-1 Sta. 0+000.00 - Sta. 1+553.01 of PRIS Drainage System for Modernization April 16, 2024 100 April 16, 2024
 
2326 LUARDO, GLENN D. PLANNING Attend Planning and Design Coordination Meeting @ Federation Building, NIA DDS-IMO Compound, Digos City regarding the preparation of Planning & Design Section Assessment. April 17, 2024 100 April 17, 2024 Other Accomplishment: Prepared Planning and Design Unit Organizational Chart (100%), Follow-up data request @ Provincial Planning & Development Office (PPDO) of Davao del Sur used for Padada RIS Modernization program (100%).
 
2327 CAYABYAB, REY JIM PLANNING Edited ppt presentation for PDS Regionwide Assessment based on corrections April 17, 2024 100 April 17, 2024
 
2328 LUARDO, GLENN D. PLANNING Attend Planning and Design Assessment at Davao Oriental April 18, 2024 100 April 18, 2024
 
2329 LUARDO, GLENN D. PLANNING Attend Planning and Design Assessment at Davao Oriental April 19, 2024 100 April 19, 2024
 
2330 HERNAN, ALDEN PLANNING Design and draft Sampaguita CIS Diversion Works: Installation of Sheet Pile Cut Off Wall Downstream Apron and Transition of Right Side Protection Works April 17, 2024 100 April 17, 2024 Completed/For sign. Inserted works: Participate in the conduct of Dry Run (04/17/2024), prepare TEV, request for memorandum, prepare trip ticket for deployment to region office
 
2331 HERNAN, ALDEN PLANNING Attend and participate planning and design Assesment at Pilot's View , Baganga, Davao Oriental April 18, 2024 100 April 18, 2024 completed
 
2332 HERNAN, ALDEN PLANNING Attend and Participate Planning and Design Assessment at Pilot's View, Baganga, Davao Oriental April 19, 2024 100 April 19, 2024 completed
 
2341 INTO, LEE WARREN PLANNING Prepared PERT-CPM Diagram for Maliit Digos SIP adtl Fund (10M) April 22, 2024 100 April 22, 2024 Prepared and submitted draft to Programmer.
 
2351 EUGENIO, VENANN PLANNING Prepare data and maps for presentation of Miral SRIS report to O&M unit April 22, 2024 100 April 22, 2024 Completed. Prepare and consolidate PDU ISO Forms 36, 39, 126, 174, and 175
 
2352 INTO, LEE WARREN PLANNING Prepare PERT-CPM for UNIFARM CIS supplemental April 22, 2024 100 April 22, 2024 Prepared and provided 5 copies to programmer.
 
2353 INTO, LEE WARREN PLANNING Prepare Plan & Profile for PARAT LMC for Padada RIS Modernization April 26, 2024 50 April 26, 2024 Template prepared. Found few errors on survey data.
 
2354 ENCABO, PRINCESS SHAIRA MAE PLANNING Nursery and plantation site visit in Padada RIS to monitor the watering activities and to facilitate the tasks to the field personnel therein. April 22, 2024 100 April 22, 2024 Site visited nursery and plantation sites to facilitate water and tree guard delivery.
 
2355 ENCABO, PRINCESS SHAIRA MAE PLANNING Site visitation at Brgy. Langa-an and San Miguel plantation sites. April 23, 2024 100 April 23, 2024 Delivered tree guards, and water, and monitored the status of planted seedlings in PRIS Plantation Sites.
 
2356 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony April 22, 2024 100 April 22, 2024
 
2357 LUARDO, GLENN D. PLANNING Prepare & submit updated required documents for CNC application of the proposed Kisulan SPIP. April 22, 2024 100 April 22, 2024 Other Accomp: Assist in processing documents for liquidation for the conducted PDS Semestral Assessment (100%), Prepared updated layout map of Basiawan PIP for CNC application (100%), Posting 2 NOA & NTP for NIA Irrigation Projects (100%).
 
2358 INTO, LEE WARREN PLANNING Prepare Plan & Profile for SMIA Main Canal for Padada RIS Modernization April 26, 2024 80 April 26, 2024 For polishing.
 
2359 INTO, LEE WARREN PLANNING Prepare Plan & Profile for SMIA Lateral A for Padada RIS Modernization April 26, 2024 80 April 26, 2024 For polishing.
 
2360 INTO, LEE WARREN PLANNING Prepare Plan & Profile for SMIA Lateral A1 for Padada RIS Modernization April 26, 2024 80 April 26, 2024 for polishing
 
2396 EUGENIO, VENANN PLANNING Conduct Project ID at the Proposed Matanao-Balabag SRIP April 25, 2024 100 April 25, 2024 Completed. Other Accomp. : Process Certificates for TOT
 
2398 EUGENIO, VENANN PLANNING Other Tasks April 23, 2024 100 April 23, 2024 Receive, process, plotting and releasing of LUC and TOT applications. Prepara PDU ISO Forms 05, 08, 78, 190, and 191.
 
2405 INTO, LEE WARREN PLANNING Prepare Plan & Profile for Padada RIS Lateral A1 for Padada RIS Modernization April 26, 2024 100 April 23, 2024 Completed
 
2406 INTO, LEE WARREN PLANNING Conduct of Project Validation regarding Lanuro CIS particularly the repair of damaged dam located at the Pupuan Creek as per their barangay resolution. April 24, 2024 100 April 24, 2024 Completed
 
2407 ESPADERA, MA LOURDES PLANNING Assist in the preparation of data for Asbang SRIP Map Testing April 15, 2024 100 April 15, 2024
 
2408 ESPADERA, MA LOURDES PLANNING Update FY 2025 Survey Accomplishment with regards to newly submitted Prioritization of O&M on NIS Projects April 15, 2024 100 April 15, 2024
 
2409 ESPADERA, MA LOURDES PLANNING Drafted template for Survey Checklist form with coordination of Design Engineers April 15, 2024 100 April 15, 2024
 
2410 ESPADERA, MA LOURDES PLANNING Drafted Request for Renewal of JO Personnel at Suawan SRIP April 15, 2024 100 April 15, 2024
 
2411 ESPADERA, MA LOURDES PLANNING Assist in the processing of Data on Day 1 of Asbang SRIP Map Testing April 15, 2024 100 April 15, 2024
 
2412 ESPADERA, MA LOURDES PLANNING Finalize plotting of Padada RIS Modernization (DE)- PARAT LMC (0+000 - 7+493.27) April 15, 2024 100 April 15, 2024 90
 
2413 ESPADERA, MA LOURDES PLANNING Other Miscellaneous Works: - Prepare TR and Trip Tickets for Survey Team - Reply to the query of CEST regarding Suawan Topo Survey Updates - Follow-up request for RTK Charging Cable April 15, 2024 100 April 15, 2024
 
2414 ESPADERA, MA LOURDES PLANNING Conform/Check Survey Personnel DTR April 16, 2024 100 April 16, 2024
 
2415 ESPADERA, MA LOURDES PLANNING Prepare WAR and DTR April 16, 2024 100 April 16, 2024
 
2416 CAYABYAB, REY JIM PLANNING Prepare Payroll for Survey Team JO Personnel April 16, 2024 100 April 16, 2024
 
2417 ESPADERA, MA LOURDES PLANNING Attend Planning & Design Assessment April 18, 2024 100 April 18, 2024
 
2418 ESPADERA, MA LOURDES PLANNING Attend Planning & Design Assessment April 19, 2024 100 April 19, 2024
 
2419 ESPADERA, MA LOURDES PLANNING Attend Planning & Design Assessment April 20, 2024 100 April 20, 2024
 
2420 ESPADERA, MA LOURDES PLANNING Facilitate the requirement for payment of accommodation of RIO Personnel and request the issuance of their CA's April 16, 2024 100 April 16, 2024
 
2421 ESPADERA, MA LOURDES PLANNING Attend Dry Run on the Presentation for Planning & Design Assessment April 17, 2024 100 April 17, 2024
 
2422 ESPADERA, MA LOURDES PLANNING Comply Additional Comments of RIO on the submitted survey report of Pagan SRIP April 17, 2024 100 April 23, 2024
 
2423 ESPADERA, MA LOURDES PLANNING Finalize Generation of Profile of Parat LMC, SMIA MC, SMIA Lat A and SMIA Lat A1 April 16, 2024 100 April 17, 2024
 
2427 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare communication letter to COA regarding the fire incident at MAL RIS Plantation April 24, 2024 100 April 24, 2024 Prepared and submitted. Other Accomplishments: - Prepared and submitted the IWRMP Progress Report for April 2024. - Draft layout with actual picture of watering activities in PRIS Plantation Sites.
 
2440 EUGENIO, VENANN PLANNING Presentation of Miral SRIS Inventory Report to O&M Unit April 24, 2024 100 April 24, 2024 Completed. Other Tasks: Prepare communication letter, Certificates of Transfer of Title, travel documents for Project ID
 
2441 LUARDO, GLENN D. PLANNING Prepare liquidation report for the conducted FPIC Consultation meeting @ Brgy. Little Baguio, Malita, Davao Occidental for the proposed Bolobolo and Sitio Lenna SIP projects. April 23, 2024 100 April 23, 2024 Other accomp: Facilitate in the distribution of IT equipment purchased by the Planning and Design Unit (100%), Follow-up NCIP Davao del Sur Provincial Officer for the WFP of the scheduled FPIC Consultation meeting for the proposed Cogon Bacaca SRIP (50%).
 
2442 LUARDO, GLENN D. PLANNING Prepare BTOR for the conducted FPIC Consultation meeting @ Brgy. Little Baguio, Malita, Davao Occidental for the proposed Bolobolo SIP and Sitio Lenna SIP Projects. April 24, 2024 100 April 24, 2024 Other accomp: Prepared list of office supplies and equipment for the use of Planning & Design Unit (100%), Calibrate newly purchased drone in preparation for the conduct of project ID of Planning & Design personnel (100%); Assist in the preparation of TR
 
2443 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony April 22, 2024 100 April 22, 2024 COMPLETED
 
2444 CUICO, JHO-ANN A. PLANNING Received,Record,Reproduce Engineering Documents April 22, 2024 100 April 22, 2024 COMPLETED
 
2445 CUICO, JHO-ANN A. PLANNING Drafting MAL-RIS-RMC LATERAL E - 04-03-24 FY 2024 April 22, 2024 60 April 22, 2024 COMPLETED
 
2446 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for LACSON CIS for PCR Attachment April 22, 2024 100 April 22, 2024 COMPLETED
 
2447 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR attachments April 23, 2024 100 April 23, 2024 COMPLETED
 
2448 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents April 23, 2024 100 April 23, 2024 COMPLETED
 
2449 CUICO, JHO-ANN A. PLANNING Inputed Data to LUC Logbook Certifications Received April 23, 2024 100 April 23, 2024 COMPLETED
 
2460 INTO, LEE WARREN PLANNING Crafting of Mal RIS Access Road-RMC Lat. E & RMC Lat. E Ext. Detailed Engineering Designs April 26, 2024 80 April 25, 2024 Completed draft DED and submitted e-copy to RIO for checking.
 
2461 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Bangkal CIS April 26, 2024 100 April 25, 2024 Prepared and provided 5 copies to programmer.
 
2462 ENCABO, PRINCESS SHAIRA MAE PLANNING Site visitation at Padada RIS nursery and plantation sites. April 25, 2024 100 April 25, 2024 - Monitored/oversee the watering activities and the status of plants at PRIS plantation sites; and instructed the repair and maintenance of the nursery. - Facilitated water delivery for plantation sites.
 
2463 ENCABO, PRINCESS SHAIRA MAE PLANNING Revised POW YEAR 3 OF MAL AND PRIS (Printed) April 26, 2024 100 April 26, 2024 Printed and submitted.
 
2468 CUICO, JHO-ANN A. PLANNING Drafting MAL-RIS-RMC LATERAL E - 04-03-24 FY 2024 April 23, 2024 70 April 23, 2024 Other Accomplishments: Prepared Layout Maps for POW, PCR Attachments Bangkal CIS, Kilolog CIS, Bala-Kanapulo CIS, Maligaya CIS (100%)
 
2469 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents April 24, 2024 100 April 24, 2024 COMPLETED
 
2470 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR attachments April 24, 2024 100 April 24, 2024 COMPLETED: Waterfall SIP - Revised-POW - P 1,000,000.00
 
2471 LUARDO, GLENN D. PLANNING Communication letter for OBU MANUVU for the conduct of FPIC for the 3rd District Davao City SRIPs April 29, 2024 100 April 29, 2024 Other Accomp: Prepared 2 PR for Fuel and Oil (100%), Prepared communication letter to Digos City Accessors Office for secondary data to be used for PRIS Modernization Program (100%)
 
2472 LUARDO, GLENN D. PLANNING Prepare PROPOSAL for the conduct of assembly meeting bet the Obu Manuvo and NIA personnel April 29, 2024 70 April 29, 2024 For schedule of the conduct of the activity.
 
2473 LUARDO, GLENN D. PLANNING Update the status of the conduct of FPIC in NCIP Province April 29, 2024 100 May 29, 2024
 
2474 LUARDO, GLENN D. PLANNING Spearhead the Purchase Request from Survey Team and Nursery April 29, 2024 100 April 29, 2024 Completed Purchase Request (PR) on Nursery materials (100%), Requisition of Survey equipments for signature by the Manager.
 
2476 LUARDO, GLENN D. PLANNING BTOR of the conducted Project ID at Matanao Balabag , Matanao Davao del Sur April 30, 2024 100 April 30, 2024 Other Accomp: Posting 1 NOA & NTP for NIA Irrigation Projects (100%).
 
2477 EUGENIO, VENANN PLANNING BTOR of the conducted Project ID at Matanao Balabag , Matanao Davao del Sur April 30, 2024 100 April 30, 2024 Other Accomplishments: 100% - Prepare and submit DTR 100% - Preare layout map for BTOR attachment 30% - Update write-up for PRIS Modernization 100% - Process LUC Applications
 
2478 EUGENIO, VENANN PLANNING Prepare Timeline for the FY 2025 Validation (May to June 2024) or earlier April 29, 2024 100 April 29, 2024 Other Accomplishments: 100% Countercheck validated and surveyed FY 2025 proposed projects; 80% - Prepare BTOR for the Matanao-Balabag SRIP project ID
 
2479 ESPADERA, MA LOURDES PLANNING Submit SUAWAN SRIP SURVEY DATA REPORT TO RIO May 15, 2024 40 May 10, 2024 Topomap ongoing revision
 
2484 EUGENIO, VENANN PLANNING Attend PSC Quarterly Meeting at SportsComplex, Matti. April 26, 2024 100 April 26, 2024 Meeting attended.
 
2486 HERNAN, ALDEN PLANNING Carry out detailed Engineering design of Cogon Bacaca SRIP: Determining canal elevations ( ws, cb, tb) and structures (sta. 0+000.00-sta. 0+775.45) April 26, 2024 100 April 26, 2024 completed
 
2487 INTO, LEE WARREN PLANNING Attend Flag Ceremony April 22, 2024 100 April 22, 2024 Attended on time.
 
2494 ESPADERA, MA LOURDES PLANNING Submitted Additional Comments of RIO on the Revised Survey Report of Pagan SRIP April 23, 2024 100 April 23, 2024
 
2495 ESPADERA, MA LOURDES PLANNING Prepared Revised Suawan SRIP Topographic Map (Imported each raw data from February to April Survey) April 23, 2024 100 April 23, 2024 30% Accomplished on this day
 
2496 ESPADERA, MA LOURDES PLANNING Discussion with IMO and RIO Design Engineers regrading their concerns on the submitted Cogon Bacaca SRIP Topographic Map thru Virtual April 23, 2024 100 April 23, 2024
 
2497 ESPADERA, MA LOURDES PLANNING Miscellaneous: Replied to CEST thru email regarding Suawan Survey Activities Updates April 23, 2024 100 April 23, 2024
 
2498 ESPADERA, MA LOURDES PLANNING Back Track raw survey data of CBSRIP to check whether submitted topographic map has one reference control point April 24, 2024 100 April 24, 2024 50% Accomplished on this day
 
2499 ESPADERA, MA LOURDES PLANNING Retrieve IA resolutions from Online Tracker daily to be used as a reference for Surveying Activities for FY 2025 Projects April 24, 2024 100 N/A Blucon-Albatana CIS
 
2500 ESPADERA, MA LOURDES PLANNING Prepare Travel Request and Trip Tickets for Survey Team April 24, 2024 100 April 24, 2024
 
2501 ESPADERA, MA LOURDES PLANNING Follow up procurement on the RTK Charging Cable and Radios Requests April 24, 2024 100 April 24, 2024
 
2502 ESPADERA, MA LOURDES PLANNING Prepared Revised Suawan SRIP Topographic Map (Imported each raw data from February to April Survey) April 24, 2024 100 April 24, 2024 Import Completed
 
2503 ESPADERA, MA LOURDES PLANNING Checked Previous day Survey Data length and location April 25, 2024 100 N/A Kilolog CIS
 
2504 ESPADERA, MA LOURDES PLANNING Prepared Revised Suawan SRIP Topographic Map (Plotted proposed Canal Alignment) April 25, 2024 100 April 25, 2024
 
2505 ESPADERA, MA LOURDES PLANNING Plotted & Identified location of LUC Applied Area (2 Titles) April 25, 2024 100 April 25, 2024
 
2506 ESPADERA, MA LOURDES PLANNING Update FY 2025 Projects Monitoring April 25, 2024 100 April 25, 2024
 
2507 ESPADERA, MA LOURDES PLANNING Miscellaneous Works: Provide KMZ for Project ID on Proposed SRIP; Prepare Survey Team Travel Request and Trip Tickets; Provide Benchmarks data for Survey Team; Requested Certificate of Distributorship from SICCION April 25, 2024 100 April 25, 2024
 
2508 ESPADERA, MA LOURDES PLANNING Checked Previous day Survey Data length and location April 26, 2024 100 April 26, 2024 Blucon-Albatana CIS
 
2509 ESPADERA, MA LOURDES PLANNING Retrieve IA resolutions from Online Tracker daily to be used as a reference for Surveying Activities for FY 2025 Projects April 26, 2024 100 April 26, 2024 For Lanuro CIS
 
2510 ESPADERA, MA LOURDES PLANNING Back Track raw survey data of CBSRIP to check whether submitted topographic map has one reference control point April 26, 2024 100 May 3, 2024
 
2512 ESPADERA, MA LOURDES PLANNING Added a monitoring form to check if all survey data from raw files, geotag photos, fieldbooks, IA Reso used, IA Validation Form and Survey Checklist are submitted by Team Leader April 26, 2024 100 April 26, 2024
 
2513 ESPADERA, MA LOURDES PLANNING Miscellaneous Works: Attended 2 Clients Claiming/Applying for Transfer of Title; Prepare Survey Team TR and Trip Tickets; Prepare BMs for Survey Activity Reference April 26, 2024 100 April 26, 2024
 
2514 ESPADERA, MA LOURDES PLANNING Plotted & Identified location of LUC Applied Area (1 Title Only) April 26, 2024 100 April 26, 2024
 
2515 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Padada RIS canal lateral A Checking and Importing of points of Padada Drainage DRA and DRC April 22, 2024 100 April 22, 2024 Completed
 
2516 MARTURILLAS, JOHN LLOYD PLANNING Generating profile and cross-section of Padada RIS drainage DRA 7+343.25m, DRC 3+036.28 April 23, 2024 100 April 23, 2024 Completed
 
2517 SASUMAN, MARY LOUISE J. PLANNING Attend capacity-building activity of the Philippine Groundwater Health Index (PGHI) Project at Institute of Biology, UP Diliman, Quezon City. April 26, 2024 100 April 26, 2024 Attended the capacity-building last April 22-26, 2024.
 
2535 CUICO, JHO-ANN A. PLANNING Polishing MAL-RIS-RMC LATERAL E - 04-03-24 FY 2024 Profile (STA 2+480.85 - STA 3+977.86) April 24, 2024 90 April 24, 2024 Other accomplishments: Organized Liquidation documents during Planning and Design Semestral Assessment Activity, Inputed Data to LUC Certification Tracker
 
2536 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for Indicative POW attachment ( BADAGOY CIS, SUAWAN RIVER- TAMUGAN SIP, BADOMA CIS, PADADA RIS (Sacub Dam & Parat Dam, KILOLOG CIS April 25, 2024 100 April 25, 2024 COMPLETED
 
2537 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents April 25, 2024 100 April 25, 2024 COMPLETED
 
2538 CUICO, JHO-ANN A. PLANNING Finalized MAL-RIS-RMC LATERAL E - 04-03-24 FY 2024 PLAN (STA 2+480.85 - STA 3+977.86) - Ready for Print April 25, 2024 100 April 25, 2024 COMPLETED: Profile and Plan Only
 
2539 CUICO, JHO-ANN A. PLANNING Design and Draft MAL RIS RMC LATERAL E FY 2024 Cross Section (STA 2+480.85 - STA 3+977.86) April 26, 2024 100 April 26, 2024 COMPLETED
 
2540 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents April 26, 2024 100 April 26, 2024 COMPLETED
 
2541 CAYABYAB, REY JIM PLANNING Edited/finalized PERT-CPM of San Jose PIP Program of Works from Engr. Into April 22, 2024 100 April 22, 2024
 
2543 CAYABYAB, REY JIM PLANNING Plan station labelling of DRD sta. 0+000.00 - 7+858.21 of PRIS Drainage for Modernization April 23, 2024 100 April 23, 2024 On April 22, 2024 - Labelled sta. 0+000.00 - 4+063.82
 
2544 CAYABYAB, REY JIM PLANNING Prepare TEV of survey team for the month of March. April 23, 2024 100 April 23, 2024
 
2546 CAYABYAB, REY JIM PLANNING Profile labelling of DRD Sta 0+000.00 - 7+858.21 of PRIS Drainage for Modernization April 24, 2024 100 April 24, 2024 On April 23, 2024 - Labeled Sta. 0+000.00 - 2+973.14. April 24, 2024 - Labeled 2+973.14 - 7+858.21.
 
2547 CAYABYAB, REY JIM PLANNING Plan station labeling of DRA Sta. 0+000.00 - 7+343.25 of PRIS Drainage for Modernization April 24, 2024 100 April 24, 2024
 
2548 CAYABYAB, REY JIM PLANNING Plan station labeling of DRC Sta. 0+000.00 - 3+036.28 of PRIS Drainage for Modernization April 24, 2024 100 April 24, 2024
 
2549 CAYABYAB, REY JIM PLANNING Profile labeling of DRA and DRC of PRIS Drainage for Modernization April 24, 2024 100 April 24, 2024
 
2550 CAYABYAB, REY JIM PLANNING Update/finalized Drainage Inventory for Modernization. April 25, 2024 100 April 25, 2024
 
2553 CAYABYAB, REY JIM PLANNING Prepare letter to MARO Malita and DAR Occidental for project validation at Brgy. Little Baguio, Malita, Davao Occidental. April 26, 2024 100 April 26, 2024
 
2556 CAYABYAB, REY JIM PLANNING Prepare corrected documents for the revised Annual Investment Program (AIP) FY 2025 budget proposal for Davao Region - Davao del Sur April 26, 2024 100 April 29, 2024 Printed the necessary documents (transmittal for checking).
 
2557 LUARDO, GLENN D. PLANNING Conduct Project ID at the Proposed Matanao-Balabag SRIP April 25, 2024 100 April 25, 2024
 
2562 INTO, LEE WARREN PLANNING Attend Flag Ceremony April 29, 2024 100 April 29, 2024 Attended on time.
 
2563 INTO, LEE WARREN PLANNING Initial checking of Quality Control Programs for FY 2024 Infrastructures (April 29 - May 3, 2024) May 3, 2024 100 April 29, 2024 Completed.
 
2573 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare and submit Year 1 & 2 maps with attached documentation of the Maintenance & Protection Activities per landowner's parcel. April 29, 2024 100 April 29, 2024 Printed and submitted. Other accomplished works: - Attended flag ceremony. - Prepared and submitted a lay-out map for the potential sites of Year 3 Implementation of (R&P WRSIS) for Mal and Padada RIS.
 
2575 ENCABO, PRINCESS SHAIRA MAE PLANNING Monitor field personnel activities for Maintenance and Protection on the plantation sites. April 29, 2024 100 April 29, 2024 - Facilitated and instructed field personnel to initiate/assist the watering and tree guard installation activities at the plantation sites. Other accomplishments: - Monitoring ongoing progress of landowner through their geotagged photos.
 
2576 ENCABO, PRINCESS SHAIRA MAE PLANNING Site visit nursery and plantation sites of Padada RIS. April 30, 2024 100 April 30, 2024 Other accomplishment: - Prepared attachments for the DTR and prepared payrolls for the field personnel (PRIS/MRIS).
 
2583 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for RMC Lateral E for PLAN Approval Attachment (Sta.: 2+480.85 - 3+977.86) = 1,517.01 Meters April 29, 2024 100 April 29, 2024 COMPLETED
 
2584 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents April 29, 2024 100 April 29, 2024 COMPLETED
 
2585 CUICO, JHO-ANN A. PLANNING Revised Layout Maps for PRIS Modernization Due to additional Data of Expansion Area (Chapter 1) April 29, 2024 100 April 29, 2024 COMPLETED
 
2586 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents April 30, 2024 100 April 30, 2024 COMPLETED
 
2590 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW Attachment of BANGKAL CIS (1+170.00-1+450.00) = 305.00 Meters April 30, 2024 100 April 30, 2024 COMPLETED
 
2591 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for PCR Attachment April 30, 2024 100 April 30, 2024 COMPLETED
 
2592 CAYABYAB, REY JIM PLANNING Prepare listing for FY 2025 Proposed Additional Projects April 25, 2024 100 April 25, 2024
 
2593 ESPADERA, MA LOURDES PLANNING Back Track raw survey data of CBSRIP to check whether submitted topographic map has one reference control point April 29, 2024 100 April 29, 2024
 
2594 ESPADERA, MA LOURDES PLANNING Processing of PRC ID Renewal April 29, 2024 100 April 29, 2024
 
2595 ESPADERA, MA LOURDES PLANNING Checked Previous day Survey Data length and location April 29, 2024 100 April 29, 2024 Lanuro CIS
 
2596 ESPADERA, MA LOURDES PLANNING Miscellaneous Works: Prepare Survey Team Travel Request and Trip Tickets April 29, 2024 100 April 29, 2024
 
2597 ESPADERA, MA LOURDES PLANNING Finalize plotting of Padada RIS Modernization (DE)- LATERAL B3 (0+000 - 7+493.27) April 30, 2024 100 May 3, 2024 Completed
 
2643 INTO, LEE WARREN PLANNING Compiling into 1 PDF file of Padada RIS Modernization Annex B.2 up to Annex B.10 May 3, 2024 100 May 3, 2024 Completed
 
2644 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Padada RIS (50M) under the additional CY 2024 Projects: Construction of protection dike at upstream portion of Parat Dam. May 3, 2024 100 May 3, 2024 Prepared and provided 5 copies to programmer.
 
2645 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Padada RIS (50M) under the additional CY 2024 Projects: Construction of protection dike at upstream portion of Sacub Dam. May 3, 2024 100 May 3, 2024 Prepared and provided 5 copies to programmer.
 
2646 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Suawan River - Tamugan SIP (50M) under the additional CY 2024 Projects May 3, 2024 100 May 3, 2024 Prepared and provided 5 copies to programmer.
 
2647 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Badagoy CIS (50M) under the additional CY 2024 Projects May 3, 2024 100 May 3, 2024 Prepared the PERT-Diagram and forwarded the remaining work to programmer
 
2650 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Miral SRIS Supplemental (340k) under EGPIP-Solar CY 2023 May 3, 2024 100 May 3, 2024 Prepared and provided 5 copies to programmer.
 
2651 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Padada RIS CY 2024 (40M): Construction of Sabo dam 1 unit. May 3, 2024 100 May 3, 2024 Prepared and provided 5 copies to programmer.
 
2656 ENCABO, PRINCESS SHAIRA MAE PLANNING Nursery and site visit at Padada RIS. May 2, 2024 100 May 2, 2024 Facilitated the installation of garden net in Padada RIS nursery.
 
2657 ENCABO, PRINCESS SHAIRA MAE PLANNING Check DTRs of field personnel and preparation of payrolls. May 3, 2024 100 May 3, 2024 Checked DTRs, and prepared and submitted payrolls of field personnel of Padada and Mal RIS.
 
2658 SASUMAN, MARY LOUISE J. PLANNING Conduct georesistivity survey in Padada RIS expansion area. May 2, 2024 100 May 2, 2024 Completed. Conducted georesistivity survey in Colorado, Digos City.
 
2659 SASUMAN, MARY LOUISE J. PLANNING Prepare justification letter for the rescheduled continuation of georesistivity survey in PRIS expansion area. May 3, 2024 100 May 3, 2024 Completed.
 
2660 SASUMAN, MARY LOUISE J. PLANNING Prepare and submit the liquidation of the actual TEV on the attended PGHI seminar. May 3, 2024 100 May 3, 2024 Completed.
 
2661 SASUMAN, MARY LOUISE J. PLANNING Continue the consolidation of the newly accomplished write-ups of Padada RIS Modernization FSR. May 3, 2024 100 May 3, 2024 Completed. Updated those that are newly accomplished sub-topics per discipline.
 
2662 SASUMAN, MARY LOUISE J. PLANNING Assisted the RO Geologist on the data needed on the conducted georesistivity survey in PRIS expansion area. May 3, 2024 100 May 3, 2024 Completed.
 
2664 SASUMAN, MARY LOUISE J. PLANNING Prepare proposed georesistivity lines and other needed documents for the conduct of georesistivity survey in PRIS expansion area. April 30, 2024 100 N/A Completed.
 
2665 INTO, LEE WARREN PLANNING Made few edits on Padada RIS Modernization Chapter 3: Hydraulic Structures May 4, 2024 100 May 4, 2024 Updated the final list of unlined canals of Padada as per survey data. Edited few portions of the write-ups.
 
2666 SASUMAN, MARY LOUISE J. PLANNING Apply CNC for the SIPs as requirement for water permit. April 29, 2024 100 April 29, 2024 Already applied CNC online application of the three SIPs (ready for notarization).
 
2667 MARTURILLAS, JOHN LLOYD PLANNING Plotting, Generate profile and cross-section of Padada RIS Lateral AA STA 0+000.00 - STA 3+099.58 May 3, 2024 100 May 3, 2024 Completed
 
2668 MARTURILLAS, JOHN LLOYD PLANNING Importing of survey data of Padada RIS Lateral A, Labeling of Plan of Padada RIS Lateral A 7+385.22 Plotting of Padada RIS Lateral A 7+385.22 April 29, 2024 100 April 29, 2024 Completed
 
2669 MARTURILLAS, JOHN LLOYD PLANNING Generate profile and cross-section of Padada RIS Lateral A 7+385.22m Labeling of Profile of Padada RIS Lateral A 7+385.22m April 29, 2024 100 April 30, 2024 April 30, 2024 *Completed
 
2670 SASUMAN, MARY LOUISE J. PLANNING Update and submit the lacking requirements of the previously applied CNC of Basiawan SPIP. April 29, 2024 100 April 29, 2024 Completed and submitted the lacking requirements needed. Other accomplishment: Attended flag raising ceremony.
 
2671 MARTURILLAS, JOHN LLOYD PLANNING Checking of survey data, Plotting and Labeling of Padada RIS lateral B2 May 2, 2024 50 May 2, 2024 Lacking of survey data
 
2673 EUGENIO, VENANN PLANNING Conduct water balance analysis for integration area damsites; Prepare Additional IWR of Coconut for PRIS Modernization May 2, 2024 100 May 2, 2024 Other Accomplishments: Assist transfer of title and LUC Applicants; Prepare travel documents for inspection with DPWH.
 
2674 EUGENIO, VENANN PLANNING Conduct inspection with DPWH for the irrigation facilities affected by road widening at Padada RIS May 3, 2024 100 May 3, 2024 Other Accomplishments: Conduct inspection of damaged irrig. facility due to road widening at San Jose SIP; Conduct inspection for LUC application at Brgy. Dulangan, Digos City
 
2691 LUARDO, GLENN D. PLANNING Prepare Tables 2.3.2, 2.3.5, 2.2.6A-6B-6C-6D for Padada RIS Modernization Feasibility Study May 2, 2024 100 May 2, 2024 Other Accomp: Prepared Table 1 for Padada RIS LARP (80%), Prepared Table 2 for Padada RIS LARP (20%).
 
2695 LUARDO, GLENN D. PLANNING Follow-up Cash Advance regarding the conduct of FPIC @ the proposed Basiawan SPIP Project May 3, 2024 100 May 3, 2024 Other Accompl.: Prepared 3 Purchased Request for the use of Planning and Design Activity (100%).
 
2702 LUARDO, GLENN D. PLANNING Prepare proposal for the conduct of Pre-conference meeting with the NCIP regarding the proposed Cogon Bacaca SRIP. May 3, 2024 100 May 3, 2024
 
2727 CAYABYAB, REY JIM PLANNING Prepare Badagoy CIS Program of Work - 50M under Additional Fund CY 2024 April 30, 2024 100 April 30, 2024 April 29, 2024 - 50% Accomplished. April 30, 2024 - For Checking.
 
2731 CAYABYAB, REY JIM PLANNING Prepare PERT CPM of Badagoy CIS - 50M under Additional Fund CY 2024 May 1, 2024 100 May 1, 2024 Continued the remaining works forwarded by Engr. Into
 
2732 CAYABYAB, REY JIM PLANNING Print, bind, and submit Badagoy CIS Program of Work - 50M under Additional Fund CY 2024 May 1, 2024 100 May 1, 2024
 
2733 CAYABYAB, REY JIM PLANNING Print, bind, and submit San Jose PIP (Maliit Digos) Program of Work May 2, 2024 100 May 2, 2024
 
2734 CAYABYAB, REY JIM PLANNING Prepare Plan & Profile of Drainage-I (DRI) for Padada RIS Modernization May 3, 2024 100 May 3, 2024
 
2735 CAYABYAB, REY JIM PLANNING Prepare Plan & Profile of Drainage B-1 for Padada RIS Modernization May 3, 2024 100 May 3, 2024
 
2736 CAYABYAB, REY JIM PLANNING Update the cost of proposed irrigation canals as per design of Padada RIS Modernization May 4, 2024 100 May 4, 2024
 
2737 HERNAN, ALDEN PLANNING Drafting &Design of Sampaguita CIS as per Regional Designer Comments and change of [erper size to A3 to A1, Attend PSB April 29, 2024 100 April 29, 2024 plan submitted to RIO, Attended PSB interview
 
2738 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents May 2, 2024 100 May 2, 2024 COMPLETED
 
2739 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW attachment May 2, 2024 100 May 2, 2024 COMPLETED: Maliit Digos SIP (Solar-Electro-mechanical Works: Pump System, Well Development, Reservoir Tank) EGPIP-SOLAR_CY 2024
 
2740 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW attachment May 2, 2024 100 May 2, 2024 COMPLETED: Bangkal CIS (CANALIZATION WORKS: Main Canal: 1+170.00 - 1+475.00) Supplemental POW_Repair-CIS_CY 2023
 
2741 CUICO, JHO-ANN A. PLANNING Prepare Layout Maps for POW attachment May 2, 2024 100 May 2, 2024 COMPLETED: PADADA RIS (Protection Works: Sabu Dam Type 2 Units at downstream Main Dam) INDICATIVE POW_CY 2024
 
2742 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents May 3, 2024 100 May 3, 2024 COMPLETED
 
2743 CUICO, JHO-ANN A. PLANNING Input Data to LUC logbook for O&M Datasheet/Tracker May 3, 2024 100 May 3, 2024 COMPLETED
 
2746 HERNAN, ALDEN PLANNING Design and draft Cogon Bacaca SRIP Lat. B1 ( canal dimension, ws, cb, tb, identification of canal structures) May 2, 2024 100 May 2, 2024 Check by Engr. Lei Dinopol, for design of identified canal structures
 
2747 CUICO, JHO-ANN A. PLANNING Design and drafting of MAL RIS (LMC Lateral E: Sta.: 0+000.00 - 3+621.18) May 3, 2024 40 May 3, 2024 Other Accomplishments: Prepare Layout Map for POW attachment PADADA RIS (Lateral A Sta.: 2+485.56-3+516.94, Lateral A1 Sta.: 0+007.45 - 0+379.05 with Canal Structures - 100%)
 
2748 HERNAN, ALDEN PLANNING Design of Identified canal structures at Cogon Bacaca SRIP Lat. B1 (flume,) May 3, 2024 50 N/A on-going
 
2749 CUICO, JHO-ANN A. PLANNING Prepare Layout Maps for POW attachment May 3, 2024 100 May 3, 2024 COMPLETED: Suawan River-Tamugan SIP (Diversion Works Main Dam & Protection Works Up & Down Stream)_Additional Fund_CY 2024
 
2750 CUICO, JHO-ANN A. PLANNING Design and drafting of MAL RIS (LMC Lateral E: Sta.: 0+000.00 - 3+621.18) May 4, 2024 65 May 4, 2024 Other Accomplishments: Prepared Layout Map for Basiawan PIP (HDPE PIPE CANAL: MPL1, MPL2, MPL3, SPL2, MPL4, MPL5), HDPE Pipe Structures (100%)
 
2751 CUICO, JHO-ANN A. PLANNING Prepared General Layout Map for PCR/Turn Over Documents Attachment (BADOMA CIS, KILOLOG CIS, MALIGAYA CIS) May 4, 2024 100 May 4, 2024 COMPLETED
 
2752 CUICO, JHO-ANN A. PLANNING Preparation of Padada RIS Modernization FSR compliance to the recommendation as per NIACO PPD Comments (Prepared Layout Maps base on the final Delineated of Expansion Area) May 4, 2024 30 May 4, 2024
 
2783 ENCABO, PRINCESS SHAIRA MAE PLANNING Collection of Daily Inspector's Report for Padada and Mal RIS. May 6, 2024 100 May 6, 2024 Completed and compiled.
 
2784 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare a lay-out map as per plantation site activities. May 6, 2024 100 May 6, 2024 Completed but needs to be revised.
 
2785 ENCABO, PRINCESS SHAIRA MAE PLANNING Nursery site visit and plantation site monitoring (Year 1 & 2) in Padada RIS. May 7, 2024 100 May 7, 2024 Site visited and inventoried seedlings survival rate under Year 1 plantation sites.
 
2787 EUGENIO, VENANN PLANNING Prepare communication letter for the DPWH concerning with the construction activities with PL Sebastian @ PRIS May 7, 2024 100 May 7, 2024 Other Accomplishments: Prepare write-up of Chapter 2.3.1; Prepare various data requested by O&M and Construction Unit (PIA, Location of Projects Implemented, etc.); Draft and submit Comunication Letter to DPWH; Assist TOT Applicants; Volleyball practice
 
2809 INTO, LEE WARREN PLANNING Attend Flag Ceremony May 6, 2024 100 May 6, 2024 Attended on time.
 
2810 INTO, LEE WARREN PLANNING Further discuss existing write-ups of Padada RIS Modernization Chapter 3: Hydraulic Structures May 10, 2024 100 May 10, 2024 Completed. E-files saved at Team Collab server drive.
 
2812 INTO, LEE WARREN PLANNING Preparation and finalization of Mal RIS access road-RMC Lat. E & RMC Lat. E Extension Detailed Engineering Plans. May 10, 2024 100 May 10, 2024 Completed.
 
2813 INTO, LEE WARREN PLANNING Preparation and finalization of Mal RIS access road-RMC & RMC Supplementary Detailed Engineering Plans. May 10, 2024 80 May 11, 2024 For polishing
 
2814 INTO, LEE WARREN PLANNING Preparation and finalization of Mal RIS access road-RMC Lateral E Extension & Right Main Canal Detailed Engineering Plans. May 10, 2024 30 May 10, 2024 500 meters designed, 700 meters to follow. Crafting of DED paused due to focusing on PRIS Modernization
 
2815 INTO, LEE WARREN PLANNING Preparation and finalization of Mal RIS access road-RMC Lateral E Detailed Engineering Plans. May 10, 2024 90 May 10, 2024 For Printing.
 
2816 INTO, LEE WARREN PLANNING Prepare Convergence Report for the month of April May 8, 2024 100 May 8, 2024 Prepared and submitted advanced e-copy(.xls) via email to RIO.
 
2817 INTO, LEE WARREN PLANNING Costing of FSDE Funds (May 6 - 10, 2024) May 10, 2024 100 May 10, 2024 Completed.
 
2820 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Cebuza SIS - Supplemental (51.497k) May 9, 2024 100 May 8, 2024 Prepared and provided 5 copies to programmer.
 
2827 ESPADERA, MA LOURDES PLANNING Cogon Bacaca Layout reflecting the landowners (overlay if its CADT or A&D) May 9, 2024 100 May 9, 2024
 
2828 EUGENIO, VENANN PLANNING Attend virtual meeting Capacity Building Activity on Introduction to the Public Private Partnership (PPP) Code of the Philippines and its Implementing Rules and Regulations May 9, 2024 100 May 9, 2024 Other Accomplishments: Assist clients/applicants for LUC and TOT; Revise BTOR of Proposed Matanao-Balabag SRIP as per comments ; volleyball practice
 
2829 EUGENIO, VENANN PLANNING Revised the BTOR of Matanao Balabag SRIP as per MLCJ comments/instructions May 10, 2024 100 May 10, 2024 Participate in the capacity-building activity on introduction to the public-private partnership (PPP) code of the Philippines and its implementing rules and regulations (Day 2); Assist clients/applicants for LUC and TOT; Revise BTOR of Proposed Matanao-Ba
 
2864 ENCABO, PRINCESS SHAIRA MAE PLANNING Site Monitoring for Year 1 & 2 plantation sites in Padada RIS. May 8, 2024 100 May 8, 2024 Monitored the ongoing watering and tree guard preparation/installation activities in Padada RIS.
 
2865 ENCABO, PRINCESS SHAIRA MAE PLANNING Site Monitoring for Year 1 & 2 plantation sites in Padada RIS. May 9, 2024 100 May 9, 2024 Monitored and conduct inventory in Brgy. Malabang plantation sites. Site visited nursery and monitored existing plants therein.
 
2866 ENCABO, PRINCESS SHAIRA MAE PLANNING Site Monitoring for Year 1 & 2 plantation sites in Padada RIS. May 10, 2024 100 May 10, 2024 Monitored the ongoing watering activities in Y1 & Y2 plantation sites.
 
2867 EUGENIO, VENANN PLANNING Prepare communication letter for the DPWH concerning with the construction activities with PL Sebastian @ PRIS May 7, 2024 100 May 8, 2024 Other Accomplishments: Prepare layout map for Communication Letter attachment; Assist in the finalization of shapefiles for the PRIS Modernization Integration and Expansion areas for the third cropping season and HVC area; Assist in the finalization of
 
2868 EUGENIO, VENANN PLANNING Prepare write-up of Chapter 5.6.8, 2.1.1 and 2.4.1 May 6, 2024 100 May 6, 2024 Other Accomplishments: Prepare documents and data for Padada RIS FY 2025 Project Validation; Assist TOT Applicants; Volleyball practice
 
2975 MARTURILLAS, JOHN LLOYD PLANNING Conduct surveying activities of NIA land properties at MAL RIS FIELD OFFICE May 6, 2024 100 May 6, 2024
 
2976 MARTURILLAS, JOHN LLOYD PLANNING Conduct surveying activities of NIA land properties at Lower Towak May 7, 2024 100 May 7, 2024
 
2977 MARTURILLAS, JOHN LLOYD PLANNING Comduct surveying activities of NIA land properties at Padada RIS DAM quarters May 8, 2024 100 May 8, 2024
 
2978 MARTURILLAS, JOHN LLOYD PLANNING Conduct surveying activities of NIA land properties at MAL RIS DAM Dongan Pekong May 9, 2024 100 May 9, 2024
 
2979 MARTURILLAS, JOHN LLOYD PLANNING Research survey data at DENR Davao City for survey reference May 10, 2024 100 N/A
 
2983 SASUMAN, MARY LOUISE J. PLANNING Prepare and consolidate Final FSR for Padada RIS Modernization FSR May 8, 2024 75 May 8, 2024 May 6-8, 2024: On-going consolidation and finalization of the write-ups and consolidation of the Annexes. Also, tabulation of accomplishment per discipline is conducted. Other accomplishment: Attended flag raising ceremony.
 
2984 SASUMAN, MARY LOUISE J. PLANNING Prepare and submit to NIA-RIO the JICA Survey Form. May 6, 2024 100 May 7, 2024 Completed and submitted advance copy to RIO.
 
2985 SASUMAN, MARY LOUISE J. PLANNING Attend Seminar on the Right-of-way and Land Titling. May 9, 2024 100 May 10, 2024 Attended the seminar on May 9-10, 2024.
 
2986 HERNAN, ALDEN PLANNING Design of irrigation structures at Lat B1: 3 flume, 2 vertical drops, 5 Rd. X-ing, 1 chute May 10, 2024 90 N/A 3 Flume completed, 3 vertical drop completed, 2 Rd. X-Ing competed checking by the regional designer, design of chute ongoing
 
2987 CAYABYAB, REY JIM PLANNING Prepare detailed cost estimate of the proposed solar powered pumps for Padada RIS Modernization FSR May 6, 2024 100 May 6, 2024
 
2988 CAYABYAB, REY JIM PLANNING Prepare updated proposed implementation schedule of Padada RIS Modernization FSR May 7, 2024 100 May 7, 2024 Other Accomplishment: Revised the Program of Works for San Jose PIP
 
2989 CAYABYAB, REY JIM PLANNING Prepare Plan & Profile of DRD - 1 for Padada RIS Modernization May 8, 2024 100 May 8, 2024
 
2990 CAYABYAB, REY JIM PLANNING Prepare Plan & Profile of DRD - Special for Padada RIS Modernization May 8, 2024 100 May 8, 2024
 
2991 CAYABYAB, REY JIM PLANNING Prepare Plan & Profile of Drainage K (DRK) for Padada RIS Modernization May 8, 2024 100 May 8, 2024
 
2992 CAYABYAB, REY JIM PLANNING Attend seminar on Right of Way and Land Titling May 9, 2024 100 May 9, 2024
 
2993 CAYABYAB, REY JIM PLANNING Attend seminar on Right of Way and Land Titling May 10, 2024 100 May 10, 2024
 
2994 CUICO, JHO-ANN A. PLANNING Design and drafting of MAL RIS (LMC Lateral E: Sta.: 0+000.00 - 3+621.18) May 6, 2024 80 May 6, 2024
 
2995 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents May 6, 2024 100 May 6, 2024 COMPLETED
 
2996 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Inputed Detailes to LOG BOOK LUC Trcaker May 6, 2024 100 May 6, 2024 COMPLETED
 
2997 CUICO, JHO-ANN A. PLANNING Preparation of Padada RIS Modernization FSR compliance to the recommendation as per NIACO PPD Comments (Prepared Layout Maps base on the final Delineated of Expansion Area) May 7, 2024 40 May 7, 2024 Due to finalization of Expansion Area
 
2998 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Inputed Detailes to LOG BOOK LUC Trcaker May 7, 2024 100 May 7, 2024 COMPLETED
 
2999 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents May 7, 2024 100 May 7, 2024 COMPLETED
 
3000 CUICO, JHO-ANN A. PLANNING Design and drafting of MAL RIS (LMC Lateral E: Sta.: 0+000.00 - 3+621.18) - Profiling and Plan May 7, 2024 100 May 7, 2024 COMPLETED: Profiling and PLAN only - for checking (Lacking: Cross sectioning Plan)
 
3001 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW,PCR Attachments May 7, 2024 100 May 7, 2024 COMPLETED
 
3002 CUICO, JHO-ANN A. PLANNING Design and drafting of MAL RIS (LMC Lateral E: Sta.: 0+000.00 - 3+621.18) - Cross sectioning Only May 8, 2024 100 May 8, 2024 COMPLETED: For checking
 
3003 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents May 8, 2024 100 May 8, 2024 COMPLETED
 
3004 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Inputed Detailes to LOG BOOK LUC Trcaker May 8, 2024 100 May 8, 2024 COMPLETED
 
3006 CUICO, JHO-ANN A. PLANNING Prepared Layout map for Little Baguio II Requested from PIC / Contruction for site Visit Purposes May 9, 2024 100 May 9, 2024 COMPLETED
 
3007 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents May 9, 2024 100 May 9, 2024 COMPLETED
 
3009 CUICO, JHO-ANN A. PLANNING Preparation of Padada RIS Modernization FSR compliance to the recommendation as per NIACO PPD Comments (Prepared Layout Maps base on the final Delineated Area of Expansion) - Chapter 1 May 9, 2024 100 May 9, 2024 COMPLETED
 
3010 CUICO, JHO-ANN A. PLANNING Preparation of Padada RIS Modernization FSR compliance to the recommendation as per NIACO PPD Comments (Prepared Layout Maps base on the final Delineated Area of Expansion) - Chapter 2&3 May 10, 2024 80 May 10, 2024
 
3011 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents May 10, 2024 100 May 10, 2024 COMPLETED
 
3012 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for Rehabilitation and Protection of Water Resources Supporting Irrigation System (RPWRSIS) Program - Year 1 May 10, 2024 100 May 10, 2024 COMPLETED
 
3013 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for Rehabilitation and Protection of Water Resources Supporting Irrigation System (RPWRSIS) Program - Year 2 May 10, 2024 100 May 10, 2024 COMPLETED
 
3014 ESPADERA, MA LOURDES PLANNING Conduct Map Test at Cogon - Bacaca SRIP May 6, 2024 100 May 6, 2024
 
3015 ESPADERA, MA LOURDES PLANNING Conduct Map Test at Cogon - Bacaca SRIP May 7, 2024 100 May 7, 2024
 
3016 ESPADERA, MA LOURDES PLANNING Conduct Map Test at Cogon - Bacaca SRIP May 2, 2024 100 May 2, 2024
 
3017 ESPADERA, MA LOURDES PLANNING Conduct Map Test at Cogon - Bacaca SRIP May 3, 2024 100 May 3, 2024
 
3018 ESPADERA, MA LOURDES PLANNING Assist in Processing of CBSRIP Map Test Data May 8, 2024 100 May 8, 2024
 
3019 ESPADERA, MA LOURDES PLANNING Revised Topographic Map of CBSRIP based on initial findings during map test May 8, 2024 100 May 8, 2024 60% Completed on this day
 
3021 ESPADERA, MA LOURDES PLANNING Plotted & Identified location of LUC Applied Area (5 Titles) May 9, 2024 100 May 9, 2024
 
3022 ESPADERA, MA LOURDES PLANNING Update FY 2025 Survey and Plotting Activity Accomplishment May 9, 2024 100 May 9, 2024
 
3023 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony. May 6, 2024 100 May 6, 2024 Other Accomplishment: Prepare FS on Padada RIS Modernization Program (Chapter 2) 60%.
 
3027 CUICO, JHO-ANN A. PLANNING Conducted Dry run of Padada RIS Modernization FSR compliance to the recommendation as per NIACO PPD Comments May 11, 2024 100 May 11, 2024 COMPLETED: Revised Layout Maps base on (Final Delineated Area of Expansion) - Chapter 1&2
 
3028 ESPADERA, MA LOURDES PLANNING Revised Topographic Map of CBSRIP based on initial findings during map test May 10, 2024 90 May 10, 2024
 
3034 ESPADERA, MA LOURDES PLANNING Train Mr. Pasagdan on Basic CAD/Drafting May 10, 2024 100 May 10, 2024
 
3035 LUARDO, GLENN D. PLANNING Prepare FS report for the Padada RIS Modernization Program. May 10, 2024 100 May 10, 2024 Completed FS on Padada RIS Modernization Program (Chapter 10).
 
3036 LUARDO, GLENN D. PLANNING Attend Pre-FPIC meeting @ Brgy., Cogon Bacaca, Kiblawan, Davao del Sur. May 8, 2024 100 May 8, 2024 On May 7, completed FS on Padada RIS Modernization Program (Chapter 2) 100%. Other Accomplishment: Prepare FS on Padada RIS Modernization Program (Chapter 10) 60%.
 
3037 LUARDO, GLENN D. PLANNING Conduct FPIC Consultation Meeting @ Brgy. Basiawan, Sta. Maria, Davao Occidental May 9, 2024 100 May 10, 2024
 
3040 ESPADERA, MA LOURDES PLANNING Finalize plotting of Padada RIS Modernization (DE)- LATERAL B1 (0+000 - 7+038.55) May 2, 2024 100 May 2, 2024
 
3060 INTO, LEE WARREN PLANNING Include write-ups for proposed interceptor drainage at portions of lateral A for Padada RIS Modernization. May 13, 2024 100 May 16, 2024 Completed.
 
3062 INTO, LEE WARREN PLANNING Prepare DED for Mal RIS Access Road - RMC & RMC Supplementary May 17, 2024 99 May 13, 2024 Completed but not yet submitted. (to be submitted together with all the other Mal RIS Roads)
 
3063 INTO, LEE WARREN PLANNING Polishing of Padada RIS Modernization Chapter 3: Hydraulic Structures and Chapter 4: Other Structures May 17, 2024 100 May 16, 2024 Completed
 
3078 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and nursery maintenance in Padada RIS. May 13, 2024 100 May 13, 2024 - Inventory the survival seedlings under Year 1 Implementation in Clib, Hagonoy. - Monitor watering activities in PRIS under Year 1 & 2 Implementation. - Prepared soil media for the propagation of various plants in Padada RIS nursery.
 
3079 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and nursery maintenance in Padada RIS. May 14, 2024 100 N/A - Tree guard installation on-site - DTR dissemination for PRIS field personnel (Y1/Y2) - Nursery visitation and preparation of soil media - Draft communication letter for DENR-CENRO
 
3080 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and nursery maintenance in Padada RIS. May 15, 2024 100 May 15, 2024 - Field monitoring on watering activities and tree guard installation on site @ Clib. - Delivery of water and tree guards @ Malabang. - DTR collection from field personnel. - Nursery visit
 
3081 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and nursery maintenance in Padada RIS. May 16, 2024 100 May 16, 2024 - Field monitoring at Brgy. Langa-an and San Miguel, Matanao, DDS. - Continued the bagging activities in PRIS nursery. - Initially germinated various seedlings found in the planting sites.
 
3082 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and nursery maintenance in Padada RIS. May 17, 2024 100 May 17, 2024 - Facilitated the delivery of water on-site (Mahayahay & Malabang) - Oversee the watering activities under Y1 & Y2 Implementation.
 
3083 CUICO, JHO-ANN A. PLANNING Preparation of Padada RIS Modernization FSR compliance to the recommendation as per NIACO PPD Comments (Prepared Layout Maps base on the final Delineated Area of Expansion) - Chapter 2&3&4 May 13, 2024 100 May 13, 2024 COMPLETED
 
3084 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents May 13, 2024 100 May 13, 2024 COMPLETED
 
3085 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony May 13, 2024 100 May 13, 2024 COMPLETED
 
3086 CUICO, JHO-ANN A. PLANNING Preparation of Padada RIS Modernization FSR compliance to the recommendation as per NIACO PPD Comments (Prepared Layout Maps base on the final Delineated Area of Expansion) - Chapter 5 May 14, 2024 100 May 14, 2024 COMPLETED
 
3087 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents May 14, 2024 100 May 14, 2024 COMPLETED
 
3088 CUICO, JHO-ANN A. PLANNING Tabulated Data Table 5.5. 1. ,Table 5.5. 2. ,Figure 5.5. 3.,Table 5.5. 4.Figure 5.5. 5. for Padada RIS Modernization FSR Base on CO comments May 15, 2024 100 May 15, 2024 COMPLETED
 
3089 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents May 15, 2024 100 May 15, 2024 COMPLETED
 
3095 ESPADERA, MA LOURDES PLANNING Prepared Revised Suawan SRIP Topographic Map May 13, 2024 100 May 13, 2024 40% Completion on this Day
 
3096 ESPADERA, MA LOURDES PLANNING Prepared Revised Suawan SRIP Topographic Map May 14, 2024 100 May 14, 2024 70% Completion on this Day
 
3097 ESPADERA, MA LOURDES PLANNING Miscellaneous: Attended Clients Applying for Transfer of Ownership May 13, 2024 100 May 13, 2024
 
3098 ESPADERA, MA LOURDES PLANNING Prepared Initial Schedule of Surveying Activites for Solar Projects May 14, 2024 100 May 14, 2024
 
3099 ESPADERA, MA LOURDES PLANNING Prepared Pre-Survey Data References for Solar Projects May 14, 2024 100 May 14, 2024
 
3100 ESPADERA, MA LOURDES PLANNING Miscellaneous: Attended Clients Applying for Transfer of Ownership Printed Communication Letter to BLGUs for Asinan SPIP Survey Activities May 14, 2024 100 May 14, 2024
 
3101 ESPADERA, MA LOURDES PLANNING Prepared Revised Suawan SRIP Topographic Map May 15, 2024 100 May 15, 2024 Revision Completed (For Drafting of Print - Ready template)
 
3122 INTO, LEE WARREN PLANNING Costing of FSDE Funds (May 13-17, 2024) May 17, 2024 100 May 17, 2024 Completed
 
3126 INTO, LEE WARREN PLANNING Prepared Annex B.12: Detailed Engineering Design Methodology of Dam Structures May 17, 2024 100 May 14, 2024 Completed
 
3127 INTO, LEE WARREN PLANNING Prepared PERT-CPM for Miral SRIS Supplemental (50k) May 17, 2024 100 May 15, 2024 Completed and provided 5 copies to programmer.
 
3129 HERNAN, ALDEN PLANNING Design Cogon Bacaca SRIP Lateral B1 irrigation canal ( was, CB, TB, identification of canal structures) May 17, 2024 75 N/A Ongoing design Insertion: communicate blgu Cogon for larpf, prepare ,consolidate data for presentation, prepare memo & trip tickets, gate pass, zumba
 
3130 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony May 13, 2024 100 May 13, 2024
 
3131 LUARDO, GLENN D. PLANNING Prepared Table & discussion for 2.3.4. and 2.3.5. (Future labor and farm inputs) for FS Padada RIS Modernization Program. May 13, 2024 100 May 13, 2024 Other accomplishment: Prepared 2 Purchased Request for the conducted activity of Planning & Design Unit (100%).
 
3132 LUARDO, GLENN D. PLANNING Prepared Chapter 3 on LARF regarding the FS Padada RIS Modernization Program. May 14, 2024 100 May 14, 2024 Other Accomplishment: Polishing prepared FS Padada RIS Modernization Program for Chapter 2 & 10 (70%).
 
3133 LUARDO, GLENN D. PLANNING Attended the technical discussion for FS Padada RIS Modernization Program together with the Planning & Design Section of NIA RIO XI. May 14, 2024 100 May 14, 2024
 
3134 LUARDO, GLENN D. PLANNING Polishing prepared FS Padada RIS Modernozation Program for Chapter 2 & 10. May 15, 2024 100 May 15, 2024 Other Accomplishment: Retrieved documents regarding the conducted Socio Economic activity @ the proposed Cogon Bacaca SRIP (100%). Prepared power point presentation for the proposed Pagan & Suawan SRIP regarding the Pre-FPIC consultation (20%).
 
3135 LUARDO, GLENN D. PLANNING Facilitate in the processing of Liquidation for the Cash Advance of the 2 activity of Planning & Design Unit regarding the proposed project in Davao occidental. May 17, 2024 80 May 17, 2024
 
3136 LUARDO, GLENN D. PLANNING Scanned documents and download to LARAP Cogon Bacaca GC in relation to the Proposed Cogon Bacaca SRIP as reference to LARAP Training Workshop. May 16, 2024 100 May 16, 2024 Other Accomplishment: Prepared power point presentation for the proposed Pagan & Suawan SRIP regarding the Pre-FPIC consultation meeting on May 22, 2024 (50%).
 
3137 LUARDO, GLENN D. PLANNING Facilitate in the processing of Liquidation for the Cash Advance of the 2 activity of Planning & Design Unit regarding the proposed project in Davao occidental. May 17, 2024 100 May 17, 2024
 
3138 LUARDO, GLENN D. PLANNING Edited 12 geotag pictures as reference for the CNC Application of 3 NIA existing project. May 17, 2024 100 May 17, 2024
 
3139 CAYABYAB, REY JIM PLANNING Prepare a communication letter re: Conduct of coordination meeting with the Obu Manuvu tribal community at Pagan and Suawan SRIP May 13, 2024 100 May 13, 2024
 
3141 CAYABYAB, REY JIM PLANNING Prepare a communication letter re: Conduct of field immersion activity at Brgy. Cogon-Bacaca for the upcoming LARF/P Training May 13, 2024 100 May 13, 2024
 
3142 CAYABYAB, REY JIM PLANNING Prepare a communication letter to NCIP re: Request to include Brgy. Cogon-Bacaca to the ADSDPP of Davao del Sur May 14, 2024 100 May 14, 2024
 
3143 CAYABYAB, REY JIM PLANNING Attend the technical discussion for Padada RIS Modernization FSR together with the Planning & Design Section of NIA RIO XI May 14, 2024 100 May 14, 2024
 
3144 CUICO, JHO-ANN A. PLANNING Prepared Padada RIS Modernization FSR compliance to the recommendation as per NIACO PPD Comments (Prepared Layout Maps base on the final Delineated Area of Expansion) - Chapter 6 May 16, 2024 100 May 16, 2024 COMPLETED
 
3145 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents May 16, 2024 100 May 16, 2024 COMPLETED
 
3146 CAYABYAB, REY JIM PLANNING Prepare Plan & Profile of Drainage H (DRH) for Padada RIS Modernization May 15, 2024 100 May 15, 2024
 
3147 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Inputed Detailes to LOG BOOK LUC Trcaker May 16, 2024 100 May 16, 2024 COMPLETED
 
3148 CAYABYAB, REY JIM PLANNING Consolidate LARF write-ups as annex for Padada RIS Modernization FSR May 15, 2024 100 May 15, 2024
 
3149 CUICO, JHO-ANN A. PLANNING Prepared Padada RIS Modernization FSR compliance to the recommendation as per NIACO PPD Comments (Prepared Layout Maps base on the final Delineated Area of Expansion) - Chapter 7,8,9 May 17, 2024 100 May 17, 2024 COMPLETED
 
3150 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents May 17, 2024 100 May 17, 2024 COMPLETED
 
3151 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Inputed Detailes to LOG BOOK LUC Trcaker May 17, 2024 100 May 17, 2024 COMPLETED
 
3152 CAYABYAB, REY JIM PLANNING Prepare Plan & Profile of Drainage M-4 (DRM-4) for Padada RIS Modernization May 15, 2024 100 May 15, 2024
 
3153 SASUMAN, MARY LOUISE J. PLANNING Prepare and consolidate final write-ups for Padada RIS modernization FSR. May 13, 2024 100 May 17, 2024 May 13-17, 2024 consolidated the final write-ups for Padada RIS modernization FSR. Other accomplishment: Attended flag raising ceremony.
 
3154 CAYABYAB, REY JIM PLANNING Prepare Plan & Profile of Drainage M-5 (DRM-5) for Padada RIS Modernization May 16, 2024 100 May 16, 2024
 
3155 CAYABYAB, REY JIM PLANNING Prepare and update well inventory for Padada RIS Modernization May 16, 2024 100 May 16, 2024
 
3156 SASUMAN, MARY LOUISE J. PLANNING Attended virtual meeting with Ro personnel relative to the finalization of Padada RIS Modernization FSR. May 14, 2024 100 May 14, 2024 Completed.
 
3157 CAYABYAB, REY JIM PLANNING Prepare Plan & Profile of Drainage DRD for Padada RIS Modernization May 30, 2024 40 May 17, 2024 Other Accomplishment: Prepare listing of FY 2024 and FY 2025 projects and Budget allocation summary of NIA-DDS IMO
 
3158 SASUMAN, MARY LOUISE J. PLANNING Prepare certification on Commercial Sand and Gravel (CSAG) May 13, 2024 100 May 13, 2024 Completed
 
3159 SASUMAN, MARY LOUISE J. PLANNING Prepared NWRB Certificate of Posting. May 13, 2024 100 May 13, 2024 Completed
 
3160 SASUMAN, MARY LOUISE J. PLANNING Entertained the client on the application of Commercial Sand and Gravel (CSAG). May 15, 2024 100 May 15, 2024 Completed.
 
3161 EUGENIO, VENANN PLANNING Attend Review and Reassessment of the Final RIMP (2023-2030) of Davao Region at RIO May 13, 2024 100 May 13, 2024
 
3162 EUGENIO, VENANN PLANNING Attend Review and Reassessment of the Final RIMP (2023-2030) of Davao Region at RIO May 14, 2024 100 May 14, 2024
 
3163 EUGENIO, VENANN PLANNING Edit Annex 5 of Davao del Sur, Davao Occidental, and District 3, Davao City PIMP; Prepare summary of GAA fund released to DDS IMO for CY 2016-2023 May 15, 2024 100 May 15, 2024 Other Accomplishments: Prepare LUC certificates; Volleyball practice
 
3167 MARTURILLAS, JOHN LLOYD PLANNING Plotting of survey data researched from DENR for survey reference. May 13, 2024 30 May 13, 2024 On-Going
 
3168 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities May 13, 2024 100 May 13, 2024 Completed
 
3169 MARTURILLAS, JOHN LLOYD PLANNING Plotting of survey data researched from DENR for survey reference. May 14, 2024 100 May 14, 2024 Completed
 
3170 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities May 14, 2024 100 May 14, 2024 Completed
 
3171 MARTURILLAS, JOHN LLOYD PLANNING Polishing of PAGAN SRIP contours. May 15, 2024 5 May 15, 2024 On-Going
 
3172 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities May 15, 2024 100 May 15, 2024 Completed
 
3173 MARTURILLAS, JOHN LLOYD PLANNING Plotting, Generating of profile and cross-section of Kitaha-Igpit May 15, 2024 100 May 15, 2024 Completed
 
3208 EUGENIO, VENANN PLANNING Preparation of Padada RIS Modernization FSR compliance to the recommendation as per NIACO PPD Comments May 17, 2024 100 May 17, 2024 May 16, 2024: Prepare and submit DTR; Prepare LUC and TOT Certifications; Assist clients/applicants for LUC and TOT
 
3209 EUGENIO, VENANN PLANNING Preparation of Padada RIS Modernization FSR compliance to the recommendation as per NIACO PPD Comments May 17, 2024 100 May 17, 2024 Other Accomplishments: Prepare LUC and TOT Certifications; Assist clients/applicants for LUC and TOT; Volleyball practice
 
3210 ESPADERA, MA LOURDES PLANNING Drafting of Template for Suawan SRIP Topo, Profile and Cross Section Map May 16, 2024 55 May 16, 2024 35% Completion on this day
 
3211 ESPADERA, MA LOURDES PLANNING Prepare pre-survey data references for Panaglib SIS and Bagumbuhay SPIP May 16, 2024 100 May 16, 2024
 
3213 ESPADERA, MA LOURDES PLANNING Drafting of Template for Suawan SRIP Topo, Profile and Cross Section Map May 17, 2024 55 May 17, 2024
 
3214 ESPADERA, MA LOURDES PLANNING Prepare pre-survey data references for Admol Spring - Asinan SPIP May 17, 2024 100 May 17, 2024
 
3215 ESPADERA, MA LOURDES PLANNING Miscellaneous: Prepare Survey Team Travel Documents May 16, 2024 100 May 16, 2024
 
3216 ESPADERA, MA LOURDES PLANNING Miscellaneous: Prepare Survey Team Travel Documents Facilitate Preparation of Meals and Accommodation for 2024 Roadshow of Siccion Marketing, Inc May 17, 2024 100 May 17, 2024 Follow Up RTK Charging Cable/ Radio/ Payroll of JO Personnel
 
3217 ESPADERA, MA LOURDES PLANNING Finalize Cogon Bacaca SRIP Map Layout for LARP May 17, 2024 100 May 17, 2024
 
3221 ESPADERA, MA LOURDES PLANNING Draft agreement re utilization of RTK May 21, 2024 100 May 24, 2024
 
3249 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring of IWRMP plantation sites and nursery visitation May 20, 2024 100 May 20, 2024 - Site visitied Brgy. Clib plantation sites (Y1 & Y2) and Brgy. Malabang plantation sites to oversee the ongoing watering activities therein. - Oversee the bagging of soil media at PRIS nursery.
 
3250 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring of IWRMP plantation sites and nursery visitation May 21, 2024 100 N/A - Monitored the plantation sites of Padada RIS. - Oversee installation of tree guards
 
3251 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring of IWRMP plantation sites and nursery visitation May 22, 2024 100 May 22, 2024 - Site monitored PRIS plantation sites in Mahayahay, Malabang, Clib, Langa-an and San Miguel plantation sites for their watering activities.
 
3252 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring of IWRMP plantation sites and nursery visitation May 23, 2024 100 May 23, 2024 - Conducted nursery visitation and monitored PRIS plantation sites. - Oversee installation of tree guards for plantation sites. - Initiated and assisted in the replanting of dead seedlings under Y2 Implementation (Brgy. Malabang).
 
3253 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring of IWRMP plantation sites and nursery visitation May 24, 2024 100 May 24, 2024 - Prepared and submitted IWRMP Progress Report (PRIS/MRIS). - Site monitored PRIS areas and facilitated site clearing/roundweeding in plantation sites. - Assisted in re-planting of the wilted seedlings under Y2 plantation.
 
3257 CUICO, JHO-ANN A. PLANNING Attended flag raising ceremony May 20, 2024 100 May 20, 2024 COMPLETED
 
3258 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents May 20, 2024 100 May 20, 2024 COMPLETED
 
3259 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Inputed Detailes to LOG BOOK LUC Trcaker May 20, 2024 100 May 20, 2024 COMPLETED
 
3260 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for CNC Application May 20, 2024 100 May 20, 2024 COMPLETED: New Silay, San Jose, New Visayas
 
3261 CUICO, JHO-ANN A. PLANNING Prepared Parcellary Map of BADAGOY CIS with tabulated Landowners Name, Area (has.), Title No. etc. (Requested by: Sir Tony for Site visit and Meeting Purposes) May 21, 2024 100 May 21, 2024 COMPLETED: This task Composed of Project location Map, General Layout Map with irrigation Facilities and Structures
 
3262 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Inputed Details to LOG BOOK LUC Trcaker May 21, 2024 100 May 21, 2024 COMPLETED
 
3263 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents May 21, 2024 100 May 21, 2024 COMPLETED
 
3264 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for PCR Attachment of PIC May 22, 2024 100 May 22, 2024 COMPLETED
 
3265 CUICO, JHO-ANN A. PLANNING Design and drafting of MAL RIS (RMC SUPPLEMENTAL: Sta.: 0+000.00 - 1+444.51) - Profiling and Plan May 22, 2024 40 May 22, 2024 COMPLETED: 100% 05-23-2024
 
3266 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents May 22, 2024 100 May 22, 2024 COMPLETED
 
3267 CUICO, JHO-ANN A. PLANNING Design and drafting of MAL RIS (RMC SUPPLEMENTAL: Sta.: 0+000.00 - 1+444.51) - Profiling and Plan May 23, 2024 100 May 23, 2024 For checking (Profiling and Plan Only)
 
3268 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for PCR Attachment of PIC May 23, 2024 100 May 23, 2024 COMPLETED
 
3269 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Inputed Details to LOG BOOK LUC Trcaker May 23, 2024 100 May 23, 2024 COMPLETED
 
3270 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents May 23, 2024 100 May 23, 2024 COMPLETED
 
3271 CUICO, JHO-ANN A. PLANNING Design and drafting of MAL RIS (RMC SUPPLEMENTAL: Sta.: 0+000.00 - 1+444.51) - Cross sectioning May 24, 2024 100 May 24, 2024 COMPLETED: for checking
 
3272 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for PCR Attachment of PIC May 24, 2024 100 May 24, 2024 COMPLETED
 
3273 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents May 24, 2024 100 May 24, 2024 COMPLETED
 
3274 EUGENIO, VENANN PLANNING Attend Technical Assistance and Workshop on the Land Acquisition & Resettlement Framework/Plan (LARF/P) May 24, 2024 100 May 24, 2024 Attended Workshop May 20-24, 2024
 
3275 MARTURILLAS, JOHN LLOYD PLANNING Plotted 9 LUC applications May 20, 2024 100 May 20, 2024 Completed
 
3276 MARTURILLAS, JOHN LLOYD PLANNING Plotted 4 LUC applications May 24, 2024 100 May 24, 2024 Completed
 
3277 MARTURILLAS, JOHN LLOYD PLANNING Attend 2024 Road Show by Siccion Marketing May 22, 2024 50 May 22, 2024 On-going
 
3278 MARTURILLAS, JOHN LLOYD PLANNING Attend 2024 Road Show by Siccion Marketing May 23, 2024 100 May 23, 2024 Completed
 
3279 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP contours May 20, 2024 10 May 20, 2024 On-going
 
3280 MARTURILLAS, JOHN LLOYD PLANNING Plotting, Generating of Profile and Cross-Section of Padada RIS MAIN CANAL STA 0+000.00 - STA 3+689.42 May 21, 2024 100 May 21, 2024 Completed
 
3281 MARTURILLAS, JOHN LLOYD PLANNING Labeling and Plotting of Padada RIS Lateral B2 May 24, 2024 100 May 24, 2024 Completed
 
3282 HERNAN, ALDEN PLANNING Attend technical assistance and workshop in the Land Acquisition and Resettlement Framework/Plan at MTC, Bolton, Davao City May 24, 2024 100 May 24, 2024 Completed
 
3283 LUARDO, GLENN D. PLANNING Prepare and submit 3 required documents as attachment for CNC application of San Jose, San Miguel and Sinawilan SIP projects of NIA DDS-IMO. May 20, 2024 100 May 20, 2024 Other accomplishment: Prepared Tables (Population and Projected Labor Force, Urea, Muriate of potash, Phosphorous, Coconut, Sugarcane, and Banana price Structure) for the proposed Bagumbayan SIP (100%).
 
3284 LUARDO, GLENN D. PLANNING Prepare power point presentation for the proposed Pagan & Suawan SRIP regarding the Pre-FPIC consultation meeting. May 21, 2024 100 May 21, 2024 Other accomplishment: Prepared Purchase Request for fuel and oil used by various activity of Planning and Design Unit (100%). Update PPMP to aligned the materials requested in Padada and Mal RIS IWRMP program (60%).
 
3285 LUARDO, GLENN D. PLANNING Conduct coordination meeting with OBU MANUVU Tribal Council regarding the proposed Pagan and Suawan SRIP project located @ Sitio Ladian, Brgy. Marilog, Marilog District, Davao City. May 22, 2024 100 May 22, 2024
 
3286 LUARDO, GLENN D. PLANNING Prepare Tables on (Production Input and Price Assumption for Coconut, Sugarcane, and Banana, Production per hectare of Coconut, Sugarcane, and Banana, and Present & Future land use) of the proposed Bagumbayan PIP project. May 23, 2024 80 May 23, 2024 Other accomplishment: Troubleshoot network connection on NIA DDS-IMO Office due to no network connection for the past 3 days (100%).
 
3287 LUARDO, GLENN D. PLANNING Prepare Back to Office Report (BTOR) for the conducted coordination meeting with OBU MANUVU tribal Committee regarding the proposed Pagan and Suawan SRIP project @ Marilog District, Davao City. May 24, 2024 70 May 24, 2024
 
3331 CAYABYAB, REY JIM PLANNING Attend technical assistance and workshop on Land Acquisition and Resettlement Framework/Plan at MTC, NIA XI Regional Office May 24, 2024 100 May 24, 2024 Completed.
 
3332 SASUMAN, MARY LOUISE J. PLANNING Attend Skills and Development Training on Geological and Geotechnical Site Investigation for the Preparation and Implementation of Irrigation Projects (1st week) May 25, 2024 100 May 25, 2024 Completed the attendance on the first-week-training on May 20-25, 2024.
 
3333 ESPADERA, MA LOURDES PLANNING Attended Siccion Marketing, Inc 2024 Roadshow - demonstration on Latest Surveying Equipment May 22, 2024 100 May 22, 2024
 
3334 ESPADERA, MA LOURDES PLANNING Attended Siccion Marketing, Inc 2024 Roadshow - demonstration on Latest Surveying Equipment May 23, 2024 100 May 23, 2024
 
3335 ESPADERA, MA LOURDES PLANNING Prepare 5 Transfer of Title Certificates May 21, 2024 100 May 24, 2024
 
3337 INTO, LEE WARREN PLANNING Finalized and printed the Detailed Engineering Plans of Mal RIS FY 2025 service roads under Improvement of Service Road - NIS Fund May 22, 2024 100 May 22, 2024 Printed and submitted to RIO
 
3338 INTO, LEE WARREN PLANNING Attend Provincial Development Council convening at Ralota Hall, Gov. Douglas Ralota Cagas Sports Complex and Business Center, Brgy. Matti, Digos City. May 24, 2024 100 May 24, 2024 Attended.
 
3339 INTO, LEE WARREN PLANNING Prepare the Detailed Engineering Plans of Padada RIS service road Along DRM-4 under Improvement of Service Road - NIS Fund May 23, 2024 90 May 23, 2024 Prepared plan and profile. On-going polishing on cross-sections. To be checked by RIO before checking.
 
3340 INTO, LEE WARREN PLANNING Prepared PERT-CPM for Padada RIS Supplemental POW - Road Surfacing May 21, 2024 100 May 21, 2024 Prepared and Provided 5 copies to programmer.
 
3343 INTO, LEE WARREN PLANNING Revised PERT-CPM of Miral SRIS supplemental POW May 20, 2024 100 May 20, 2024 Prepared and provided 5 copies to programmer. Revision due to change from concreting of canal lining to provision of HDPE.
 
3345 INTO, LEE WARREN PLANNING Costing of FSDE Funds for May 20-24, 2024 May 24, 2024 100 May 24, 2024 Completed.
 
3346 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Dakinus CY 2023 - Supplemental POW May 27, 2024 100 May 27, 2024 Prepared and provided 5 copies to programmer.
 
3360 INTO, LEE WARREN PLANNING Prepare the Detailed Engineering Plans of Padada RIS service road Lateral A to Lateral A1 under Improvement of Service Road - NIS Fund May 31, 2024 95 May 27, 2024 Completed draft. Currently being checked by RIO.
 
3366 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony May 27, 2024 100 May 27, 2024 COMPLETED
 
3367 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents May 27, 2024 100 May 27, 2024 COMPLETED
 
3368 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachments DAKINUS CIS Diversion Works (Installation of Intake Gate 1.03mx1.20mx3.65m) May 27, 2024 100 May 27, 2024 COMPLETED
 
3369 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachments PADADA RIS (SERVICE ROAD: Sta. 0+000.00 - 0+296.65) May 27, 2024 100 May 27, 2024 COMPLETED
 
3419 INTO, LEE WARREN PLANNING Prepare PERT-CPM for CARFA-SIS: construction of irrigation facilities May 30, 2024 100 May 30, 2024 Prepared and provided 5 copies to programmer.
 
3420 INTO, LEE WARREN PLANNING Prepare request letter to DPWH requesting for monthly accomplishment report regarding the construction of protection works of main dam of Padada River Irrigation System. May 29, 2024 100 May 29, 2024 Completed
 
3421 INTO, LEE WARREN PLANNING Attend virtual meeting Re: Product Presentation (Maccaferri) May 30, 2024 100 May 30, 2024 Attended
 
3422 INTO, LEE WARREN PLANNING Revise Suawan SRIP Feasibility Study Program of Works May 31, 2024 90 May 30, 2024 For checking by unit head
 
3423 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Basiawan PIP (10M) May 28, 2024 100 May 28, 2024 Prepared and provided 5 copies to programmer.
 
3424 INTO, LEE WARREN PLANNING Costing of FSDE Funds (May 27- 31, 2024) May 31, 2024 100 May 31, 2024 Completed
 
3443 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents May 28, 2024 100 May 28, 2024 COMPLETED
 
3444 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW attachment May 28, 2024 100 May 28, 2024 COMPLETED: Padada RIS (Service Roads: Going Parat Dam, Sta.:0+000.00 - 0+296.65), Location map for PCR attachment
 
3452 EUGENIO, VENANN PLANNING Revise BTOR for the conducted Project ID of the Matanao-Balabag SRIP May 28, 2024 100 May 28, 2024 May 27, 2024 : Prepared template of Planning Documents for ISO Documented Information Team; Revised BTOR for the conducted Project ID of the Matanao-Balabag SRIP; Assist clients/applicants for LUC & TOT; Volleyball practice
 
3454 EUGENIO, VENANN PLANNING Revise BTOR for the conducted Project ID of the Matanao-Balabag SRIP May 28, 2024 100 May 28, 2024 May 28, 2024 : Print and submit revised BTOR for the conducted Project ID of the Matanao-Balabag SRIP; Prepare response letter and revised project description for the Proposed FY 2025 CCAW NIS in compliance to CO; Assist clients/applicants for LUC & TOT;
 
3455 EUGENIO, VENANN PLANNING Conduct inspection for LUC application May 29, 2024 100 May 29, 2024 May 29, 2024 : Conduct inspection for LUC application within Digos City; Assist clients/applicants for LUC & TOT; Processing of LUC and TOT application documents; Volleyball practice
 
3456 EUGENIO, VENANN PLANNING Prepare TOT and LUC Certifications May 30, 2024 100 May 30, 2024 May 30, 2024 : Assist clients/applicants for LUC & TOT; Processing of LUC and TOT application documents; Volleyball practice
 
3457 EUGENIO, VENANN PLANNING Submit PDU ISO Documents Template May 31, 2024 100 May 31, 2024 May 31, 2024 : Convert PDU ISO Documents Template to PDF and submit; Assist clients/applicants for LUC & TOT; Processing of LUC and TOT application documents; Volleyball practice
 
3462 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony. May 27, 2024 100 May 27, 2024
 
3463 LUARDO, GLENN D. PLANNING Prepare Back to Office Report (BTOR) for the conducted coordination meeting with OBU MANUVU tribal Committee regarding the proposed Pagan and Suawan SRIP project @ Marilog District, Davao City. May 27, 2024 100 May 27, 2024 Other Accomplishment: Posted 3 NOA & 3 NTP for NIA Irrigation Projects (100%), Attended afternoon activities in preparation for NIA Day (100%).
 
3465 LUARDO, GLENN D. PLANNING Prepare Tables on (Economic Cost of Labor and Net Incremental Value @ Full Development) of the proposed Bagumbayan PIP project. May 28, 2024 100 May 28, 2024 Other Accomplishment: Updated PPMP to aligned the materials requested in Padada and Mal RIS IWRMP program (100%). Attended afternoon activity in preparation for NIA Day (100%).
 
3466 LUARDO, GLENN D. PLANNING Prepare Tables on (Farm Budget Present & Future and EIRR) of the proposed Bagumbayan PIP project. May 30, 2024 100 May 30, 2024 Other accomplishment: Prepared list of existing irrigation projects and consolidate layout map and submitted to Davao Occidental Provincial Assessor as reference to the requested land title/tax declaration (100%). Attended afternoon activity (100%).
 
3467 LUARDO, GLENN D. PLANNING Prepare discussion of Table (Population and Projected Labor Force, Price Structure of Urea, Muriate of potash, Phosphorous, Coconut, Sugarcane, and Banana) for the proposed Bagumbayan SIP. May 31, 2024 80 May 31, 2024 Other accomplishment: Prepared discussion of Tables (Production Input and Price Assumption for Coconut, Sugarcane, and Banana, Production per hectare of Coconut, Sugarcane, and Banana, and Present & Future land use) of the proposed Bagumbayan PIP project
 
3468 LUARDO, GLENN D. PLANNING Update discussion in Summary, Chapter 2, and 3 of the Feasibility Study Report of the proposed Bagumbayan PIP. May 31, 2024 100 May 31, 2024 Completed discussion in Summary and Chapter 2 for the FS Report of Bagumbayan PIP (100%). Attended afternoon activity in preparation for NIA Day (100%).
 
3480 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites in Padada RIS. May 27, 2024 100 May 27, 2024 Other accomplishment: - Attended flag ceremony. - Facilitate in the delivery of fertilizers for the use of Y1 & Y2 plantation sites. - Oversee watering activities in PRIS. - Oversee canal clearing and nursery propagation of collected seeds.
 
3481 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites in Padada RIS. May 28, 2024 100 May 28, 2024 Other accomplishment: - Oversee site clearing/fertilizer application in PRIS plantation sites. - Delivered 2 grasscutters and 4 knapsack sprayers for nursery usage; Delivered fertilizers for Brgy. Langa-an and San Miguel, Matanao sites.
 
3484 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites in Padada RIS. May 29, 2024 100 May 29, 2024 Other accomplishment: - Assisted in fertilizer application in PRIS plantation sites. - Facilitated delivery of water within plantation sites. - Oversee watering activities of field personnel. - Sowed vegetable seedlings for germination.
 
3485 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites in Padada RIS. May 30, 2024 100 May 30, 2024 Other accomplishment: - Arranged the seedlings remaining in plantation sites in PRIS Nursery as well as the newly emerge seedlings germinated from collected seeds. - Site identified and interviewed landowners for the plantation of additional hectares
 
3487 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites in Padada RIS. May 31, 2024 100 May 31, 2024 Other accomplishment: - Facilitated delivery of water in plantation sites of PRIS. - Collected DTRs from the field personnel. - Oversee watering activities. - Facilitated hauling of soil media to be used in the propagation within nursery.
 
3490 ENCABO, PRINCESS SHAIRA MAE PLANNING Coordination with DENR-CENRO re: plantation area for the upcoming tree planting activity. May 31, 2024 100 May 31, 2024 Coordinated and discussed with CENRO personnel their available schedule to conduct site validation of their proposed area to be planted. Other accomplishment: - Site visited PRIS/MRIS nursery for the monitoring of seedlings to be used in replanting
 
3495 CAYABYAB, REY JIM PLANNING Prepare Back to Office Report (BTOR) on the attended Technical assistance and workshop on Land Acquisition and Resettlement Framework/Plan (LARF/P) May 27, 2024 100 May 27, 2024
 
3498 CUICO, JHO-ANN A. PLANNING Prepared Layout map for Design Plan Attachment of PADADA RIS - Service Roads $ MAL RIS - Service Roads (FY 2025) May 28, 2024 100 May 28, 2024 COMPLETED
 
3499 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Inputed Details to LOG BOOK LUC Tracker May 29, 2024 100 May 29, 2024 COMPLETED
 
3500 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents May 29, 2024 100 May 29, 2024 COMPLETED
 
3501 CUICO, JHO-ANN A. PLANNING Design and drafting of (PADADA RIS_Lateral B4_ Sta.: 0+000.00 - 3+322.10) - Profiling Plan only May 29, 2024 50 May 29, 2024
 
3502 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for Supplemental POW Attachments of CARFA SIS (Canalization Works: Sta.: 2+157.45 - 2+165.54) - CY 2023 - Php. 21,854.01 May 29, 2024 100 May 29, 2024 COMPLETED
 
3503 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents May 30, 2024 100 May 30, 2024 COMPLETED
 
3504 CUICO, JHO-ANN A. PLANNING Design and drafting of (PADADA RIS_Lateral B4_ Sta.: 0+000.00 - 3+322.10) - Profiling Plan only May 30, 2024 75 May 30, 2024
 
3505 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP contours May 27, 2024 12 May 27, 2024 On-going *Attended Mr. and Ms. NIA pageant elimination at NIA RIO XI
 
3506 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP contours May 28, 2024 20 May 28, 2024 *On-going
 
3507 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP contours May 29, 2024 25 May 29, 2024 *On-going
 
3508 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP contours May 30, 2024 30 May 30, 2024 *On-going
 
3509 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP contours May 31, 2024 35 May 31, 2024 *On-going
 
3510 MARTURILLAS, JOHN LLOYD PLANNING Plotted 1 LUC applications May 29, 2024 100 May 29, 2024 Completed
 
3511 MARTURILLAS, JOHN LLOYD PLANNING Plotted 2 LUC applications May 30, 2024 100 May 30, 2024 Completed
 
3512 MARTURILLAS, JOHN LLOYD PLANNING Plotted 1 LUC applications May 31, 2024 100 May 31, 2024 Completed
 
3513 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for Basiawan PIP - HDPE Pipe Alignment and Solar Electro-Mechanical Works (Reservoir Tank 1), Installation HDPE Pipe Structures (CY 2024 - Php. 3,910,000.00) May 30, 2024 100 May 30, 2024 COMPLETED
 
3514 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Inputed Details to LOG BOOK LUC Tracker May 31, 2024 100 May 31, 2024 COMPLETED
 
3515 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents May 31, 2024 100 May 31, 2024 COMPLETED
 
3516 CAYABYAB, REY JIM PLANNING Prepare revised Program of Works for San Jose PIP June 7, 2024 75 May 29, 2024 May 28, 2024 - Prepared volume computation. May 29, 2024 - Accomplished 75% of POW preparation. Lacking RFQ to be used as unit cost of selected materials.
 
3517 CUICO, JHO-ANN A. PLANNING Design and drafting of (PADADA RIS_Lateral B4_ Sta.: 0+000.00 - 3+322.10) - Profiling Plan only May 31, 2024 90 May 31, 2024
 
3518 CUICO, JHO-ANN A. PLANNING Design and drafting of (PADADA RIS_Lateral B4_ Sta.: 0+000.00 - 3+322.10) - Cross Sectioning May 31, 2024 90 May 31, 2024
 
3520 CAYABYAB, REY JIM PLANNING Draft a letter to RIO re: Request for the final canal alignment of Cogon-Bacaca SRIP May 30, 2024 100 May 30, 2024
 
3521 CAYABYAB, REY JIM PLANNING Prepare revised Land Acquisition and Resettlement Framework (LARF) of Padada Modernization FSR May 30, 2024 100 May 30, 2024
 
3522 CAYABYAB, REY JIM PLANNING Prepare Bagumbayan PIP FSR detailed cost estimate. May 31, 2024 100 May 31, 2024 Other accomplishment: Finalized list of figures and prepare transmittal of Padada RIS Modernization FSR for hard copy submission to RIO.
 
3523 CAYABYAB, REY JIM PLANNING Prepare Bagumbayan PIP FSR implementation schedule. May 31, 2024 100 May 31, 2024
 
3524 SASUMAN, MARY LOUISE J. PLANNING Attend Skills and Development Training on Geological and Geotechnical Site Investigation for the Preparation and Implementation of Irrigation Projects (2nd week) May 31, 2024 100 May 31, 2024 Attended and completed the 2-week seminar for NIA Geologists.
 
3525 ESPADERA, MA LOURDES PLANNING Prepared Documents for LUC Application (3 Titles) May 27, 2024 100 May 27, 2024
 
3526 ESPADERA, MA LOURDES PLANNING Plotted San Isidro CIS FY 2025 May 28, 2024 100 May 28, 2024
 
3527 ESPADERA, MA LOURDES PLANNING Drafted BTOR on Siccion Marketing, Inc. 2024 Roadshow May 29, 2024 100 May 29, 2024
 
3529 ESPADERA, MA LOURDES PLANNING Checked/ Replotted survey data of San Jose SIP FY 2025 May 27, 2024 100 May 27, 2024
 
3531 ESPADERA, MA LOURDES PLANNING Prepare Pre-survey data references for PRIS CY 2024 Additional May 29, 2024 100 May 29, 2024
 
3533 ESPADERA, MA LOURDES PLANNING Prepared Documents for LUC Application (2 Titles) May 29, 2024 100 May 29, 2024
 
3534 ESPADERA, MA LOURDES PLANNING Prepare Requisition Slip for Survey Team Tools and Accessories May 30, 2024 100 May 30, 2024
 
3535 ESPADERA, MA LOURDES PLANNING Prepare Pre-survey data references for Mal RIS CY 2024 Additional (SFIAM) May 30, 2024 100 May 30, 2024
 
3536 ESPADERA, MA LOURDES PLANNING Checked/ Submitted plotted data of FY 2025 Projects (Blucon-Albatana CIS and Balasiao CIS) May 30, 2024 100 May 30, 2024
 
3537 ESPADERA, MA LOURDES PLANNING Prepare Requisition Slip for Calibration of Surveying Instruments May 31, 2024 100 May 31, 2024
 
3538 ESPADERA, MA LOURDES PLANNING Prepare Pre-survey data references for Mal RIS CY 2024 Additional (LARAL) May 31, 2024 100 May 31, 2024
 
3539 ESPADERA, MA LOURDES PLANNING Drafted Communication Letter for Suawan SRIP Surveying Activity May 31, 2024 100 May 31, 2024
 
3540 ESPADERA, MA LOURDES PLANNING Prepare Response Letter regarding TOT Application of Gino De Guia May 31, 2024 100 May 31, 2024
 
3541 ESPADERA, MA LOURDES PLANNING Updated Surveying and Plottting Activities Status as of May 30, 2024 May 30, 2024 100 May 30, 2024
 
3542 HERNAN, ALDEN PLANNING Design of Irrigation canal and canal structures of Cogon Bacaca SRIP at lateral B1 May 31, 2024 60 May 31, 2024 Ongoing: Design of Irrigation Canal Structures: inverted siphons, drops, insertion: Participate celebration of NIAESP (05/29/24)
 
3543 ESPADERA, MA LOURDES PLANNING Checked TEV of Survey Team May 29, 2024 100 May 29, 2024
 
3544 INTO, LEE WARREN PLANNING Assted in printing the Padada RIS Modernzation Annexes May 31, 2024 100 May 31, 2024 Completed.
 
3545 ESPADERA, MA LOURDES PLANNING Prepare Map Layout reflecting Projects within brgy Tamugan as per request if Maam Lei May 28, 2024 100 May 28, 2024
 
3583 CAYABYAB, REY JIM PLANNING Letter on DA, DENR AND BIR RE REQUEST OF ZONIN VALUES AND CROP VALUES June 5, 2024 100 June 5, 2024 Attended morning and afternoon activity in preparation of NIA Day.
 
3584 MARTURILLAS, JOHN LLOYD PLANNING REV PAGAN SURVEY REPORT AS PER CONSULTANTS COMMMENTS June 7, 2024 100 June 7, 2024 SUBMITTED TO RIO XI
 
3587 EUGENIO, VENANN PLANNING RIMP POWERPOINT PRESETATION ON DAVAO DEL SUR June 7, 2024 90 N/A June 5-7 ; 90% - Prepare PIMP Presentation for Davao del Sur; Waiting for IDU Data. Other Accomplishments: Prepare LUC and TOT Certifications and assist clients; Prepare layout maps for LUC attachment; Volleyball practice
 
3588 EUGENIO, VENANN PLANNING PIMP PRESENTATION PPT - PROVINCE OF DAVAO OCCIDENTAL June 12, 2024 100 June 10, 2024 Other Accomplishments for June 10-11: Prepare PIMP Presentation for District 3, Davao City; Prepare certifications for TOT; Assist clients/applicants for TOT; Volleyball practice
 
3589 EUGENIO, VENANN PLANNING PIMP PRESENTATION ON PPT- PROVINCE OF DAVAO OCCIDENTAL June 14, 2024 100 June 11, 2024 Other Accomplishments for June 13-14: Edit shapefiles of Miral SRIS Canal under IMT Contract as per O&M Comment; Edit back-to-office report and attachment; Assist clients/applicants for TOT; Volleyball practice
 
3590 SASUMAN, MARY LOUISE J. PLANNING BTOR ON 2 WEEKS GEOLOGY/GEOTECHNICAL SEMINAR AT REGION 6 June 5, 2024 100 June 5, 2024 Completed and submitted BTOR on the Skills and Development Training on Geological and Geotechnical Site Investigation for the Preparation and Implementation of Irrigation Projects.
 
3593 INTO, LEE WARREN PLANNING REVISED FS POW ON FY 2022 SUAWAN SRIP June 7, 2024 100 May 6, 2024 Printed and furnished 3 copies.
 
3594 CAYABYAB, REY JIM PLANNING Response letter on the resolution from obu Manuvu June 6, 2024 100 June 6, 2024
 
3604 ESPADERA, MA LOURDES PLANNING Plotting on MAL RIS SPIAM AND LARAL DAM PROTECTION DIKE June 7, 2024 100 June 10, 2024 SFIAM Completed
 
3619 INTO, LEE WARREN PLANNING Prepare Spring Ladian - Small Irrigation Project Feasibility Study POW May 7, 2024 75 June 5, 2024 Finalized draft POW, for checking by Unit head.
 
3620 INTO, LEE WARREN PLANNING Prepare Revised FS POW of PAGAN SRIP CY2022 June 7, 2024 90 June 5, 2024 Finalized Draft, for checking by Unit Head.
 
3636 INTO, LEE WARREN PLANNING Costing of FSDE Funds (June 3 to June 7) June 7, 2024 100 June 7, 2024 Completed.
 
3637 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Padada RIS under additional fund. "Construction of Protection Dike at upstream left side of Padada RIS Main Dam." June 6, 2024 100 June 6, 2024 Prepared and Provided 6 copies to programmer.
 
3666 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony June 3, 2024 100 June 3, 2024 COMPLETED
 
3667 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents June 3, 2024 100 June 3, 2024 COMPLETED
 
3668 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Input Details to LOG BOOK LUC Tracker June 3, 2024 100 June 3, 2024 COMPLETED
 
3669 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for Proposed Test Pit and Proposed Aggregate source of COGON BACACA SRIP June 3, 2024 100 June 3, 2024 COMPLETED
 
3672 ENCABO, PRINCESS SHAIRA MAE PLANNING Check DTRs and prepare payrolls for IWRMP field personnel of Padada and Mal RIS. June 3, 2024 100 June 3, 2024 Checked DTRs and prepared payrolls of field personnel.
 
3673 ENCABO, PRINCESS SHAIRA MAE PLANNING Lay-out map revision for the monitoring of plantation sites in PRIS/MRIS. June 3, 2024 100 June 3, 2024 Revised the lay-out maps for easy monitoring on plantation sites. Other accomplishment: Attended flag ceremony.
 
3674 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and nursery visitation. June 4, 2024 100 June 4, 2024 - Conducted site monitoring in Y1/Y2 plantation sites. Other accomplishment: - Pre-germinated cacao seeds; Sowed mango and vegetable seeds in PRIS nursery.- Revised requested letter for the nursery personnel in PRIS/MRIS.
 
3675 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and nursery visitation. June 5, 2024 100 June 5, 2024 Completed. Other accomplishments: - Conduct joint inspection with DENR-CENRO personnel re: identification of tree planting sites at Dongan Pekong, Matanao. - Site monitoring at Brgy. Langa-an & San Miguel
 
3676 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and nursery visitation. June 6, 2024 100 June 6, 2024 Completed monitoring and inventory under Y1 plantation. Other accomplishment: - Pre-germinated of collected cacao & santol seeds.
 
3677 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and nursery visitation. June 7, 2024 100 June 7, 2024 - Site monitored and inventoried seedlings under Y2 plantation. - Round weeding at some plantation sites - Nursery maintenance (Periphery cleaning, soil bagging, sowing of vegetables, arranging of seedlings)
 
3678 EUGENIO, VENANN PLANNING Prepare BTORs for the conducted inspection on road widening affected canals at San Jose SIP and Padada RIS June 4, 2024 100 June 4, 2024 June 3-4: Prepare BTORs for the conducted inspection on road widening affected canals at San Jose SIP and Padada RIS. Other Accomplishments: Prepare and submit DTR; Costing of Vouchers; Assist clients for TOT; Volleyball practice
 
3683 SASUMAN, MARY LOUISE J. PLANNING Prepare DTR and WAR for the period of May 16-31, 2024. June 3, 2024 100 June 3, 2024 Completed and submitted.
 
3684 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony. June 3, 2024 100 June 3, 2024 Completed.
 
3685 SASUMAN, MARY LOUISE J. PLANNING Communicate with RIO Geologist for the proposed aggregates source for Cogon Bacaca SRIP. June 3, 2024 100 June 3, 2024 Completed.
 
3686 SASUMAN, MARY LOUISE J. PLANNING Communicate with RIO personnel for the update on the comments for PRIS Modernization FSR. June 3, 2024 100 June 3, 2024 Completed.
 
3687 SASUMAN, MARY LOUISE J. PLANNING Compute Peak Ground Acceleration (PGA) for PRIS Modernization FSR as comment from RIO Geologist June 3, 2024 80 June 4, 2024 Prepared an initial computation on PGA.
 
3688 SASUMAN, MARY LOUISE J. PLANNING Prepare BTOR on the attended seminar on Skills and Development Training on Geological and Geotechnical Site Investigation for the Preparation and Implementation of Irrigation Projects at NIA RVI June 4, 2024 100 June 4, 2024 Completed.
 
3689 SASUMAN, MARY LOUISE J. PLANNING Prepare and submit Minutes of the Meeting, ISO Workplan, photo documentation and other related documents for the ISO Training and Education Team Accomplishment Report. June 5, 2024 100 June 5, 2024 Completed.
 
3690 SASUMAN, MARY LOUISE J. PLANNING Finalize ISO Training and Education Team Accomplishment Report June 6, 2024 100 June 6, 2024 Completed.
 
3691 SASUMAN, MARY LOUISE J. PLANNING Conduct re-echo to other PDU personnel relative to the attended training on the skills and development for NIA Geologists June 6, 2024 100 June 6, 2024 Completed.
 
3692 SASUMAN, MARY LOUISE J. PLANNING Entertained Commercial Sand and Gravel (CSAG) Applicant. June 6, 2024 100 June 6, 2024 Completed.
 
3694 SASUMAN, MARY LOUISE J. PLANNING Conduct field investigation on the CSAG application in Brgy. Goma, Digos City. June 7, 2024 100 June 7, 2024 Completed.
 
3695 SASUMAN, MARY LOUISE J. PLANNING Plot the applied CSAG area and prepare certification for Commercial Sand and Gravel (CSAG) June 7, 2024 100 June 7, 2024 Completed.
 
3696 SASUMAN, MARY LOUISE J. PLANNING Continue the preparation on Bagumbayan SPIP FSR. June 7, 2024 40 June 7, 2024 On-going preparation of the FSR.
 
3708 LUARDO, GLENN D. PLANNING Update discussion in Summary, Chapter 2, and 3 of the Feasibility Study Report of the proposed Bagumbayan PIP. June 3, 2024 100 June 3, 2024 Other Accomplishment: Updated discussion on Chapter 4 of the Feasibility Study Report of the proposed Bagumbayan PIP (100%), Attended afternoon activity (100%).
 
3709 LUARDO, GLENN D. PLANNING Prepare General Layout Map for the proposed Tacul Laya PIP in preparation for Feasibility Study Report. June 4, 2024 100 June 4, 2024 Other Accomplishment: Prepared Layout Map of Tacul Laya based on Other Government Agency (OGA) project (e.i. D.A.) inventory report (100%), Attended afternoon Activity (100%).
 
3710 LUARDO, GLENN D. PLANNING Consolidate and update Shape files data of existing irrigation systems and proposed projects of NIA DDS-IMO in the Municipality of Kiblawan. June 5, 2024 100 June 5, 2024 Other Accomplishments: Attended Morning and Afternoon Activity in preparation for NIA Day (100%).
 
3711 LUARDO, GLENN D. PLANNING Prepare Layout Map for Land Use (Present & Future) of the proposed Bagumbayan PIP Project. June 6, 2024 100 June 6, 2024 Other Accomplishment: Troubleshoot 1 unit printer and install necessary program of 1 unit computer (100%), Attended afternoon activity (100%).
 
3712 LUARDO, GLENN D. PLANNING Prepare and submit proposal for the conduct of FPIC of the proposed Kisulan SPIP Project. June 7, 2024 90 June 7, 2024 Other accomplishment: Prepared Work and Financial Plan for the conduct of FPIC of the proposed Kisulan SPIP Project (100%), Attended Morning and Afternoon Activity (100%).
 
3713 CAYABYAB, REY JIM PLANNING Prepare draft powerpoint presentation on Miral SRIS June 3, 2024 100 June 3, 2024 Attend afternoon activity in preparation of the upcoming NIA Day.
 
3714 CAYABYAB, REY JIM PLANNING Prepare LARF of Bagumbayan PIP FSR June 4, 2024 100 June 4, 2024 June 3, 2024 - Accomplished 70%. June 4, 2024 - Completed.
 
3716 CAYABYAB, REY JIM PLANNING Update write-ups on Chapter 8 of Bagumbayan PIP FSR June 4, 2024 100 June 4, 2024 Attended afternoon activity in preparation of the upcoming NIA Day.
 
3717 CAYABYAB, REY JIM PLANNING Update write-ups on Chapter 5.2 of Bagumbayan PIP FSR June 6, 2024 100 June 6, 2024 Attended afternoon activity in preparation of the upcoming NIA Day.
 
3718 CAYABYAB, REY JIM PLANNING Prepare initial write-ups on Executive Summary and Chapter 1 of LARP of Cogon-Bacaca SRIP June 7, 2024 100 June 7, 2024 Attended morning and afternoon activity in preparation of the upcoming NIA Day.
 
3719 HERNAN, ALDEN PLANNING Design of Cogon Bacaca Lateral B1 canal and canal structures (sta. 0+000.00 - 2+141.4) June 6, 2024 100 June 6, 2024 for checking
 
3720 HERNAN, ALDEN PLANNING Practice Modern Dance for NIA anniversary, liquidate TEV, In cash TEV at landbank-Digos June 7, 2024 100 June 7, 2024 completed
 
3721 INTO, LEE WARREN PLANNING Revise FS POW of Padada RIS Modernization CY2023 June 10, 2024 80 June 10, 2024 Finalized draft. For checking by supervisor.
 
3722 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents June 4, 2024 100 June 4, 2024 COMPLETED
 
3723 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Input Details to LOG BOOK LUC Tracker June 4, 2024 100 June 4, 2024 COMPLETED
 
3724 CUICO, JHO-ANN A. PLANNING Design and drafting of (PADADA RIS_Lateral B4_ Sta.: 0+000.00 - 3+322.10) - Profiling June 4, 2024 100 June 4, 2024 for checking of Maam Athena
 
3725 CUICO, JHO-ANN A. PLANNING Practice Volleyball (Preparation for NIA DAY Celebration) - 3-5pm June 4, 2024 100 June 4, 2024
 
3726 CUICO, JHO-ANN A. PLANNING Design and drafting of (PADADA RIS_Lateral B4_ Sta.: 0+000.00 - 3+322.10) - Cross Sectioning June 5, 2024 100 June 5, 2024 for checking of Maam Athena
 
3727 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents June 5, 2024 100 June 5, 2024 COMPLETED
 
3728 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachment June 5, 2024 100 June 5, 2024 COMPLETED
 
3729 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for PCR attachment June 5, 2024 100 June 5, 2024 COMPLETED
 
3730 CUICO, JHO-ANN A. PLANNING Practice Volleyball (Preparation for NIA DAY Celebration) - 3-5pm June 5, 2024 100 June 5, 2024
 
3731 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents June 6, 2024 100 June 6, 2024 COMPLETED
 
3732 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachment June 6, 2024 100 June 6, 2024 COMPLETED
 
3733 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for PCR attachment June 6, 2024 100 June 6, 2024 COMPLETED
 
3734 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for Little Baguio II and Little Baguio I for Site Visit Purposes Requested by: IDU TEAM June 6, 2024 100 June 6, 2024 COMPLETED
 
3735 CUICO, JHO-ANN A. PLANNING Practice Volleyball (Preparation for NIA DAY Celebration) - 3-5pm June 6, 2024 100 June 6, 2024 COMPLETED
 
3736 CUICO, JHO-ANN A. PLANNING Practice MODERN DANCE (Preparation for NIA DAY CELEBRATION 9am - 12nn) June 7, 2024 100 June 7, 2024
 
3737 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachment June 7, 2024 100 June 7, 2024 COMPLETED
 
3738 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents June 7, 2024 100 June 7, 2024 COMPLETED
 
3739 CUICO, JHO-ANN A. PLANNING Prepared Layout maps for Revised FS attachment June 7, 2024 100 June 7, 2024 COMPLETED
 
3740 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony June 10, 2024 100 June 10, 2024
 
3741 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents June 10, 2024 100 June 10, 2024 COMPLETE
 
3742 ESPADERA, MA LOURDES PLANNING Conduct Field Verification For 2 Land Use Conversion Application at Malagos, Baguio District June 5, 2024 100 June 5, 2024
 
3743 ESPADERA, MA LOURDES PLANNING Conduct Field Verification For 1 Land Use Conversion Application at Mahayahay, Digos June 5, 2024 100 June 4, 2024
 
3744 ESPADERA, MA LOURDES PLANNING Prepare Pre-survey data references for Badagoy CIS FY 2025 June 5, 2024 100 June 5, 2024
 
3745 ESPADERA, MA LOURDES PLANNING Prepare 1 LUC Application Documents June 5, 2024 100 June 4, 2024
 
3746 ESPADERA, MA LOURDES PLANNING Prepare 2 LUC Appplication Documents June 6, 2024 100 June 5, 2024
 
3747 ESPADERA, MA LOURDES PLANNING Prepare Pre-survey data references for San Jose SIP June 6, 2024 100 June 6, 2024
 
3748 ESPADERA, MA LOURDES PLANNING Checked Plotted Data of New Katipunan PIP and PRIS CY 2024 Additional at Main Dam US June 4, 2024 100 June 4, 2024
 
3749 ESPADERA, MA LOURDES PLANNING Prepare 1 LUC Application Document June 6, 2024 70 June 6, 2024 No geotag and IA Certificate submitted yet
 
3750 ESPADERA, MA LOURDES PLANNING Facilitate the preparation needed for Surveying Activity at Suawan SRIP next week June 7, 2024 100 June 7, 2024
 
3751 ESPADERA, MA LOURDES PLANNING Drafted IA certificates format to fast track releasing of IA Cert from IA June 7, 2024 100 June 7, 2024
 
3790 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. June 10, 2024 100 June 10, 2024 Conducted plantation monitoring in Brgy. Mahayahay and Clib. Other accomplishment: - Attended flag raising ceremony. - Inventory of seedlings. - Round weeding on some seedlings. - Nursery visitation
 
3791 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. June 11, 2024 100 June 11, 2024 Monitored plantation sites in PRIS located at Brgy. Clib Damsite and Malabang, Hagonoy. Other accomplishment: - Inventory of seedlings. - Round weeding on some seedlings. - Nursery visitation (Arranged newly emerge seedlings).
 
3795 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare pertinent documents for the upcoming NIA Tree Planting Activity. June 13, 2024 100 June 13, 2024 - Prepared communication letters for Brgy. Dongan Pekong, LGU Matanao, MENRO Matanao and CENRO-Davao del Sur. - Processed appointment of the renewed field personnel for PRIS.
 
3796 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare and submit Year 3 POW of RPWRSIS for PRIS and Mal RIS. June 13, 2024 100 June 13, 2024 Completed. Checked by unit head, submitted initial soft copy to RIO personnel.
 
3797 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection at PRIS plantation sites. June 14, 2024 100 June 14, 2024 Completed. Other Accomplishments: - Printed 4 copies of Y3 POW for PRIS and MRIS. - Checked DTRs and prepared payrolls for field workers of PRIS and MRIS.
 
3798 CUICO, JHO-ANN A. PLANNING Practice Volleyball (Preparation for NIA DAY Celebration) - 3-5pm June 10, 2024 100 June 10, 2024
 
3799 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps of Bagumbayan PIP for Feasibility Study (FS) attachment June 10, 2024 100 June 10, 2024 COMPLETED: General Layout Map, Administrative Map, Drainage Area Map, Location Map (100%)
 
3800 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents June 11, 2024 100 June 10, 2024 COMPLETED
 
3801 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps of Bagumbayan PIP for Feasibility Study (FS) attachment June 11, 2024 100 June 11, 2024 COMPLETED: Topographic Map, Land Use Map (Future), Land use Map (Present) - 100%
 
3802 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachment June 11, 2024 100 June 11, 2024 COMPLETED
 
3807 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents June 13, 2024 100 June 13, 2024 COMPLETED
 
3808 CUICO, JHO-ANN A. PLANNING Practice MODERN DANCE (Preparation for NIA DAY CELEBRATION 9am - 12nn) June 13, 2024 100 June 13, 2024 COMPLETED
 
3809 CUICO, JHO-ANN A. PLANNING Practice Volleyball (Preparation for NIA DAY Celebration) - 3-5pm June 13, 2024 100 June 13, 2024
 
3810 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW, PCR Attachment June 13, 2024 100 June 13, 2024 COMPLETED
 
3811 INTO, LEE WARREN PLANNING Worked on the Detailed Engineering Design of Mal RIS SFIAM Protection Works Upstream June 14, 2024 40 June 14, 2024 Prepared template. Drafted design Profile of Pile capping, Riverbed and Top Berm of protection dike. Drafted Cross-Sections up to Sta 0+200.00
 
3812 INTO, LEE WARREN PLANNING Prepare a Three-Year Rolling Infrastructure Projects for CY 2026-2028 June 14, 2024 95 May 13, 2024 Prepared draft for checking by supervisor.
 
3814 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Kilolog CIS: Rehabilitation of Diversion Dam & Construction of 150.00 meters protection dike at Upstream & Downstream of the dam. June 14, 2024 100 June 11, 2024 Completed
 
3818 INTO, LEE WARREN PLANNING Printing 3 copies of checked PAGAN SRIP Feasibility Study Revised POW CY 2022. For Signing June 14, 2024 98 June 10, 2024 Sign by prepared and Unit head. To be signed by Section Head and Division Manager.
 
3820 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW Attachment June 14, 2024 100 June 14, 2024 COMPLETED
 
3821 CUICO, JHO-ANN A. PLANNING Design and drafting of FY 2025 (PADADA RIS_Lateral B) - Profiling June 14, 2024 20 June 14, 2024
 
3822 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents June 14, 2024 100 June 14, 2024 COMPLETED
 
3823 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps of Bagumbayan PIP for Feasibility Study (FS) attachment June 14, 2024 100 June 14, 2024 COMPLETED: Climate Map, Land Cover Map, Land Clssification Map (100%)
 
3840 INTO, LEE WARREN PLANNING Final Printing of Padada RIS Service Roads FY 2025 June 14, 2024 100 June 14, 2024 Completed with Transmittal
 
3855 LUARDO, GLENN D. PLANNING Prepare Project Development Department (PDD) Form 1 of the proposed Bagumbayan PIP June 10, 2024 100 June 10, 2024 Other Accomplishments; Prepared and submited proposal for the conduct of FPIC of the proposed Kisulan SPIP Project (100%), Attended afternoon NIA Activity (100%).
 
3856 LUARDO, GLENN D. PLANNING Prepare Powerpoint presentation for the conduct of Free and Prior Informed Consent (FPIC) of the proposed Kisulan SPIP Project. June 11, 2024 100 June 11, 2024 Other Accomplishments; Prepared documents and Posting 3 NOA and NTP for the proposed NIA Projects (100%), Attended morning and afternoon NIA Activity (100%).
 
3857 LUARDO, GLENN D. PLANNING Conduct Free and Prior Informed Consent (FPIC) of the Proposed Kisulan SPIP Project @ Municipal Tribal Council (MTC), Brgy. Poblacion, Kiblawan, Davao del Sur. June 13, 2024 100 June 13, 2024 Other Accomplishment; Attended Morning and Afternoon NIA Activity (100%).
 
3858 LUARDO, GLENN D. PLANNING Attend 2nd Quarter Meeting of PDRRMC @ Gov. Douglas Ra. Cagas Sport Complex, Brgy. Matti, Digos City. June 14, 2024 100 N/A Other Accomplishments; Finalizing FS Report of the proposed Bagumbayan PIP (100%), Prepared 1 PR for NIA DDS-IMO personnel (100%), Submitted lacking documents for CNC application of Bolobolo SIP, Basiawan SPIP, and San Jose SIP (100%), Attended afternoon
 
3859 SASUMAN, MARY LOUISE J. PLANNING Prepare the revised write-ups for Geology Chapter of Bagumbayan SPIP FSR. June 10, 2024 100 June 10, 2024 Completed.
 
3860 SASUMAN, MARY LOUISE J. PLANNING Consolidate all chapters of Bagumbayan SPIP FSR June 10, 2024 80 June 10, 2024 On-going consolidation.
 
3861 SASUMAN, MARY LOUISE J. PLANNING Attended flag raising ceremony. June 10, 2024 100 June 10, 2024 Completed.
 
3862 SASUMAN, MARY LOUISE J. PLANNING Field investigation and conduct discharge measurement of the proposed SPIP: Bagumbayan SPIP, New Sibonga SPIP, New Katipunan SPIP and Lower Marber SPIP June 11, 2024 100 June 11, 2024 Completed.
 
3863 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter re: Application for a Government Gratuitous Permit in the Upstream Part Of Padada River Irrigation System (RIS) June 13, 2024 100 June 13, 2024 Completed. For checking.
 
3864 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter re: Urgent Request to Expedite the Restoration of Internet Service at NIADavao Del Sur IMO June 13, 2024 100 June 13, 2024 Completed. For checking.
 
3865 SASUMAN, MARY LOUISE J. PLANNING Entertain and release CSAG Certification June 13, 2024 100 June 13, 2024 Completed.
 
3866 SASUMAN, MARY LOUISE J. PLANNING Prepare the revised write-ups for Environmental and Social Assessment Chapter of Bagumbayan SPIP FSR. June 13, 2024 100 June 13, 2024 Completed.
 
3867 SASUMAN, MARY LOUISE J. PLANNING Prepare DTR and WAR for the period of June 1-15, 2024 June 14, 2024 100 June 14, 2024 Completed.
 
3868 SASUMAN, MARY LOUISE J. PLANNING Finalize and organize Tables and Figures for Bagumbayan SPIP FSR June 14, 2024 95 June 14, 2024 FSR for printing.
 
3869 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Badagoy CIS 2025 project supplementary canal 2+222.29m, lateral b3 1+109.31 June 10, 2024 100 June 10, 2024 Completed
 
3870 MARTURILLAS, JOHN LLOYD PLANNING Labeling of plan of Badagoy CIS 2025 project supplementary canal 2+222.29m, lateral b3 1+109.31 June 10, 2024 100 June 10, 2024 Completed
 
3871 CAYABYAB, REY JIM PLANNING Draft a letter to Brgy. Balabag re: Recommendations on the conducted project identification at Matanao-Balabag SRIP June 10, 2024 100 June 10, 2024
 
3872 MARTURILLAS, JOHN LLOYD PLANNING Generating Profile and Cross-section of Badagoy CIS 2025 project supplementary canal 2+222.29m, lateral b3 1+109.31 June 11, 2024 100 June 11, 2024 Completed
 
3873 MARTURILLAS, JOHN LLOYD PLANNING Labeling of Profile of Badagoy CIS 2025 project supplementary canal 2+222.29m, lateral b3 1+109.31 June 11, 2024 100 June 11, 2024 Completed
 
3874 CAYABYAB, REY JIM PLANNING Prepare initial write-ups on Chapter 4 of Cogon-Bacaca SRIP LARP June 10, 2024 100 June 10, 2024 Attended Modern Dance practice and Volleyball practice in preparation of the upcoming NIA Day
 
3875 CAYABYAB, REY JIM PLANNING Prepare initial write-ups on Chapter 5, 6, 7, 8, and 9 of Cogon-Bacaca SRIP LARP June 11, 2024 100 June 11, 2024 Attended Volleyball practice in preparation of the upcoming NIA Day
 
3876 CAYABYAB, REY JIM PLANNING Prepare draft letter to Sta. Maria Municipal Mayor re: Invitation for the upcoming NIA Day celebration June 13, 2024 100 June 13, 2024 Attended Modern Dance practice and Volleyball practice in preparation of the upcoming NIA Day
 
3877 CAYABYAB, REY JIM PLANNING Update Drainage Canal Existing Structures Inventory of Padada RIS for O&M June 14, 2024 100 June 14, 2024 Attended Volleyball practice in preparation of the upcoming NIA Day
 
3885 ESPADERA, MA LOURDES PLANNING Attend Flag Ceremony June 10, 2024 100 June 10, 2024
 
3886 ESPADERA, MA LOURDES PLANNING Plotted Mal RIS - SFIAM CY 2024 Additional June 10, 2024 100 June 10, 2024
 
3888 ESPADERA, MA LOURDES PLANNING Follow up and Prepare CBSRIP MC KMZ File June 10, 2024 100 June 10, 2024
 
3889 ESPADERA, MA LOURDES PLANNING Plotted San Jose SIP Topographic Map June 11, 2024 100 June 11, 2024
 
3894 ESPADERA, MA LOURDES PLANNING Finalize KMZ Data for Suawan SRIP Control Points June 13, 2024 100 June 13, 2024
 
3918 ESPADERA, MA LOURDES PLANNING Follow-up request for Calibration of Surveying Equipment June 13, 2024 100 June 13, 2024
 
3919 ESPADERA, MA LOURDES PLANNING Monitoring of CBSRIP Survey Data and Revised the Topographic Map June 13, 2024 100 June 21, 2024 Completed and Submitted by JRM last June 21, 2024
 
3920 ESPADERA, MA LOURDES PLANNING Prepare DTR and WAR June 14, 2024 100 June 14, 2024
 
3921 ESPADERA, MA LOURDES PLANNING Checked 5 Plotted Survey Data June 14, 2024 100 June 14, 2024
 
3922 ESPADERA, MA LOURDES PLANNING Drafted Communication Letter for Parcellary Surveys June 14, 2024 100 June 14, 2024
 
3923 ESPADERA, MA LOURDES PLANNING Facilitate Transfer of Materials for Suawan Activities next week June 14, 2024 100 June 14, 2024
 
3924 ESPADERA, MA LOURDES PLANNING Prepare Survey Team Travel Documents June 14, 2024 100 June 14, 2024
 
3925 ESPADERA, MA LOURDES PLANNING Submit Revised Topographic Map at Cogon Bacaca SRIP June 21, 2024 100 June 21, 2024 Completed and Submitted by JRM last June 21, 2024
 
3926 ESPADERA, MA LOURDES PLANNING Finalize Mal RIS - Laral Dam CY 2024 Additional June 14, 2024 100 June 14, 2024
 
3943 INTO, LEE WARREN PLANNING Prepare Costing Spreadsheet Tab for new Fund to be released to Davao del Sur IMO: Cogon-Bacaca SRIP-SEIA LARP (Php 500,000.00) June 18, 2024 100 June 18, 2024 Completed.
 
3944 INTO, LEE WARREN PLANNING Attend Flag Ceremony June 18, 2024 100 June 17, 2024 Attended on time.
 
3945 INTO, LEE WARREN PLANNING Prepare Back-to-Office Report for Upper Cabasagan CIS Site Inspection conducted last June 14, 2024 June 21, 2024 100 June 17, 2024 Completed.
 
4032 INTO, LEE WARREN PLANNING Prepare FSDE Report as of June 15, 2024 June 21, 2024 100 June 20, 2024 Completed.
 
4034 INTO, LEE WARREN PLANNING Continue Working on the Detailed Engineering Design of Mal RIS SFIAM Protection Works Upstream (Actual date started: June 14, 2024) June 21, 2024 50 June 21, 2024 1.) Completed Upstream Plan & Profile; 2.) Completed Cross-Sections (ended at STA 0+776.91); 3.) Completed Turn-In Structure Design.
 
4068 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag ceremony. June 18, 2024 100 June 18, 2024 Attended
 
4069 ENCABO, PRINCESS SHAIRA MAE PLANNING Coordination with other agencies re: Tree Planting for NIA Anniversary Celebration June 18, 2024 100 June 18, 2024 Completed. Coordinated BLGUs and RPSB personnel. Other accomplishments: - Instructed PRIS/MRIS personnel to clean nursery/PRIS office periphery.
 
4070 ENCABO, PRINCESS SHAIRA MAE PLANNING Plantation site inspection and monitoring. June 19, 2024 100 June 19, 2024 Completed. Re-planted 50 lanzones seedlings in Mahayahay site.
 
4071 ENCABO, PRINCESS SHAIRA MAE PLANNING Plantation site inspection and monitoring. June 20, 2024 100 June 20, 2024 Completed. - Re-planted additional lanzones and avocado seedlings in Mahayahay sites. - Sowed collected durian seeds.
 
4072 ENCABO, PRINCESS SHAIRA MAE PLANNING Plantation site inspection and monitoring. June 21, 2024 100 June 21, 2024 Completed. - Facilitated the round weeding for the seedlings in Y2 sites at Brgy. Clib.
 
4073 SASUMAN, MARY LOUISE J. PLANNING Finalize and organize Tables and Figures for Bagumbayan SPIP FSR. June 17, 2024 100 June 17, 2024 Completed.
 
4074 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony. June 17, 2024 100 June 17, 2024 Completed.
 
4076 SASUMAN, MARY LOUISE J. PLANNING Print and submit Bagumbayan FSR. June 19, 2024 100 June 19, 2024 Completed. Ready for signature.
 
4077 SASUMAN, MARY LOUISE J. PLANNING Submit the lacking documents to EMB on the CNC Application of San Miguel and Sinawilan SIPs June 19, 2024 100 June 19, 2024 Completed.
 
4078 SASUMAN, MARY LOUISE J. PLANNING Update the monitoring of Padada RIS Modernization FSR per Discipline June 20, 2024 100 June 20, 2024 Completed.
 
4079 SASUMAN, MARY LOUISE J. PLANNING Prepare NWRB Certificate of Posting June 20, 2024 100 June 20, 2024 Completed.
 
4080 SASUMAN, MARY LOUISE J. PLANNING Compile the Client Survey Forms on Commercial Sand and Gravel Applicant June 20, 2024 100 June 20, 2024 Completed.
 
4081 SASUMAN, MARY LOUISE J. PLANNING Entertain and assist client on CSAG Applicant June 20, 2024 100 June 20, 2024 Completed.
 
4082 SASUMAN, MARY LOUISE J. PLANNING Plot on Google Earth the applied CSAG area in Lamidan, Sta. Maria, Davao Occidental for verification. June 21, 2024 100 June 21, 2024 Completed.
 
4083 SASUMAN, MARY LOUISE J. PLANNING Update the comments from RO on the Geology section for PRIS Modernization FSR. June 21, 2024 100 June 21, 2024 Completed and revised the write-ups as per RIO Comments.
 
4084 SASUMAN, MARY LOUISE J. PLANNING Attend and participate on the celebration of NIA Anniversary at NIA-DDS IMO. June 21, 2024 100 June 21, 2024 Completed.
 
4085 LUARDO, GLENN D. PLANNING Attend and Participate in Flag Raising Ceremony. June 18, 2024 100 June 18, 2024
 
4086 LUARDO, GLENN D. PLANNING Facilitate in preparing documents for Cash Advance (CA) of the conducted FPIC Meeting June 18, 2024 60 June 18, 2024 Other Accomplishment: Prepared Daily Time Record for the month of June 1-15, 2024 (100%), Attended Afternoon activity in preparation for NIA Day (100%).
 
4087 LUARDO, GLENN D. PLANNING Facilitate in preparing 2 Purchased Request (PR) for the use in the beautification of Padada and Mal RIS Nursery June 19, 2024 100 June 19, 2024 Other accomplishment: Facilitated in preparing documents for Cash Advance (CA) of the conducted FPIC Meeting (100%), Attended afternoon activity in preparation for NIA Day (100%).
 
4088 LUARDO, GLENN D. PLANNING Finalizing and printing Project Development Department (PDD) Form 1 of the proposed Bagumbayan PIP June 20, 2024 100 June 20, 2024 Other accomplishment: Revised Sworn Statement proponent name to National Irrigation Administration from Engr. Dexter F. Tinapay of the proposed San Jose SIP and Sinawilan SIP and submitted to EMB (100%), Attended afternoon activity in preparation for NIA
 
4089 LUARDO, GLENN D. PLANNING Attend & Participate in the Celebration of the 61st NIA Day June 21, 2024 100 June 21, 2024 Other Accomplishment: Facilitate in preparing 1 Purchase Request (PR) for the conducted FPIC Meeting (100%), Attended morning & afternoon NIA activity (100%).
 
4092 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony June 18, 2024 100 June 18, 2024
 
4093 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps of Bagumbayan PIP for Feasibility Study (FS) attachment (HAZARD MAP: Volcanic, Ground Rupture, Ground shaking, Tsunami, Flood, Landslide Hazard Maps) June 18, 2024 100 June 18, 2024 COMPLETED
 
4094 CUICO, JHO-ANN A. PLANNING Practice MODERN DANCE (Preparation for NIA DAY CELEBRATION 1PM-5PM) June 18, 2024 100 June 18, 2024
 
4095 CUICO, JHO-ANN A. PLANNING Design and drafting of FY 2025 (PADADA RIS Lateral B4) Station 0+000.00 - 1+000.00, 1+000.00 - 2+200.00, 2+200.00 - 3+400.00, - Profiling (Ma'am Athena's Corrections) June 19, 2024 100 June 19, 2024 COMPLETED
 
4096 CUICO, JHO-ANN A. PLANNING Design and drafting of FY 2025 (PADADA RIS Lateral B4) - Cross Section (Ma'am Athena's Corrections) June 19, 2024 100 June 19, 2024 COMPLETED
 
4098 MARTURILLAS, JOHN LLOYD PLANNING Checking and Polishing of Talomo River and Dacudao SIP survey data June 17, 2024 100 June 18, 2024 COMPLETED
 
4099 MARTURILLAS, JOHN LLOYD PLANNING Plotted 1 LUC application June 17, 2024 100 June 18, 2024 COMPLETED
 
4100 CUICO, JHO-ANN A. PLANNING Practice MODERN DANCE and VOLLEY BALL (Preparation for NIA DAY CELEBRATION 1pm-5pm) June 19, 2024 100 June 19, 2024
 
4101 MARTURILLAS, JOHN LLOYD PLANNING Plotting, Labeling, and Generating of Profile and Cross-section of MAL RIS LATERAL E 4+478.44 - 4+925.08 June 18, 2024 100 June 19, 2024 COMPLETED
 
4102 CUICO, JHO-ANN A. PLANNING Prepared Vicinity Map and General Layout Map for Water Permit Application (Waterfall SIP, BAGONG NEGROS CIP, SAN MIGUEL SIP, SINAWILAN SIP) June 20, 2024 100 June 20, 2024 COMPLETED
 
4104 CUICO, JHO-ANN A. PLANNING Practiced VOLLEYBALL (Preparation for NIA DAY CELEBRATION 3pm-5pm) June 20, 2024 100 June 20, 2024
 
4105 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents June 20, 2024 100 June 20, 2024 COMPLETED
 
4106 MARTURILLAS, JOHN LLOYD PLANNING Checking and Polishing of Cogon Bacaca SRIP Lateral E 0+000.00 - 5+564.91 June 20, 2024 100 June 20, 2024 COMPLETED
 
4107 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities June 20, 2024 100 June 20, 2024 COMPLETED
 
4108 CUICO, JHO-ANN A. PLANNING Prepared Vicinity Map and General Layout Map for Water Permit Application (SAN JOSE SIP, NEW VISAYAS SIP, SALOY SIP, TITUGOP SIP, TANWALANG SIP) June 21, 2024 100 June 20, 2024 COMPLETED
 
4109 MARTURILLAS, JOHN LLOYD PLANNING Plotting of SMIA Dam and riverbed June 21, 2024 100 June 21, 2024 COMPLETED
 
4110 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities June 21, 2024 100 June 21, 2024 COMPLETED
 
4111 ESPADERA, MA LOURDES PLANNING Conduct Control Survey at Asbang SRIP June 20, 2024 100 June 20, 2024
 
4112 ESPADERA, MA LOURDES PLANNING Conduct Control Survey at Asbang SRIP June 21, 2024 100 June 21, 2024
 
4113 CAYABYAB, REY JIM PLANNING Draft letter to Brgy. San Agustin, Sta. Maria re: Request permission to use the brgy. gymnasium June 18, 2024 100 June 18, 2024 Attended afternoon activity in preparation of the upcoming NIA Day
 
4114 CUICO, JHO-ANN A. PLANNING Prepared Vicinity Map and General Layout Map for Water Permit Application (CULAMAN SIP, DATU DANWATA SIP, NEW SILAY SIP) June 21, 2024 100 June 21, 2024 COMPLETED
 
4115 CAYABYAB, REY JIM PLANNING Draft letter to DPWH District Engineering Office of Davao del Sur, Davao Occidental, 3rd District Davao City re: Endorsement of Convergence Projects June 19, 2024 100 June 19, 2024 Attended afternoon activity in preparation of the upcoming NIA Day
 
4116 CUICO, JHO-ANN A. PLANNING Practiced MODERN DANCE and VOLLEYBALL (Preparation for NIA DAY CELEBRATION 1pm-5pm) June 21, 2024 100 June 21, 2024
 
4117 CAYABYAB, REY JIM PLANNING Comply to RIO XI comments on Padada RIS Modernization FSR June 20, 2024 100 June 20, 2024 Attended afternoon activity in preparation of the upcoming NIA Day
 
4118 CAYABYAB, REY JIM PLANNING Prepare detailed cost estimate of the proposed Kibangay PIP June 21, 2024 100 June 21, 2024
 
4119 EUGENIO, VENANN PLANNING Edit the conceptual design of the stage for NIA Day June 18, 2024 100 June 18, 2024 Other Accomplishments: Assist clients/applicants for TOT; Edit LUC Certification (Forestlake); Perform other related tasks.
 
4120 EUGENIO, VENANN PLANNING Check the canal and stationing reflected in the IMT Contract of New Silay SIP June 19, 2024 100 June 19, 2024 Other Accomplishments: Assist clients/applicants for TOT and LUC; Update shapefiles of Miral SRIS Canal under IMT Contract; Volleyball practice
 
4121 EUGENIO, VENANN PLANNING Assist in the preparation of the inventory of overlapping areas June 20, 2024 100 June 20, 2024 Other Accomplishments: Process LUC application; Filing of TOT and LUC Certificates; Assist clients/applicants for TOT; Scan plans of San Jose SIP to be provided to DPWH for the road widening affected irrigation facilities
 
4122 EUGENIO, VENANN PLANNING Redelineate service area of Miral SRIS as per O&M comment June 21, 2024 100 June 21, 2024 Other Accomplishments: Revise layout map for BTOR attachment; Process LUC application; Assist clients/applicants for TOT; NIA 61st Anniversary Celebration
 
4123 CAYABYAB, REY JIM PLANNING Prepare implementation schedule of the proposed Kibangay PIP June 21, 2024 100 June 21, 2024 Attended morning and afternoon activity in preparation of the upcoming NIA Day
 
4124 CUICO, JHO-ANN A. PLANNING 61st NIA Anniversary Celebration (Parlor Games) June 21, 2024 100 June 21, 2024
 
4180 INTO, LEE WARREN PLANNING Attend Flag Ceremony June 24, 2024 100 June 24, 2024 Attended on time.
 
4181 INTO, LEE WARREN PLANNING Worked on the Detailed Engineering Design of Mal RIS SFIAM Protection Works June 27, 2024 80 June 26, 2024 1.) Completed Plan and Profile of Upstream. Checked and returned with comments from Maam Lei and Sir JM; 2.)Completed Cross Sections (Sta 0+000 - Sta 776.91) 3.) Completed Plan and Profile of Upstream; 4.) On-going cross-sections. Currently at Sta 0+600
 
4188 HERNAN, ALDEN PLANNING Continue in the hydraulic design of Cogon Bacaca SRIP at lateral B1 canal structures -change of design due to compromise irrigable area (1+922.73-sta. 3+607.68) June 21, 2024 100 June 21, 2024 Design completed/for checking
 
4189 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. June 24, 2024 100 June 24, 2024 Completed. - Site inspection on tree planting sites @ Dongan Pekong. - Oversee tree guard preparation/nursery activities.
 
4190 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. June 25, 2024 100 June 25, 2024 - Site inspected plantation @ Brgy. San Miguel, Matanao. - Facilitated tree guard preparation @ PRIS.
 
4191 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. June 26, 2024 100 June 26, 2024 -Hauled 200 narra seedling from CENRO to MRIS and 50 lanzones seedlings from PRIS nursery. - Facilitated tree guard preparation. - Site monitored plantation @ Kapoc, Matanao.
 
4192 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. June 27, 2024 100 June 27, 2024 - Site inspected Brgy. Langa-an plantation sites. - Facilitated tree guard preparation. - Assisted in planting of collected cuttings/seeds @ PRIS nursery.
 
4193 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. June 28, 2024 100 June 28, 2024 - Site monitored plantation sites in PRIS. - Nursery visitation. - Prepared & submitted DTRs and payrolls of PRIS/MRIS field personnel.
 
4194 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony June 24, 2024 100 June 24, 2024
 
4195 CUICO, JHO-ANN A. PLANNING Prepared Vicinity Map and General Layout Map for Water Permit Application (Little Baguio 2 SIP,Suawan River-Tamugan SIP,Moab SIP) June 24, 2024 100 June 24, 2024 COMPLETED
 
4196 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents June 24, 2024 100 June 24, 2024
 
4197 CUICO, JHO-ANN A. PLANNING Practiced MODERNDAN & VOLLEYBALL (Preparation for NIA DAY CELEBRATION 1pm-5pm) June 24, 2024 100 June 24, 2024
 
4198 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps of PRE - FS (Kibangay SIP June 25, 2024 100 June 25, 2024 COMPLETED: Administrative Map, Land Classification, Land Cover
 
4199 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents June 25, 2024 100 June 25, 2024 COMPLETED
 
4200 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW Attachments June 25, 2024 100 June 25, 2024 COMPLETED
 
4201 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps of PRE - FS (Kibangay SIP June 25, 2024 100 June 25, 2024 COMPLETED: Climate Map, Ground Rupture, Ground shaking Hazard Maps
 
4203 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents June 26, 2024 100 June 26, 2024 COMPLETED
 
4204 CUICO, JHO-ANN A. PLANNING Design and drafting of FY 2025 (MAL RIS RMC Lateral E) Station 4+478.44 - 4+887.86 - VO June 26, 2024 100 June 26, 2024 COMPLETED
 
4205 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps of PRE - FS (Kibangay SIP) June 26, 2024 100 June 26, 2024 COMPLETED: Tsunami Hazard, Liquefaction Hazard, Land Slide, Flood Hazard Map
 
4206 CUICO, JHO-ANN A. PLANNING Practiced MODERNDAN & VOLLEYBALL (Preparation for NIA DAY CELEBRATION 1pm-5pm) June 26, 2024 100 June 26, 2024
 
4207 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Input Details to LOG BOOK LUC Tracker June 27, 2024 100 June 27, 2024 COMPLETED
 
4208 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW Attachments June 27, 2024 100 June 27, 2024 COMPLETED
 
4210 CUICO, JHO-ANN A. PLANNING Design and drafting of FY 2025 (PADADA RIS Lateral B_FY 2025) Station 0+000.00 - 7+160.34 (Profile Plan and Cross Sectioning) June 27, 2024 20 June 27, 2024 ONGOING
 
4211 CUICO, JHO-ANN A. PLANNING Practiced MODERNDAN & VOLLEYBALL (Preparation for NIA DAY CELEBRATION 1pm-5pm) June 27, 2024 100 June 27, 2024
 
4212 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Input Details to LOG BOOK LUC Tracker June 28, 2024 100 June 28, 2024 COMPLETED
 
4213 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW Attachments June 28, 2024 100 June 28, 2024 COMPLETED
 
4214 CUICO, JHO-ANN A. PLANNING Design and drafting of FY 2025 (PADADA RIS Lateral B_FY 2025) Station 0+000.00 - 7+160.34 (Profile Plan and Cross Sectioning) June 28, 2024 30 June 28, 2024 ONGOING
 
4217 CUICO, JHO-ANN A. PLANNING Practiced VOLLEYBALL (Preparation for NIA DAY CELEBRATION 3pm-5pm) June 28, 2024 100 June 28, 2024
 
4233 HERNAN, ALDEN PLANNING *Continue in the design of cogon Bacaca SRIP at lateral B1 canal structures-change in the design due to compromise area (Rd. X-ing: 2+635.92, 2+945.70) & practice modern dance June 25, 2024 100 June 25, 2024
 
4234 HERNAN, ALDEN PLANNING Continue in the design of Cogon Bacaca SRIP at lateral B1 canal structures-change in the design due to compromise area (Vertical Drop: 2+991.20, 3+024.78) & practice modern dance June 26, 2024 100 June 26, 2024
 
4235 HERNAN, ALDEN PLANNING Workout Summary of Cogon Bacaca DED accomplishment of Engr. Vencilao and Engr. Hernan & Practice modern dance June 27, 2024 0 N/A
 
4236 HERNAN, ALDEN PLANNING Prepare DTR and other Attachments, work-out TEV liquidation, continue and correcting Cogon Bacaca Lat. B1 canal structures design June 28, 2024 0 N/A
 
4239 ESPADERA, MA LOURDES PLANNING Addressed the initial comments on Surveying and Mapping (Padada RIS Modernization) June 24, 2024 100 June 24, 2024 35% Accomplishment on this day
 
4240 ESPADERA, MA LOURDES PLANNING Prepare request for renewal of JO Personnel assigned at Suawan SRIP June 24, 2024 100 June 24, 2024
 
4241 ESPADERA, MA LOURDES PLANNING Finalized the letter to BLGUs for Miral SRIS Parcellary Survey Activities June 24, 2024 100 June 24, 2024
 
4242 ESPADERA, MA LOURDES PLANNING Addressed the initial comments on Surveying and Mapping (Padada RIS Modernization) June 25, 2024 64 June 25, 2024
 
4243 ESPADERA, MA LOURDES PLANNING Prepare Documents for 3 Land Use Conversion Application June 26, 2024 100 June 26, 2024
 
4244 ESPADERA, MA LOURDES PLANNING Miscellaneous: Follow up Network Adjustment Report for Padada RIS Follow up Rinex Data of Suawan SRIP Control Survey Data June 26, 2024 100 June 26, 2024
 
4245 ESPADERA, MA LOURDES PLANNING Revised the Suawan SRIP Survey Report as per email received last June 26 June 27, 2024 100 June 27, 2024 75% Accomplishment on this day
 
4246 ESPADERA, MA LOURDES PLANNING Miscellaneous: Follow up request of Levelling Instrument to DDN Follow up the RTK from RIO Follow up requested Geotag Photos from Clients of LUC Requested Engine Oil for Survey Vehicle Follow up PR for requested survey tools June 27, 2024 100 June 27, 2024
 
4247 ESPADERA, MA LOURDES PLANNING Revised the Suawan SRIP Survey Report as per email received last June 27 June 28, 2024 90 June 28, 2024
 
4248 ESPADERA, MA LOURDES PLANNING Prepare DTR and WAR June 28, 2024 100 June 28, 2024
 
4249 ESPADERA, MA LOURDES PLANNING Prepare and Check Payroll for Survey Team and Local JO Personnel June 28, 2024 100 June 28, 2024
 
4250 ESPADERA, MA LOURDES PLANNING Preparation for NIA 61st Anniversary July 1, 2024 100 July 1, 2024
 
4251 ESPADERA, MA LOURDES PLANNING Preparation for 61st NIA Anniversary July 2, 2024 100 July 2, 2024
 
4252 ESPADERA, MA LOURDES PLANNING Attend 61st NIA Anniversary July 3, 2024 100 July 3, 2024
 
4253 ESPADERA, MA LOURDES PLANNING Attend 61st NIA Anniversary July 4, 2024 100 July 4, 2024
 
4255 ESPADERA, MA LOURDES PLANNING Attend 61st NIA Anniversary July 5, 2024 100 July 5, 2024
 
4256 MARTURILLAS, JOHN LLOYD PLANNING Preparation for 61st NIA Anniversary Celebration July 1, 2024 100 July 1, 2024 Completed
 
4257 MARTURILLAS, JOHN LLOYD PLANNING Preparation for 61st NIA Anniversary Celebration July 2, 2024 100 July 2, 2024 Completed
 
4258 MARTURILLAS, JOHN LLOYD PLANNING Attend for 61st NIA Anniversary Celebration July 3, 2024 100 July 3, 2024 Completed
 
4260 MARTURILLAS, JOHN LLOYD PLANNING Attend for 61st NIA Anniversary Celebration July 4, 2024 100 July 4, 2024 Completed
 
4261 MARTURILLAS, JOHN LLOYD PLANNING Attend for 61st NIA Anniversary Celebration July 5, 2024 100 July 5, 2024 Completed
 
4262 MARTURILLAS, JOHN LLOYD PLANNING Labeling of Plan and Profile, Generating of Profile and Cross-section of SMIA DAM RIVERBED 1+500m upstream and downstream June 24, 2024 100 June 24, 2024 Completed
 
4263 MARTURILLAS, JOHN LLOYD PLANNING Plotted 1 LUC applications June 24, 2024 100 June 24, 2024 Completed
 
4264 MARTURILLAS, JOHN LLOYD PLANNING Plotting of MIRAL SRIS parcellary survey 18 lots June 25, 2024 100 June 25, 2024 Completed
 
4265 MARTURILLAS, JOHN LLOYD PLANNING Plotted 5 LUC applications June 25, 2024 100 June 25, 2024 Completed
 
4266 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities June 25, 2024 100 June 25, 2024 Completed
 
4267 MARTURILLAS, JOHN LLOYD PLANNING Plotting of MIRAL SRIS parcellary survey 26 lots June 26, 2024 100 June 26, 2024 Completed
 
4268 MARTURILLAS, JOHN LLOYD PLANNING Conduct site inspection at Sacub DAM June 26, 2024 100 June 26, 2024 Completed
 
4269 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities June 26, 2024 100 June 26, 2024 Completed
 
4270 MARTURILLAS, JOHN LLOYD PLANNING Polishing of KITAHA-IGPIT topographic map June 27, 2024 100 June 27, 2024 Completed
 
4271 MARTURILLAS, JOHN LLOYD PLANNING Plotting of MIRAL SRIS parcellary survey 1 lot June 27, 2024 100 June 27, 2024 Completed
 
4272 MARTURILLAS, JOHN LLOYD PLANNING Plotting of MIRAL SRIS parcellary survey June 28, 2024 100 June 28, 2024 Completed
 
4273 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities June 28, 2024 100 June 28, 2024 Completed
 
4274 MARTURILLAS, JOHN LLOYD PLANNING Prepare Suawan SRIP profile data June 28, 2024 100 June 28, 2024 Completed
 
4280 CUICO, JHO-ANN A. PLANNING Preparation for 61st NIA Anniversary Venue July 1, 2024 100 July 1, 2024
 
4282 CUICO, JHO-ANN A. PLANNING Preparation for 61st NIA Anniversary Venue July 2, 2024 100 July 2, 2024
 
4283 INTO, LEE WARREN PLANNING Assist in the preparation of 61st NIA Anniversary Celebration. July 2, 2024 100 July 2, 2024 Completed.
 
4285 CAYABYAB, REY JIM PLANNING Prepare write-ups for Chapter 8 of the proposed Kibangay SIP FSR June 24, 2024 100 June 24, 2024 Attended afternoon activity in preparation of the upcoming NIA Day
 
4287 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony June 24, 2024 100 June 24, 2024
 
4288 LUARDO, GLENN D. PLANNING Prepared Tables and Shp files for Present Land Use Map of the proposed Kibangay SIP. June 24, 2024 100 June 24, 2024 Other Accomplishment: Attended Afternoon Activity in preparation for NIA Day (100%).
 
4290 CAYABYAB, REY JIM PLANNING Prepare a letter to CJC Alumni re: solicitation for the construction of the chapel at the Piazza del Sacro Cuore June 25, 2024 100 June 25, 2024 Attended afternoon activity in preparation of the upcoming NIA Day
 
4292 LUARDO, GLENN D. PLANNING Prepared Tables and Shp files for Future Land Use Map of the proposed Kibangay SIP. June 25, 2024 100 June 25, 2024 Other Accomplishments: Prepared Tables for Price Structure of Urea, Potassium, and Phosporous of the proposed Kibangay SIP (70%); Attended Afternoon Activity in preparation for NIA Day (100%).
 
4293 CUICO, JHO-ANN A. PLANNING 1st Day of 61st NIA Anniversary Celebration at Sta Maria Splash Blue Resort July 3, 2024 100 July 3, 2024
 
4294 SASUMAN, MARY LOUISE J. PLANNING Prepare and submit certification for Commercial Sand and Gravel (CSAG) June 24, 2024 100 June 24, 2024 Completed.
 
4295 CUICO, JHO-ANN A. PLANNING 2nd Day of 61st NIA Anniversary Celebration at Sta Maria Splash Blue Resort July 4, 2024 100 July 4, 2024
 
4298 CAYABYAB, REY JIM PLANNING Attend meeting with BIR personnel re: zonal values of real properties in Davao del Sur June 25, 2024 100 June 25, 2024 Updated the detailed cost estimate of the proposed Kibangay SIP FSR
 
4299 INTO, LEE WARREN PLANNING Assist in the preparation of 61st NIA Anniversary Celebration. July 3, 2024 100 July 3, 2024 Completed.
 
4300 CUICO, JHO-ANN A. PLANNING 3rd Day of 61st NIA Anniversary Celebration at Sta Maria Splash Blue Resort July 5, 2024 100 July 5, 2024
 
4301 LUARDO, GLENN D. PLANNING Prepared Tables for Price Structure of Urea, Potassium, and Phosporous of the proposed Kibangay SIP. June 26, 2024 100 June 26, 2024 Other Accomplishments: Delivered Communication Letter at DPWH (100%), Claimed data requested at the Provincial Assessor Office in reference to the proposed Cogon Bacaca SRIP (100%), Attended Afternoon Activity in preparation for NIA Day (100%).
 
4302 SASUMAN, MARY LOUISE J. PLANNING Tabulate the status of the application of CNC for the proposed SIPs. June 24, 2024 100 June 24, 2024 Completed.
 
4303 LUARDO, GLENN D. PLANNING Prepared Tables on (Price Structure for Corn, Cacao, and Banana) of the proposed Kibangay SIP project. June 27, 2024 100 June 27, 2024 Other Accomplishment: Attended Afternoon Activity in preparation for NIA Day (100%).
 
4304 SASUMAN, MARY LOUISE J. PLANNING Attend meeting at NIA-DDS Federation Bldg. relative to the preparation of 61st NIA Celebration. June 24, 2024 100 June 24, 2024 Completed.
 
4306 SASUMAN, MARY LOUISE J. PLANNING Meeting with BIR personnel relative to the relative to the zonal values of real properties in Davao del Sur province. June 25, 2024 100 June 25, 2024 Completed.
 
4307 CAYABYAB, REY JIM PLANNING Prepare a template for the detailed inventory of the Cogon-Bacaca SRIP LARP preparation June 26, 2024 100 June 26, 2024 Attended afternoon activity in preparation of the upcoming NIA Day
 
4308 CAYABYAB, REY JIM PLANNING Prepare the draft contents of the booklet for the Cogon-Bacaca SRIP consultation meetings for LARP preparation June 26, 2024 100 June 26, 2024
 
4309 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter re: Request for Police Security Assistance for the 61st NIA Anniversary Celebration. June 25, 2024 100 June 25, 2024 Completed.
 
4310 CAYABYAB, REY JIM PLANNING Re-computation of volume base on the revised plan for the San Jose PIP POW June 27, 2024 100 June 27, 2024 Attended afternoon practice in preparation of the upcoming NIA Day
 
4311 CAYABYAB, REY JIM PLANNING Prepare a letter to RIO and ABC-Baguio Ditrict re: request for an irrigation project for the farmers in the district June 28, 2024 100 June 28, 2024 Attended afternoon practice in preparation of the upcoming NIA Day
 
4312 CAYABYAB, REY JIM PLANNING Preparation for the 61st NIA Anniversary Celebration July 1, 2024 100 July 1, 2024
 
4313 SASUMAN, MARY LOUISE J. PLANNING Bind and submit the Bagumbayan PIP FSR for signatory. June 25, 2024 100 June 25, 2024 Completed.
 
4314 SASUMAN, MARY LOUISE J. PLANNING Prepare the write-ups of proposed Kibangay SIP, specifically, Chapter 6: Geolgy. June 26, 2024 100 June 26, 2024 Completed.
 
4315 SASUMAN, MARY LOUISE J. PLANNING Compute Peak Ground Acceleration (PGA) for Kibangay SIP FSR. June 26, 2024 100 June 26, 2024 Completed.
 
4316 SASUMAN, MARY LOUISE J. PLANNING Prepare the write-ups of proposed Kibangay SIP, specifically, Chapter 9: Environmental and Social Assessment. June 27, 2024 100 June 27, 2024 Completed.
 
4317 SASUMAN, MARY LOUISE J. PLANNING Update the status of the application of CNC for the proposed SIPs. June 27, 2024 100 June 27, 2024 Completed.
 
4318 SASUMAN, MARY LOUISE J. PLANNING Entertain Certificate of Commercial Sand and Gravel (CSAG). June 27, 2024 100 June 27, 2024 Completed.
 
4319 CAYABYAB, REY JIM PLANNING Preparation for the 61st NIA Anniversary Celebration July 2, 2024 100 July 2, 2024
 
4320 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter re: Request to Borrow Tents for the 61st NIA Anniversary Celebration. June 27, 2024 100 June 27, 2024 Completed.
 
4322 SASUMAN, MARY LOUISE J. PLANNING Assist the PR team in the preparation of the Photo Gallery and Bulletin Board of the Office. June 27, 2024 100 June 27, 2024 Completed.
 
4323 SASUMAN, MARY LOUISE J. PLANNING Complete the preparation the write-ups of proposed Kibangay SIP, specifically, Chapter 9: Environmental and Social Assessment. June 28, 2024 100 June 28, 2024 Completed.
 
4324 SASUMAN, MARY LOUISE J. PLANNING Prepare DTRs and WARs. June 28, 2024 100 June 28, 2024 Completed.
 
4326 INTO, LEE WARREN PLANNING Assist in the preparation of 61st NIA Anniversary Celebration. July 4, 2024 100 June 4, 2024 Completed.
 
4327 INTO, LEE WARREN PLANNING Assist in the preparation of 61st NIA Anniversary Celebration. July 5, 2024 100 July 5, 2024 Completed.
 
4331 CAYABYAB, REY JIM PLANNING Attend and participate in the 61st NIA Anniversary Celebration July 3, 2024 100 July 3, 2024
 
4332 CAYABYAB, REY JIM PLANNING Attend and participate in the 61st NIA Anniversary Celebration July 4, 2024 100 July 4, 2024
 
4333 CAYABYAB, REY JIM PLANNING Attend and participate in the 61st NIA Anniversary Celebration July 5, 2024 100 July 5, 2024
 
4334 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation for 61st NIA Anniversary Venue July 1, 2024 100 July 1, 2024
 
4335 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation for 61st NIA Anniversary Venue July 2, 2024 100 July 2, 2024
 
4336 ENCABO, PRINCESS SHAIRA MAE PLANNING 1st Day of 61st NIA Anniversary Celebration at Sta Maria Splash Blue Resort July 3, 2024 100 July 3, 2024
 
4337 LUARDO, GLENN D. PLANNING Preparation of the Venue in the 61st NIA Anniversary Celebration at SBBR, Sta. Maria, Davao Occidental. July 2, 2024 100 July 2, 2024 On June 1, 2024 1st day of Preparation of the Venue in the 61st NIA Anniversary Celebration at SBBR, Sta. Maria, Davao Occidental (50%).
 
4338 ENCABO, PRINCESS SHAIRA MAE PLANNING 2nd Day of 61st NIA Anniversary Celebration at Sta Maria Splash Blue Resort July 4, 2024 100 July 4, 2024
 
4339 LUARDO, GLENN D. PLANNING Attend and participate in the 61st NIA Anniversary Celebration at SBBR, Sta. Maria, Davao Occidental. July 5, 2024 100 July 5, 2024 On June 3-4, 2024 attended and participate in the 61st NIA Anniversary Celebration at SBBR, Sta. Maria, Davao Occidental (70%); Conduct drone activity on the tree planting activity at Sta. Maria, Davao Occidental (100%).
 
4340 ENCABO, PRINCESS SHAIRA MAE PLANNING Conducted Tree Panting at Dongan Pekong July 5, 2024 100 July 5, 2024
 
4341 SASUMAN, MARY LOUISE J. PLANNING Assist in the preparation of 61st NIA Anniversary Celebration. July 1, 2024 100 July 1, 2024 Completed.
 
4342 SASUMAN, MARY LOUISE J. PLANNING Assist in the preparation of 61st NIA Anniversary Celebration. July 2, 2024 100 July 2, 2024 Completed.
 
4346 SASUMAN, MARY LOUISE J. PLANNING Attend in the preparation of 61st NIA Anniversary Celebration. July 3, 2024 100 July 3, 2024 Completed.
 
4347 SASUMAN, MARY LOUISE J. PLANNING Attend in the preparation of 61st NIA Anniversary Celebration. July 4, 2024 100 July 3, 2024 Completed.
 
4349 SASUMAN, MARY LOUISE J. PLANNING Attend in the preparation of 61st NIA Anniversary Celebration. July 5, 2024 100 July 5, 2024 Completed.
 
4350 EUGENIO, VENANN PLANNING Prepare layout for the inventory of overlapping service areas June 24, 2024 100 June 24, 2024 Other Accomplishments: 20% -Comments on PRIS Modernization FSR; 100% - Assist clients/applicants for TOT; 100% -Reevaluate and edit the canal and stationing reflected in the IMT Contract of New Silay SIP; 100%-Volleyball practice
 
4351 EUGENIO, VENANN PLANNING Edit floor plan/design layout for NIA Day venue June 25, 2024 100 June 25, 2024 Other Accomplishments: 50% -Edit PRIS Modernization FSR as per RIO comments; 100% -Assist in the preparation of dam inventory; 100% - Assist clients/applicants for TOT; 100% -Process TOT applications; 100% -Volleyball practice
 
4352 EUGENIO, VENANN PLANNING Prepare Summary of Physical Targets for Other Crops of Existing Irrigation Systems for PIMP June 26, 2024 100 June 26, 2024 Other Accomplishments: 100% -Process TOT applications; 60% -Comments on PRIS Modernization; 100% -Prepare lists of projects to be used on the CPAFEP Discussion; 100% -Assist clients/applicants for TOT; 100% -Volleyball practice
 
4353 EUGENIO, VENANN PLANNING Updated FY 2025 proposed projects and 10-year plan as per reprioritization of Wangan SIS proposed POW June 27, 2024 100 June 27, 2024 Other Accomplishments: 100% -Contact applicants for TOT Certifications; 80% -Comments on PRIS Modernization FSR; 100% -Prepare layout map for POW attachment; 100% -Assist clients/applicants for TOT; 100% -Volleyball practice
 
4354 EUGENIO, VENANN PLANNING Process Transfer of Title and LUC applications June 28, 2024 100 June 28, 2024 Other Accomplishments: 90% -Comments on PRIS Modernization FSR; 100% -Prepare and submit DTR; 50% - Delineate partially validated service area of San Jose SIP; 100% -Prepare transmittal; 100% -Volleyball practice
 
4355 EUGENIO, VENANN PLANNING Holiday Attend Araw ng Davao del Sur Parade July 1, 2024 100 July 1, 2024 Assist in the Preparation for the 61st NIA Anniversary Celebration
 
4356 EUGENIO, VENANN PLANNING Assist in the preparation for the 61st NIA anniversary celebration. July 2, 2024 100 July 2, 2024
 
4357 EUGENIO, VENANN PLANNING Attend 61st NIA Anniversary Celebration. July 3, 2024 100 July 3, 2024
 
4358 EUGENIO, VENANN PLANNING Attend 61st NIA Anniversary Celebration. July 4, 2024 100 July 4, 2024
 
4359 EUGENIO, VENANN PLANNING Attend 61st NIA Anniversary Celebration. July 5, 2024 100 July 5, 2024
 
4360 HERNAN, ALDEN PLANNING Assist in the preparation of the venue for 60th NIA Day Anniversary at Splash Blue Resort, Sta. Maria, Davao Occidental June 2, 2024 0 N/A
 
4361 HERNAN, ALDEN PLANNING Attend and participate 60th NIA day Anniversary at Splash Blue, Sta. Maria, Davao Occidental July 5, 2024 100 July 5, 2024 Attended
 
4362 HERNAN, ALDEN PLANNING Assist in the preparation of the venue for the 61st NIA Anniversary at Splash Blue Resort, Sta. Maria, Davao Occidental July 2, 2024 100 July 2, 2024 completed
 
4399 INTO, LEE WARREN PLANNING Attend Flag Ceremony July 8, 2024 100 July 8, 2024 Attended on time.
 
4400 INTO, LEE WARREN PLANNING Prepare Detailed Engineering Design for Mal RIS (ISFIAM) Protection Works. June 8, 2024 95 July 8, 2024 Completed Detailed Engineering Designs (Plan, Profile and Cross Sections Upstream and Downstream, Sabo Dam, Stairs and Structures). Submitted PDF file to RIO for checking.
 
4401 INTO, LEE WARREN PLANNING Prepare FSDE Report as of July 15, 2024 July 9, 2024 100 July 9, 2024 Completed and sent e-copy to RIO.
 
4402 INTO, LEE WARREN PLANNING Prepare Convergence Report as of June 30, 2024 July 9, 2024 100 July 9, 2024 Completed and submitted e-copy to RIO.
 
4404 INTO, LEE WARREN PLANNING Revise submitted design of Kitaha Creek dam. Change Boulder Riprap design to Class "A" reinforced concrete design as per RIO comments on Padada RIS Modernization FSR. July 10, 2024 100 July 10, 2024 Completed and also added 1x1x1m concrete blocks as recommended by RIO.
 
4408 INTO, LEE WARREN PLANNING Craft Partial design plan for protection works of SMIA for Padada RIS Modernization to be attached in Annex B as per RIO comments July 11, 2024 100 July 12, 2024 Completed.
 
4409 INTO, LEE WARREN PLANNING Compile PDF files of existing Parat and Sacub Protection Works DED to be attached in Padada RIS Modernization Annex B as per RIO comments. July 11, 2024 100 July 12, 2024 Completed.
 
4415 INTO, LEE WARREN PLANNING Prepare planning and design part of EXECOM Report. July 10, 2024 100 July 10, 2024 Completed.
 
4441 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag raising ceremony. July 8, 2024 100 July 8, 2024 Attended
 
4443 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 8, 2024 100 July 8, 2024 Completed. Monitored at Mahayahay and Clib plantation sites.
 
4445 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 9, 2024 100 July 9, 2024 - Site clearing at Malabang plantation sites. - Oversee tree guard preparation.
 
4446 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 10, 2024 100 July 10, 2024 - Site clearing at Malabang damsite. - Oversee tree guard preparation and nursery activities at PRIS.
 
4447 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 11, 2024 100 July 11, 2024 - Site clearing and monitoring of plants at Malabang plantation. - Nursery arrangement of seedlings and propagation of collected seeds/cuttings.
 
4448 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 12, 2024 100 July 12, 2024 - Site clearing and repaired tree guards at Malabang plantation sites. - Collected seeds and cuttings to be propagated at PRIS nursery.
 
4450 INTO, LEE WARREN PLANNING Craft As-Built Plan of SMIA Dam for Padada RIS Modernization Annex B.7 July 11, 2024 100 July 11, 2024 Completed.
 
4453 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony July 8, 2024 100 July 8, 2024
 
4454 LUARDO, GLENN D. PLANNING Prepare Tables on (Price Assumption for Corn, Cacao, Durian, Mango and Banana) of the proposed Kibangay SIP project. July 8, 2024 100 July 8, 2024 Other accomplishment: Consolidate drone files during the 61st NIA Anniversary at Sta. Maria, Davao Occidental (100%). Prepared Tables on (Production Cost per Hectare of Corn, Cacao, and Durian) of the proposed Kibangay SIP project (100%).
 
4455 LUARDO, GLENN D. PLANNING Prepare Tables on (Production Cost per Hectare of Banana and Mango; Economic cost of Labor; Net Present Value at Full Development) of the proposed Kibangay SIP project. July 9, 2024 100 July 9, 2024 Other accomplishment: Submit Oncall Payment Slip to DENR-EMB Online Application for Sinawilan SIP, San Jose SIP, San Miguel SIP and Basiawan PIP Projects as requirements for CNC application (100%).
 
4456 LUARDO, GLENN D. PLANNING Prepare Tables on (Farm Budget Present and Future and EIRR) of the proposed Kibangay SIP project. July 10, 2024 100 July 10, 2024 Other Accomplishment: Prepare IPCR for the 1st quarter of Cy 2024 (100%).
 
4473 MARTURILLAS, JOHN LLOYD PLANNING Conduct static survey at ASBANG SRIP July 11, 2024 100 July 11, 2024 Completed
 
4474 HERNAN, ALDEN PLANNING DED of Cogon Bacaca SRIP lat. B Structures (Chute structure change to series of vertical drops) July 8, 2024 100 July 8, 2024 completed
 
4475 HERNAN, ALDEN PLANNING DED of Cogon Bacaca SRip lat. B canal structures ( redesign elevated flume) July 9, 2024 100 July 9, 2024 completed
 
4477 HERNAN, ALDEN PLANNING DED of Cogon Bacaca Lat. D1 canalization (0+000.00-2+414.12) July 12, 2024 100 July 12, 2024 for checking
 
4487 INTO, LEE WARREN PLANNING Attend Flag Ceremony July 15, 2024 100 July 15, 2024 Attended on time.
 
4488 ESPADERA, MA LOURDES PLANNING Conducted Control Survey (Static Observation) at Suawan SRIP (1 Control) & Pick up RTK at RIO July 8, 2024 100 July 8, 2024 2% Accomplishment
 
4489 ESPADERA, MA LOURDES PLANNING Conducted Control Survey (Static Observation) at Suawan SRIP (8 Controls) July 9, 2024 100 July 9, 2024 16% Accomplishment
 
4490 ESPADERA, MA LOURDES PLANNING Conducted Control Survey (Static Observation) at Suawan SRIP (10 Controls) July 10, 2024 100 July 10, 2024 34% Accomplishment
 
4491 ESPADERA, MA LOURDES PLANNING Conducted Control Survey (Static Observation) at Suawan SRIP (8 Controls) July 11, 2024 100 July 11, 2024 48% Accomplishment
 
4492 ESPADERA, MA LOURDES PLANNING Conducted Control Survey (Static Observation) at Suawan SRIP (4 Controls) July 12, 2024 55 N/A Rain started at 1:20 PM/ 53% Accomplishment
 
4493 ESPADERA, MA LOURDES PLANNING Prepare Road Network and and assist in the preparation of Drainage Network for PRIS Modernization July 15, 2024 100 July 15, 2024
 
4494 ESPADERA, MA LOURDES PLANNING Conduct Control Verification at Pagan SRIP July 16, 2024 100 July 16, 2024
 
4496 ESPADERA, MA LOURDES PLANNING Conduct Survey Map Test at Pagan SRIP July 18, 2024 100 July 18, 2024
 
4497 ESPADERA, MA LOURDES PLANNING Conduct Survey Map Test at Pagan SRIP July 17, 2024 100 July 17, 2024
 
4498 ESPADERA, MA LOURDES PLANNING Conduct Survey Map Test at Pagan SRIP July 19, 2024 100 July 19, 2024
 
4499 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection at Padada RIS plantation sites. July 15, 2024 100 July 15, 2024 - Attended flag raising ceremony. - Assisted in planting of seeds at PRIS nursery. - Facilitated site clearing & tree guard installation at Clib plantation sites. - Site monitoring of plantation sites.
 
4500 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection at Padada RIS plantation sites. July 16, 2024 100 July 16, 2024 Completed. Other accomplishments: - Planted cuttings/seeds; facilitated making of rooting chamber. - Oversee tree guard preparation.
 
4501 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection at Padada RIS plantation sites. July 17, 2024 100 July 17, 2024 Completed. Other accomplishments: - Facilitated planting of collected cuttings, cacao and vegetable seeds at PRIS nursery; Nursery maintenance. - Oversee site clearing at plantation sites. - Facilitated delivery of water drums & tree guards at Matanao
 
4502 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection at Padada RIS plantation sites. July 18, 2024 100 July 18, 2024 Completed. Other accomplishments: - Facilitated/oversee foliar fertilizer & insecticide application at Clib damsite plantation sites. - Sought issuance of certification of tree planting to be used in the Gratuitous permit.
 
4503 INTO, LEE WARREN PLANNING Prepare PERT-CPM of Little Baguio II SIS. July 15, 2024 100 July 16, 2024 Prepared and provided 5 copies to programmer.
 
4507 INTO, LEE WARREN PLANNING Work on corrections on the Detailed Engineering Design of Mal RIS ISFIAM Protection Works as per RIO last July 10, 2024. July 16, 2024 98 July 16, 2024 1.) Adjusted profile of upstream.; 2.) Edited cross-sections of Upstream as per adjusted profile.; 3.) Edited cross-sections downstream Sta 0+000.00 - 1+248.14; 4.) Compiled all plans as 1 PDF and re-submitted draft to RIO for checking.
 
4511 INTO, LEE WARREN PLANNING Costing FSDE Funds (July 8 -12, 2024) July 12, 2024 100 July 12, 2024 Completed.
 
4516 MARTURILLAS, JOHN LLOYD PLANNING Processing of Suawan SRIP survey returns July 8, 2024 40 July 8, 2024 On-going
 
4517 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities July 8, 2024 100 July 8, 2024 Completed
 
4518 MARTURILLAS, JOHN LLOYD PLANNING Processing of Suawan SRIP survey returns July 9, 2024 100 July 9, 2024 Completed
 
4519 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities July 9, 2024 100 July 9, 2024 Completed
 
4520 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Kitaha-Igpit survey data (Adjusted to new elevation) July 9, 2024 100 July 9, 2024 Completed
 
4521 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities July 10, 2024 100 July 10, 2024 Completed
 
4522 MARTURILLAS, JOHN LLOYD PLANNING Prepare 5 Individual Performance Commitment and Review July 10, 2024 100 July 10, 2024 Completed
 
4523 MARTURILLAS, JOHN LLOYD PLANNING Plotted 4 LUC applications July 10, 2024 100 July 10, 2024 Completed
 
4524 MARTURILLAS, JOHN LLOYD PLANNING Plotting, Generating of Profile and Cross-section of Kitaha-Igpit (Adjusted to new elevation) July 10, 2024 40 July 10, 2024 On-going
 
4525 MARTURILLAS, JOHN LLOYD PLANNING Preparation of Map-test lines for Pagan SRIP (Service area and Reservoir) July 12, 2024 100 July 12, 2024 Completed
 
4526 MARTURILLAS, JOHN LLOYD PLANNING Plotting, Generating of Profile and Cross-section of Kitaha-Igpit (Adjusted to new elevation) July 12, 2024 100 July 12, 2024 Completed
 
4527 MARTURILLAS, JOHN LLOYD PLANNING Processing of Cross-section Lay-out of Kitaha-Igpit for modernization (expansion area) July 15, 2024 10 July 15, 2024 On-going
 
4528 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities July 15, 2024 100 July 15, 2024 Completed
 
4529 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for PRIS Modernization FSR Base on RIO Comments (Flood_Hazard_Map, Ground_Rupture,Ground_shaking,Tsunami_Hazard) July 8, 2024 100 July 8, 2024 COMPLETED
 
4530 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B_FY 2025) Station STA 0+046.92 - STA 1+394.26 (Profile Plan and Cross Sectioning) July 8, 2024 100 July 8, 2024 COMPLETED
 
4531 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce Engineering Documents July 8, 2024 100 July 8, 2024 COMPLETED
 
4532 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony July 8, 2024 100 July 8, 2024
 
4533 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for PRIS Modernization FSR Base on RIO Comments (Watershed Map of Padada,Land Classification (Expansion Area,Land_Slide_Hazard_Map) July 9, 2024 100 July 9, 2024 COMPLETED
 
4534 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B_FY 2025) Station STA STA 1+534.61 - STA 2+694.45 (Profile Plan and Cross Sectioning) July 9, 2024 100 July 9, 2024 COMPLETED
 
4535 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for PRIS Modernization FSR Base on RIO Comments (Volcanic Hazard Map,Liquefaction,Tenurial Maps with 3 Watershed boundaries) July 10, 2024 100 July 10, 2024 COMPLETED
 
4536 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B_FY 2025) Station STA STA STA 3+012.98 - STA 4+194.09 (Profile Plan and Cross Sectioning) July 10, 2024 100 July 10, 2024 COMPLETED
 
4537 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B_FY 2025) Station STA 4+215.93 - STA 5+577.22(Profile Plan and Cross Sectioning) July 11, 2024 70 July 11, 2024
 
4538 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW attachments July 11, 2024 100 July 11, 2024 COMPLETED
 
4539 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B_FY 2025) Station STA 5+709.51 - 6+784.96 (Profile Plan and Cross Sectioning) July 12, 2024 80 July 12, 2024
 
4540 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW attachments July 12, 2024 100 July 12, 2024 COMPLETED
 
4541 CUICO, JHO-ANN A. PLANNING Attend Flag Raising Ceremony July 15, 2024 100 July 15, 2024
 
4542 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B_FY 2025) Station STA 4+215.93 - STA 5+577.22(Profile Plan and Cross Sectioning) July 15, 2024 100 July 15, 2024 COMPLETED
 
4543 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B_FY 2025) Station STA 5+709.51 - 6+784.96 (Profile Plan and Cross Sectioning) July 16, 2024 100 July 16, 2024 COMPLETED
 
4544 EUGENIO, VENANN PLANNING Assist in the preparation of PDU presentation for ExeCom July 10, 2024 100 July 10, 2024 July 8: Process TOT applications; Prepare communication letter/transmittal; Assist clients/applicants for TOT; Contact applicants for LUC Certifications July 10: Prepare and submit IPCR
 
4545 EUGENIO, VENANN PLANNING Prepare shapefiles of applied areas for LUC for layout map attachment July 10, 2024 100 July 10, 2024 July 9: Process TOT and LUC applications; Assist clients/applicants for TOT; Contact applicants for LUC Certifications; Other related functions; 98% - Revise assisgned subsection on PRIS Modernization FSR as per CO and RIO Comments
 
4546 EUGENIO, VENANN PLANNING Plotting of applied areas for NIA Certification for Transfer of Title July 11, 2024 100 July 11, 2024 Other Accomplishments: Process LUC & TOT applications; Contact LUC Applicants; Prepare FY 2024 and FY 2025 Official List of Identified Priority Barangays for Development Intervention.
 
4547 EUGENIO, VENANN PLANNING Revise assisgned subsection on PRIS Modernization FSR as per CO and RIO Comments July 12, 2024 100 July 12, 2024 Other Accomplishments: Conduct inspection for LUC Application; Prepare shapefiles for CY 2023 SPIP location; Update layout map of Miral SRIS Inventory.
 
4548 EUGENIO, VENANN PLANNING Update proposed new stations for Miral SRIS IMT Contract July 15, 2024 100 July 15, 2024 Other Accomplishments: Prepare layout map for LUC attachment; Process LUC applications; Assist clients/applicants for LUC; 80% - Prepare Projected Area and Cost for Other Crops for PIMP 2023-2030; Other related functions.
 
4549 EUGENIO, VENANN PLANNING Generate watershed of Kibangay SPIP for the proposed 2 water sources July 16, 2024 100 July 16, 2024 Other Accomplishments: 100% - Prepare Projected Area and Cost for Other Crops for PIMP 2023-2030; Prepare IWR of Banana and Cacao for Kibangay SIP Source 2; Prepare IWR of Banana for Kibangay SIP Source 1; Other related functions.
 
4551 EUGENIO, VENANN PLANNING Prepare IWR of Corn, Cacao, and Durian for Kibangay SIP FSR July 17, 2024 100 July 17, 2024 Other Accomplishments: Process LUC applications
 
4552 EUGENIO, VENANN PLANNING Prepare IWR of Mango for Kibangay SIP FSR for Source 1 and 2 July 18, 2024 100 July 18, 2024 Other Accomplishments: Assist clients/applicants for LUC; Prepare data for SCS method of rainfall distribution analysis for Kibangay FSR.
 
4556 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony. July 8, 2024 100 July 8, 2024 Completed.
 
4557 SASUMAN, MARY LOUISE J. PLANNING Fill-out the LBP Oncoll Payment Slip for the payment of the online CNC of the proposed SIPs. July 8, 2024 100 July 8, 2024 Completed.
 
4558 SASUMAN, MARY LOUISE J. PLANNING Update the status of the online application of CNC for the proposed SIPs July 8, 2024 100 July 8, 2024 Completed.
 
4559 SASUMAN, MARY LOUISE J. PLANNING Plot to Google Earth the applied area for the Commercial Sand and Gravel (CSAG) application July 8, 2024 100 July 8, 2024 Completed.
 
4560 SASUMAN, MARY LOUISE J. PLANNING Coordinate with PENRO-LGU relative to the application of Government Gratuitous Permit for Padada RIS July 8, 2024 100 July 8, 2024 Completed.
 
4561 SASUMAN, MARY LOUISE J. PLANNING Attend Strategic Performance Management System (SPMS) Orientation at MTC Conference, Bolton St., Regional Office, Davao City July 9, 2024 100 July 9, 2024 Completed.
 
4562 SASUMAN, MARY LOUISE J. PLANNING Attend Strategic Performance Management System (SPMS) Orientation at MTC Conference, Bolton St., Regional Office, Davao City July 10, 2024 100 July 10, 2024 Completed.
 
4563 SASUMAN, MARY LOUISE J. PLANNING Prepare and submitted IPCR July 11, 2024 100 July 11, 2024 Completed.
 
4564 SASUMAN, MARY LOUISE J. PLANNING Coordinate and transmit the application of Government Gratuitous Permit for Padada RIS to PENRO-LGU July 11, 2024 100 July 11, 2024 Completed.
 
4565 SASUMAN, MARY LOUISE J. PLANNING Re-encode the letter of application for Government Gratuitous Permit from PENRO-LGU to Office of the Governor July 11, 2024 100 July 11, 2024 Completed.
 
4566 SASUMAN, MARY LOUISE J. PLANNING Follow-up and update the monitoring of Padada RIS Modernization FSR per Discipline July 11, 2024 100 July 11, 2024 Completed.
 
4567 SASUMAN, MARY LOUISE J. PLANNING Plot to Google Earth the applied area for CSAG and Prepared Certification for Commercial Sand and Gravel (CSAG) July 12, 2024 100 July 12, 2024 Completed.
 
4568 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter for DENR-PENRO Occidental re: Inquiry Regarding the Tenurial Instrument Status of Basiawan Small Pump Irrigation Project (SPIP) July 12, 2024 100 July 12, 2024 Completed.
 
4569 SASUMAN, MARY LOUISE J. PLANNING Prepare letter for the contract extension of the PDU COS/JO personnel July 12, 2024 100 July 12, 2024 Completed.
 
4570 SASUMAN, MARY LOUISE J. PLANNING Prepare the write-ups of Kibangay FSR, specifically, Chapter 6: Geology July 12, 2024 100 July 12, 2024 Completed.
 
4571 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony. July 15, 2024 100 July 15, 2024 Completed.
 
4572 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter re: Request for the Conduct of Georesistivity Survey for the Proposed Pump Irrigation Projects (PIPs). July 15, 2024 100 July 15, 2024 Completed.
 
4573 SASUMAN, MARY LOUISE J. PLANNING Update the status of the online application of CNC for the proposed SIPs. July 15, 2024 100 July 15, 2024 Completed.
 
4574 SASUMAN, MARY LOUISE J. PLANNING Follow-up and update the monitoring of Padada RIS Modernization FSR per Discipline July 15, 2024 100 July 15, 2024 Completed.
 
4575 SASUMAN, MARY LOUISE J. PLANNING Conduct and assist the establishment of permanent markers of completed boreholes in Cogon Bacaca SRIP July 16, 2024 100 July 16, 2024 Completed.
 
4576 SASUMAN, MARY LOUISE J. PLANNING Prepare DTRs and WARs for the period of July 1-15, 2024 July 17, 2024 100 July 17, 2024 Completed.
 
4577 SASUMAN, MARY LOUISE J. PLANNING Tabulate and download the approved CNC of San Miguel SIP and Sinawilan SIP. July 17, 2024 100 July 17, 2024 Completed.
 
4578 SASUMAN, MARY LOUISE J. PLANNING E-mail DENR-PENRO Davao Occidental relative to Tenurial Instrument Status of Basiawan SPIP. July 17, 2024 100 July 17, 2024 Completed.
 
4579 SASUMAN, MARY LOUISE J. PLANNING Prepare Kibangay FSR, specifically, Chapter 9: Environmental and Social. July 17, 2024 95 July 17, 2024 On-going finalization of Chapter 9.
 
4580 SASUMAN, MARY LOUISE J. PLANNING Prepare and print Individual Statement of Overtime Work for the period July 19-20, 2024. July 18, 2024 100 July 18, 2024 Completed.
 
4581 SASUMAN, MARY LOUISE J. PLANNING Prepare Commercial Sand and Gravel (CSAG) Certification. July 18, 2024 100 July 18, 2024 Completed.
 
4582 SASUMAN, MARY LOUISE J. PLANNING Entertain and assist clients for CSAG application July 18, 2024 100 July 18, 2024 Completed.
 
4583 SASUMAN, MARY LOUISE J. PLANNING Finalize Kibangay SIP write-ups (Chapters 6 and 9). July 18, 2024 100 July 18, 2024 Completed.
 
4584 INTO, LEE WARREN PLANNING Worked on Padada RIS Irrigation Networks (Existing System) July 19, 2024 50 July 19, 2024 Plotted of Service Areas per Turn-Out structure of Main Canal, Lateral AA, Lateral A, Lateral B, Lateral B4 and Lateral B3-A
 
4585 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW attachments July 16, 2024 100 July 16, 2024 COMPLETED: CY 2024 PROGRAM Lateral Pipeline Sta.: 0+000.00 - 0+51472, Road Concreting Sta.: 0+000.00 - 0+382.00, Road Surfacing Sta.: 0+0382.00 - 0+984.56, Main Pipelines Sta.: 2+396.46 - 3+282.72
 
4586 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B_FY 2025) Station STA 6+805.90 - 7+160.34 (Profile Plan and Cross Sectioning) July 17, 2024 100 July 17, 2024 COMPLETED
 
4587 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection at Padada RIS plantation sites. July 19, 2024 100 July 19, 2024 Completed. Other accomplishments: - Oversee foliar & insecticide application at Malabang plantation sites. - Facilitated digging of canal in front of PRIS nursery to minimize stagnant water within. - Formulated Year 3 Annual Plan for IWRMP of PRIS and
 
4588 LUARDO, GLENN D. PLANNING Attend and participate in the updating of PPMP for 2nd Sem. for CY 2024 of Planning and design Unit. July 11, 2024 100 July 11, 2024
 
4589 LUARDO, GLENN D. PLANNING Prepare PPMP for FSDE funded project for Planning and Design Unit for 2nd Sem. of CY 2024. July 12, 2024 100 July 12, 2024 Other Accomplishment: Revised EIRR of FS of Padada RIS Modernization CY 2023 (30%).
 
4590 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony July 15, 2024 100 July 15, 2024
 
4591 LUARDO, GLENN D. PLANNING Prepare PPMP CSE for Office Supplies of Planning and Design Unit. July 17, 2024 100 July 17, 2024 On July 16, 2024, Revised EIRR of FS of Padada RIS Modernization CY 2023 (75%). Consolidate Feasibility Study report of the proposed Kibangay SIP project (30%).
 
4592 LUARDO, GLENN D. PLANNING Prepare Drainage Shp file and update Potential Service Area of the proposed Kibangay SIP project. July 15, 2024 100 July 15, 2024 Other accomplishment: Prepared PPMP CSE for Office Supplies of Planning and Design Unit (50%).
 
4593 LUARDO, GLENN D. PLANNING Consolidate and Print Feasibility Study report of the proposed Kibangay SIP project. July 19, 2024 90 July 19, 2024 On July 18, 2024, Revised EIRR of FS of Padada RIS Modernization CY 2023 and update tables and write-ups (100%). Consolidate Feasibility Study report of the proposed Kibangay SIP project (70%).
 
4594 LUARDO, GLENN D. PLANNING Attend 3rd quarterly Provincial Statistics committee meeting at the Davao del Sur Sports Complex Conference Hall. July 17, 2024 100 July 17, 2024
 
4595 CAYABYAB, REY JIM PLANNING Draft a communication letter to Davao del Sur PNP Provincial Director July 8, 2024 100 July 8, 2024
 
4596 CAYABYAB, REY JIM PLANNING Prepare list of projects for FY 2024 Regular and Additional July 8, 2024 100 July 8, 2024
 
4597 CAYABYAB, REY JIM PLANNING Prepare write-ups on Recommended Farm Practices for mango, banana, durian, cacao, and corn for Kibangay SIP FSR July 9, 2024 100 July 9, 2024
 
4598 CAYABYAB, REY JIM PLANNING Prepare Land Acquisition and Resettlement Framework (LARF) for Kibangay SIP FSR July 10, 2024 100 July 10, 2024
 
4600 CAYABYAB, REY JIM PLANNING Prepare cost estimate for Padada RIS FSR on the additional work items on Sacub dam apron rehabilitation July 11, 2024 100 N/A Other Accomplishments: Prepared list of projects for the identified priority barangays of FY 2024 and 2025. Prepared list of additional projects (70M) for FY 2024
 
4605 CAYABYAB, REY JIM PLANNING Comply to RIO comment on Padada RIS FSR Chapter 3.1 Existing hydraulic structures July 12, 2024 100 July 12, 2024
 
4607 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents July 17, 2024 100 July 17, 2024 COMPLETED
 
4608 CAYABYAB, REY JIM PLANNING Prepare cost estimate of access and service roads for system expansion of Padada RIS FSR July 15, 2024 100 July 15, 2024
 
4609 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Input Details to LOGBOOK LUC Tracker July 17, 2024 100 July 17, 2024 COMPLETED
 
4613 INTO, LEE WARREN PLANNING Continue working on Padada RIS Irrigation Networks (Existing System) July 20, 2024 55 July 20, 2024 Plotted all service areas of the whole system and parceled the whole area, which is too big to fit in one sheet, into 8 sheets and is now ready for the network delineations.
 
4614 CUICO, JHO-ANN A. PLANNING Prepared PADADA RIS Modernization FSR compliance to the recommendation as per RIO Comments July 18, 2024 100 July 18, 2024 COMPLETED: Prepared Layout Maps of Figure 6.2. 1. NAMRIA Control Points, Figure 6.3. 6. Control Network Map
 
4615 CAYABYAB, REY JIM PLANNING Prepare Irrigation and Drainage plan and profile of Kitaha Creek (system expansion) for Padada RIS Modernization FSR July 16, 2024 100 July 16, 2024
 
4617 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps for POW attachments July 18, 2024 100 July 18, 2024 COPLETED: PADADA RIS Cy 2024 Program (1 Unit Sabo Dam, PROTECTION WORKS: Upstream (Left and Right) 0+000.00 - 1+553.82, Downstream (Left and Right) 0+000.00 - 2+496.28
 
4622 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents July 18, 2024 100 July 18, 2024 COMPLETED
 
4624 CUICO, JHO-ANN A. PLANNING Prepared Layout Maps of PRE - FS (Kibangay SIP July 19, 2024 100 July 19, 2024 COMPLETED: Preliminary Base Map, CADTs Area Map, Topographic Map, Land Use Map, Volcanic Hazard Map, Drainage Map
 
4630 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents July 19, 2024 100 July 19, 2024 COMPLETED
 
4631 CUICO, JHO-ANN A. PLANNING Prepared PADADA RIS Modernization FSR compliance to the recommendation as per RIO Comments July 19, 2024 100 July 19, 2024 COMPLETED: Figure 6.3.8. Topographic Map, Figure 6.6.1. General Layout of Padada RIS
 
4634 MARTURILLAS, JOHN LLOYD PLANNING Processing of Cross-section Lay-out of Kitaha-Igpit for modernization (expansion area) July 16, 2024 50 July 16, 2024 On-going
 
4635 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities July 16, 2024 100 July 16, 2024 Completed
 
4636 MARTURILLAS, JOHN LLOYD PLANNING Processing of Cross-section Lay-out of Kitaha-Igpit for modernization (expansion area) July 17, 2024 100 July 17, 2024 Completed
 
4637 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities July 17, 2024 100 July 17, 2024 Completed
 
4638 MARTURILLAS, JOHN LLOYD PLANNING Processing of Profile Lay-out of Kitaha-Igpit for modernization (expansion area) July 17, 2024 20 July 17, 2024 On-going
 
4639 MARTURILLAS, JOHN LLOYD PLANNING Processing of Profile Lay-out of Kitaha-Igpit for modernization (expansion area) July 18, 2024 100 July 18, 2024 Completed
 
4641 MARTURILLAS, JOHN LLOYD PLANNING Check and Revised PRIS modernization comments for Surveying July 18, 2024 100 July 18, 2024 Completed
 
4642 HERNAN, ALDEN PLANNING DED of Cogon Bacaca SRIP LATERAL D1 CANALIZATION (0+000.00-2+418.23) July 16, 2024 100 July 16, 2024 Design of Canalization and Canal Structures submitted to Engr. Vencilao for Checking
 
4643 HERNAN, ALDEN PLANNING Continue in the DED of Cogon Bacaca SRIP Lat. B Canalization and Canal Structures as per corrected by Engr. Vencilao July 18, 2024 100 July 18, 2024 Submitted to Engr. Vencilao for Checking
 
4644 HERNAN, ALDEN PLANNING Continue in the Design of Cogon Bacaca SRIP Lat. B1 as per corrected by Engr. Vencilao July 19, 2024 37 July 19, 2024 on-going
 
4650 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 8 Land use applications July 18, 2024 100 July 18, 2024 Completed
 
4664 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 22, 2024 100 July 22, 2024 - Attended flag raising ceremony. - Oversee nursery activities at PRIS. - Facilitated foliar/insecticide application at Brgy. Clib.
 
4665 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 23, 2024 100 July 23, 2024 - Oversee round weeding at plantation sites and facilitated foliar/insecticide application at Brgy. Malabang sites.
 
4666 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 24, 2024 100 July 24, 2024 - Drafted IWRMP Progress Report. - Site monitored and inventory of plants at Brgy Malabang.
 
4667 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 25, 2024 100 July 25, 2024 - Submitted July IWRMP Progress Report. - Facilitated foliar/insecticide application at Mahayahay sites. - Backfilling within PRIS nursery.
 
4668 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 26, 2024 100 July 26, 2024 - Site visited Padada and Mal RIS nursery/sites. - Facilitated round weeding and inventory at Brgy. Langa-an and San Miguel, Matanao sites.
 
4682 ESPADERA, MA LOURDES PLANNING Conducted Control Survey (Static Observation) at Suawan SRIP (4 Controls) July 22, 2024 100 July 22, 2024 Accomplishment at 60%
 
4683 ESPADERA, MA LOURDES PLANNING Conducted Control Survey (Static Observation) at Suawan SRIP (8 Controls) July 23, 2024 100 July 23, 2024 Accomplishment at 74%
 
4684 ESPADERA, MA LOURDES PLANNING Conducted Control Survey (Static Observation) at Suawan SRIP (8 Controls) July 24, 2024 100 July 24, 2024 Accomplishment at 88%
 
4685 ESPADERA, MA LOURDES PLANNING Conducted Control Survey (Static Observation) at Suawan SRIP (7 Controls) July 25, 2024 100 July 25, 2024 Accomplishment at 100%
 
4713 INTO, LEE WARREN PLANNING Conducted a site visit at the Padada RIS NIA Office for the verification of geometric measurements and other related data for the renovation plan. July 26, 2024 100 July 26, 2024 Confirmed few errors on the renovation drafts. Included set backs from road. Took geotagged pictures.
 
4714 INTO, LEE WARREN PLANNING Continued Working on the Irrigation Network of the Existing Areas of Padada RIS. July 22, 2024 57 July 27, 2024 Partially plotted Sacub Irrigation network.
 
4715 INTO, LEE WARREN PLANNING Attend Flag Ceremony. July 22, 2024 100 July 22, 2024 Attended on time.
 
4716 INTO, LEE WARREN PLANNING Worked on the Padada RIS Office Renovation Plan. July 23, 2024 50 July 23, 2024 Polished the draft of Maam Crissa. Added Site Development plan showing the components to be demolished. Added Vicinity Map. Added electrical plan.
 
4717 INTO, LEE WARREN PLANNING Continued Working on Padada RIS Renovation Plan. July 24, 2024 90 July 24, 2024 Finalized and submitted renovation plan with transmittal for signature by IMO Manager.
 
4718 INTO, LEE WARREN PLANNING Drafted a barrage-type dam in replacement for the last design on the expansion area of Padada RIS Modernization. July 25, 2024 25 July 27, 2024 Gathered similar designs. On-going drafting. Paused due to reprioritization of the submitted renovation plan to IMO Manager which was not signed due to few comments and recommendations.
 
4719 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities July 22, 2024 100 July 22, 2024 Completed
 
4720 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Pantang CIS survey data July 22, 2024 100 July 22, 2024 Completed
 
4721 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Dam, Generated profile and cross-section of Pantang CIS riverbed downstream 0+617.43 July 23, 2024 100 July 23, 2024 Completed
 
4722 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Upper Cabasagan CIS July 23, 2024 100 July 23, 2024 Completed
 
4723 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Dam. Generated profile and cross-section of Upper Cabasagan CIS 1+136.32m July 24, 2024 100 July 24, 2024 Completed
 
4724 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Parat DAM riverbed downstream July 24, 2024 100 July 24, 2024 Completed
 
4725 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities July 24, 2024 100 July 24, 2024 Completed
 
4726 MARTURILLAS, JOHN LLOYD PLANNING Plotted 1 LUC applications July 24, 2024 100 July 24, 2024 Completed
 
4727 MARTURILLAS, JOHN LLOYD PLANNING Plotting, Generating of Profile and Cross-section of Laral Main canal 0+562m and Creek 0+312.37m July 25, 2024 100 July 25, 2024 Completed
 
4728 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities July 25, 2024 100 July 25, 2024 Completed
 
4729 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities July 26, 2024 100 July 26, 2024 Completed
 
4730 MARTURILLAS, JOHN LLOYD PLANNING Plotting and generating of profile and cross-section of Parat dam riverbed 1+252.53 July 26, 2024 100 July 26, 2024 Completed
 
4738 CUICO, JHO-ANN A. PLANNING Attended flag raising ceremony July 22, 2024 100 July 22, 2024 COMPLETED
 
4739 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents July 22, 2024 100 July 22, 2024 COMPLETED
 
4740 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Input Details to LOGBOOK LUC Tracker July 22, 2024 100 July 22, 2024 COMPLETED
 
4741 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B2_FY 2025) (Profile Plan and Cross Sectioning) July 22, 2024 20 July 22, 2024
 
4742 CUICO, JHO-ANN A. PLANNING Supported Sand and Gravel Application / Releasing of Certifications July 23, 2024 100 July 23, 2024 COMPLETED
 
4743 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Input Details to LOGBOOK LUC Tracker July 23, 2024 100 July 23, 2024 COMPLETED
 
4744 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce engineering Documents July 23, 2024 100 July 23, 2024 COMPLETED
 
4745 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B2_FY 2025) (Profile Plan and Cross Sectioning) July 23, 2024 40 July 23, 2024
 
4746 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW, PCR and Turn-over Attachments July 23, 2024 100 July 23, 2024 COMPLETED: MAL RIS-Additional Fund - 50Million, 1 unit Sabo Dam, PROTECTION WORKS: Downstream at SFIAM Dam (R/S) 0+037.36 - 0+142.92 and L/S 0+055.72 - 0+142.92
 
4747 CUICO, JHO-ANN A. PLANNING Supported Sand and Gravel Application / Releasing of Certifications July 24, 2024 100 July 24, 2024 COMPLETED
 
4748 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Input Details to LOGBOOK LUC Tracker July 24, 2024 100 July 24, 2024 COMPLETED
 
4749 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B2_FY 2025) (Profile Plan and Cross Sectioning) July 24, 2024 60 July 24, 2024
 
4750 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW, PCR and Turn-over Attachments July 24, 2024 100 July 24, 2024 COMPLETED: Padada RIS - 3 Million - Capital Outlay Building Works, Plumbing Works, Electrical Works (PADADA RIS OFFICE)
 
4751 CUICO, JHO-ANN A. PLANNING Supported Sand and Gravel Application / Releasing of Certifications July 25, 2024 100 July 25, 2024 COMPLETED
 
4752 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW, PCR and Turn-over Attachments July 25, 2024 100 July 25, 2024 COMPLETED: PADADA RIS - 50Million - PROTECTION DIKE - Downstream (R/S) 0+412.50 0+578.57, L/S 0+412.50 0+578.57, SK Lateral A1 (Elevated Flume) Sta: 0+030.00 - 0+060.00
 
4754 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B2_FY 2025) (Profile Plan and Cross Sectioning) July 25, 2024 80 July 25, 2024
 
4758 SASUMAN, MARY LOUISE J. PLANNING Finalize the consolidation of Annexes for PRIS Modernization FSR. July 22, 2024 100 July 22, 2024 Completed. Other accomplishment: Attended flag raising ceremony.
 
4759 SASUMAN, MARY LOUISE J. PLANNING Plot and delineate the area applied for CSAG in Davao Occidental. July 23, 2024 100 July 23, 2024 Completed.
 
4760 SASUMAN, MARY LOUISE J. PLANNING Conduct detailed geologic mapping in Cogon Bacaca SRIP with RIO Geologists. July 24, 2024 100 July 24, 2024 Completed.
 
4761 SASUMAN, MARY LOUISE J. PLANNING Conduct detailed geologic mapping in Cogon Bacaca SRIP with RIO Geologists. July 25, 2024 100 July 25, 2024 Completed.
 
4762 SASUMAN, MARY LOUISE J. PLANNING Conduct detailed geologic mapping in Cogon Bacaca SRIP with RIO Geologists. July 26, 2024 100 July 26, 2024 Completed.
 
4763 SASUMAN, MARY LOUISE J. PLANNING Prepare certifications for Commercial Sand and Gravel. July 26, 2024 100 July 26, 2024 Completed.
 
4764 CAYABYAB, REY JIM PLANNING Prepare communication letter to PARCCOM Davao Occidental re: Project Identification at Brgy. Lacaron, Malita, Davao Occidental July 17, 2024 100 July 17, 2024
 
4768 CAYABYAB, REY JIM PLANNING Prepare irrigation network of the existing systems of Padada RIS for the Modernization FSR July 20, 2024 55 July 20, 2024 Drafted irrigation network of SMIA, Main Canal, Lat. AA, Lat. B1 and portion of Lat. A, Lat. B, & Lat. B2 (5/9 sheets)
 
4769 CAYABYAB, REY JIM PLANNING Carried on drafting irrigation network of the existing systems of Padada RIS for Modernization FSR July 26, 2024 80 July 26, 2024 Drafted irrigation network of the remaining portion of Lat. A, Lat. A1, Lat. B, Lat. B2, Lat. B3
 
4770 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony July 22, 2024 100 July 22, 2024
 
4771 CAYABYAB, REY JIM PLANNING Draft communication letter to CENRO-Malalag re: List of affected trees for the proposed Cogon-Bacaca SRIP subjected for current market values July 25, 2024 100 July 25, 2024
 
4772 LUARDO, GLENN D. PLANNING Consolidate and Print Feasibility Study report of the proposed Kibangay SIP project. July 22, 2024 100 July 22, 2024 Other Accomplishment: Consolidate, print and bind data gathered from BIR and DENR regarding the Zonal and Crops Value in reference to Land Acquisition and Resettlement Framework/Plan for the proposed Irrigation Projects (100%).
 
4773 CAYABYAB, REY JIM PLANNING Attend virtual regular PMRB meeting July 26, 2024 100 July 26, 2024
 
4775 LUARDO, GLENN D. PLANNING Prepare Feasibility Study Report for the Proposed Talomo River - Dacudao PIP (Tables for Population & Projected labor force, Price Structure of Rice, Urea, Potassium and Phosporous). July 23, 2024 100 July 23, 2024
 
4776 LUARDO, GLENN D. PLANNING Prepare Feasibility Study Report for the Proposed Talomo River - Dacudao PIP (Tables for Rice price assumption, Production Cost per hectare of Rice and NPV @ Full Development). July 24, 2024 100 July 24, 2024 Other accomplishment: Prepared Shp files for the proposed Damsites and Service Area for the FS Report of the Proposed Talomo River - Dacudao PIP Project (100%). Other Accomplishments: Prepared 3 PR for the PDU & submitted to the Property Unit (100%), Prep
 
4777 LUARDO, GLENN D. PLANNING Prepare Feasibility Study Report for the Proposed Talomo River - Dacudao PIP (Tables for Present and Future without project and Future with project). July 25, 2024 100 July 25, 2024 Other Accomplishments: Prepared report on the conducted site inspection in Balingaeng CIS & submitted to O&M (100%). Consolidate documents regarding the conducted water calibration on the tributaries of the Don Mariano CIS and submitted to O&M (100%).
 
4778 LUARDO, GLENN D. PLANNING Prepare Feasibility Study Report for the Proposed Talomo River - Dacudao PIP (Shp files for Present and Future Land use). July 26, 2024 80 July 26, 2024 Other Accomplishments: Prepared 3 PR for the PDU & submitted to the Property Unit (100%), Prepared 5 Requisition for the PDU equipment (100%). Facilitated the releasing of Certification for LUC Applicant (100%).
 
4779 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW, PCR and Turn-over Attachments July 26, 2024 100 July 26, 2024 COMPLETED: Mal RIS - 347,730.88 - CANALIZATION WORKS - MAIN CANAL: 0+601.35 - 0+615.75 & 0+732.96 - 0+748.45, LATERAL A (RMC) - 0+753.48 - 0+788.48
 
4780 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents July 26, 2024 100 July 26, 2024 COMPLETED
 
4781 CUICO, JHO-ANN A. PLANNING Drafted FY 2025 (PADADA RIS Lateral B2_FY 2025) (Profile Plan and Cross Sectioning) July 26, 2024 95 July 26, 2024
 
4782 HERNAN, ALDEN PLANNING Continue the design of Cogon Bacaca Canal Structures at Lat. B1 and D1 July 24, 2024 100 July 24, 2024 design completed, For drafting
 
4783 HERNAN, ALDEN PLANNING Continue the design of Cogon Bacaca Canal Structures at Lat. B1 July 26, 2024 100 July 26, 2024 Design completed, For drafting
 
4784 EUGENIO, VENANN PLANNING Fill-up PDD form of propose Pre-FS, FS, & DE projects July 22, 2024 100 July 22, 2024 Other Accomplishments: Attend flag raising ceremony; Process TOT and LUC applications; Prepare layout map for LUC attachment; Assist clients/applicants for TOT and LUC; Other related functions
 
4785 EUGENIO, VENANN PLANNING Prepare and submit kmz/kml files of FY 2025 proposed projects July 23, 2024 100 July 23, 2024 Other Accomplishments: Prepare shapefiles of applied areas for LUC layout map attachment; Process TOT and LUC applications; Prepare layout map for LUC attachment; Assist clients/applicants for TOT and LUC; Other related functions
 
4786 EUGENIO, VENANN PLANNING Assist in the Conduct of Inspection at Tanwalang SIP regarding the request of greenhope agri-development corp. July 24, 2024 100 July 24, 2024 Other Accomplishments: Prepare shapefiles of applied areas for LUC layout map attachment; Process TOT and LUC applications; Assist clients/applicants for TOT and LUC; Other related functions
 
4787 EUGENIO, VENANN PLANNING Prepare recommendation report regarding the conducted inspection at Tanwalang SIP July 25, 2024 100 July 25, 2024 Other Accomplishments: Prepare transmittal; Process TOT and LUC applications; Prepare layout map for LUC attachment; Assist clients/applicants for TOT and LUC; Prepare shapefiles of applied areas for LUC layout map attachment
 
4788 EUGENIO, VENANN PLANNING Conduct inspection for LUC application at Sulop July 26, 2024 100 July 26, 2024 Other Accomplishments: Assist clients/applicants for TOT and LUC; Prepare transmittal; Prepare layout map for LUC attachment; Prepare shapefiles of applied areas for LUC layout map attachment; Attend PSB interview
 
4823 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 29, 2024 100 July 29, 2024 Other activities: - Attended flag raising ceremony. - Oversee nursery activities at PRIS.
 
4824 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 30, 2024 100 July 30, 2024 Other activities: - Monitored nursery activities. - Oversee field work activities (round weeding, foliar/insecticide application).
 
4825 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. July 31, 2024 100 July 31, 2024 Other accomplishments: - Oversee field work activities (round weeding, foliar/insecticide application). - Planted collected cuttings at PRIS nursery. - Collection of DTRs of the nursery personnel.
 
4827 CUICO, JHO-ANN A. PLANNING Drafted of FY 2025 PADADA RIS Lateral B2 and Polishing, printing of FY 2025 PADADA RIS Lateral B July 27, 2024 100 July 27, 2024 COMPLETED: Lateral B2 Already submitted to ate Athena for final checking, Lateral B Already submitted to RIO for final checking
 
4828 CUICO, JHO-ANN A. PLANNING Drafted of FY 2025 PADADA RIS Main Canal July 29, 2024 30 July 29, 2024
 
4829 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents July 29, 2024 100 July 29, 2024 COMPLETED
 
4830 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW, PCR and Turn-over Attachments July 29, 2024 100 July 29, 2024 COMPLETED
 
4831 CUICO, JHO-ANN A. PLANNING Drafted of FY 2025 PADADA RIS Main Canal July 30, 2024 50 July 30, 2024
 
4832 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents July 30, 2024 100 July 30, 2024 COMPLETED
 
4833 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW, PCR and Turn-over Attachments July 30, 2024 100 July 30, 2024 COMPLETED
 
4834 CUICO, JHO-ANN A. PLANNING Drafted of FY 2025 PADADA RIS Main Canal July 31, 2024 70 July 31, 2024
 
4835 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents July 31, 2024 100 July 31, 2024 COMPLETED
 
4836 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW, PCR and Turn-over Attachments July 31, 2024 100 July 31, 2024 COMPLETED
 
4839 ESPADERA, MA LOURDES PLANNING Plotted Mal RIS - Gomitoyum Dam (CY 2024 Additional) July 29, 2024 100 July 29, 2024
 
4840 ESPADERA, MA LOURDES PLANNING Printed Profile of Padada RIS Riverbed July 30, 2024 100 July 30, 2024
 
4841 ESPADERA, MA LOURDES PLANNING Processing of Static Observed Data to Rinex Data July 30, 2024 100 July 30, 2024
 
4842 ESPADERA, MA LOURDES PLANNING Plotted Lower Marber CIS (FY 2025) July 30, 2024 50 July 30, 2024 No data at Dam Inventory
 
4843 ESPADERA, MA LOURDES PLANNING Assist in the preparation for the IAS Audit July 31, 2024 100 July 31, 2024
 
4844 ESPADERA, MA LOURDES PLANNING Plotted 6 Applied Area for LUC July 31, 2024 100 July 31, 2024
 
4845 ESPADERA, MA LOURDES PLANNING Potted Padada RIS - Lateral B4 Additional Data (Modernization) July 31, 2024 100 July 31, 2024 20% Accomplishment
 
4846 ESPADERA, MA LOURDES PLANNING Miscellaneous: Prepare Survey Team Travel Documents Follow up - Calibration and Retrieval of radio at PPU July 31, 2024 100 July 31, 2024
 
4848 INTO, LEE WARREN PLANNING Work on Padada RIS Office Renovation DED July 31, 2024 95 July 31, 2024 July 29 - Crafted as-built of existing layout of the office and made a demolition plan to emphasize the retained structures. July 30 - revised all sheets affected by the verified geometrical measurements. July 31 - added PWD Ramps and changed CR to T&B. P
 
4851 INTO, LEE WARREN PLANNING Encoded the trimmed listing of projects for FY 2025 in OPAIPBP July 31, 2024 25 July 31, 2024 Pre-encoded all projects. Other details like descriptions, coordinates and indicators are to be verified.
 
4870 INTO, LEE WARREN PLANNING Costing of FSDE Funds (July 29-Aug 2) August 2, 2024 100 August 2, 2024 Completed.
 
4871 INTO, LEE WARREN PLANNING Gather IA Resolutions for Projects under Repair - CIS of FY 2025. August 1, 2024 100 August 1, 2024 Completed.
 
4872 INTO, LEE WARREN PLANNING Worked on few corrections from RIO regarding the Mal RIS ISFIAM Sabo Dam. August 1, 2024 100 August 1, 2024 Removed baffled blocks as per RIOs concern regarding its possibility of causing extreme siltation which may lead to water overtopping the top berm of the protection dike.
 
4874 INTO, LEE WARREN PLANNING Polish and Finalize the Padada RIS Office DED. August 2, 2024 100 August 2, 2024 Added lintel beam over roof beam between Bay 5 & 4. Added 2nd PWD Ramp. Rendered the perspective using Sketchup and Vray. Printed DED with transmittal.
 
4878 INTO, LEE WARREN PLANNING Printing of Sacub Lateral A Flume and Protection Dike. August 2, 2024 100 August 2, 2024 Printed with transmittal.
 
4883 INTO, LEE WARREN PLANNING Final encoding of FY 2025 projects in OPAIPBP. August 1, 2024 100 August 1, 2024 Completed.
 
4888 INTO, LEE WARREN PLANNING Prepared Funding Requirement of personnel charged to FSDE. (August to December 2024) August 3, 2024 100 August 3, 2024 Completed.
 
4889 CUICO, JHO-ANN A. PLANNING Drafted of FY 2025 PADADA RIS Main Canal August 1, 2024 100 August 1, 2024 COMPLETED
 
4890 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW, PCR and Turn-over Attachments August 1, 2024 100 August 1, 2024 COMPLETED
 
4891 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Input Details to LOGBOOK LUC Tracker August 1, 2024 100 August 1, 2024 COMPLETED
 
4892 EUGENIO, VENANN PLANNING Generate Catchment Area/Drainage Area of Balawanan SRIP and Matanao-Balabag SRIP August 1, 2024 100 July 31, 2024 Other accomplishments this week: Process LUC & TOT applications; Conduct discharge measurement at Mal RIS and Don Mariano CIS; Delineate and layout validated potential areas of San Jose SIP.
 
4893 EUGENIO, VENANN PLANNING Prepare FY 2026 AIP August 2, 2024 100 August 2, 2024 Other accomplishments this week: Prepare shapefiles of applied areas for LUC layout map attachment; Prepare layout map for LUC attachment; Prepare communication letter.
 
4894 MARTURILLAS, JOHN LLOYD PLANNING Leveling at Suawan SRIP (2 controls) July 29, 2024 100 July 29, 2024 Completed
 
4895 MARTURILLAS, JOHN LLOYD PLANNING Leveling at Suawan SRIP (4 controls) July 30, 2024 100 July 30, 2024 Completed
 
4896 MARTURILLAS, JOHN LLOYD PLANNING Leveling at Suawan SRIP (4 controls) July 31, 2024 100 July 31, 2024 Completed
 
4897 MARTURILLAS, JOHN LLOYD PLANNING Leveling at Suawan SRIP (6 controls) August 1, 2024 100 August 1, 2024 Completed
 
4898 MARTURILLAS, JOHN LLOYD PLANNING Leveling at Suawan SRIP (4 controls) August 2, 2024 100 August 2, 2024 Completed
 
4899 CAYABYAB, REY JIM PLANNING Carried on drafting irrigation network of the existing systems of Padada RIS for Modernization FSR August 2, 2024 90 August 2, 2024 Drafted irrigation network of Parat RMC & LMC, SKMC & SKLA
 
4900 CAYABYAB, REY JIM PLANNING Prepare irrigation network of the proposed expansion area of Padada RIS for the Modernization FSR August 2, 2024 95 August 2, 2024
 
4901 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. August 1, 2024 100 August 1, 2024 Conducted foliar/Insecticide application at PRIS area in Brgy. Langa-an and San Miguel, Matanao.
 
4902 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. August 2, 2024 100 August 2, 2024 Completed. Other accomplishment: - Facilitate collection of plastic bottles for the use of PRIS nursery. - Oversee PRIS office clearing.
 
4903 ESPADERA, MA LOURDES PLANNING Prepare Payroll for JO Personnel August 1, 2024 100 August 1, 2024
 
4904 ESPADERA, MA LOURDES PLANNING Prepare own DTR and WAR August 1, 2024 100 August 1, 2024
 
4905 ESPADERA, MA LOURDES PLANNING Check Survey Team DTRs and WARs and Prepare attachments August 1, 2024 100 August 1, 2024
 
4906 SASUMAN, MARY LOUISE J. PLANNING Prepare and submit for signature eight (8) certifications for Commercial Sand and Gravel (CSAG) July 29, 2024 100 July 29, 2024 Completed.
 
4907 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter relative to the request the representation of the designated RIO personnel for the meeting on the Cogon Bacaca SRIP update July 29, 2024 100 July 29, 2024 Completed.
 
4908 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter relative to the letter of inquiry to EMB on the type of documents will be complied for the 26 solar powered pumps July 30, 2024 100 July 30, 2024 Completed.
 
4909 SASUMAN, MARY LOUISE J. PLANNING Revise the Kibangay PIP FSR as per comments made by the PDU Head July 30, 2024 100 July 30, 2024 Completed.
 
4910 SASUMAN, MARY LOUISE J. PLANNING Draft communication letter relative for the project identification July 30, 2024 100 July 30, 2024 Completed.
 
4911 SASUMAN, MARY LOUISE J. PLANNING Finalize the comments on the action taken by the office on the PRIS Modernization FSR July 31, 2024 100 July 31, 2024 Completed.
 
4912 SASUMAN, MARY LOUISE J. PLANNING Finalize and print the Kibangay PIP FS Report and Kibangay PIP LARF July 31, 2024 100 July 31, 2024 Completed.
 
4913 SASUMAN, MARY LOUISE J. PLANNING Update the requested documents from RIO relative on the List of Projects with pending DENR- and NCIP- related Permit/Clearance Applications. July 31, 2024 100 July 31, 2024 Completed.
 
4914 SASUMAN, MARY LOUISE J. PLANNING Coordinate and communicate with DENR-EMB personnel relative to the status of Cogon Bacaca ECC application July 31, 2024 100 July 31, 2024 Completed.
 
4915 CUICO, JHO-ANN A. PLANNING Polishing and Printing of Lateral B2 and Lateral B Detailed Engineering Design of FY 2025 August 2, 2024 100 August 2, 2024 COMPLETED
 
4916 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW, PCR and Turn-over Attachments August 2, 2024 100 August 2, 2024 COMPLETED
 
4917 SASUMAN, MARY LOUISE J. PLANNING Prepare and submit BTOR on the conducted detailed geologic mapping in Cogon Bacaca SRIP August 1, 2024 100 August 1, 2024 Completed.
 
4918 CUICO, JHO-ANN A. PLANNING Received LUC Documents, Input Details to LOGBOOK LUC Tracker August 2, 2024 100 August 2, 2024 COMPLETED
 
4919 SASUMAN, MARY LOUISE J. PLANNING Assist and entertain client for CSAG Application August 1, 2024 100 August 1, 2024 Completed.
 
4920 HERNAN, ALDEN PLANNING Draft Cogon Bacaca rd. X-ing structure (sta. 0+035.92) July 30, 2024 100 July 30, 2024 completed. Inserted work (07/29/24 - prepare Cogon Bacaca Srip DED accomplishment summary)
 
4921 SASUMAN, MARY LOUISE J. PLANNING Issue to clients the certification of Commercial Sand and Gravel (CSAG) August 1, 2024 100 August 1, 2024 Completed.
 
4922 SASUMAN, MARY LOUISE J. PLANNING Review and read the handouts for the previously LARFP seminar August 2, 2024 100 August 2, 2024 Completed.
 
4923 SASUMAN, MARY LOUISE J. PLANNING Prepare Gantt chart for the timeline of Cogon Bacaca LARP preparation and implementation August 2, 2024 100 August 2, 2024 Completed.
 
4924 SASUMAN, MARY LOUISE J. PLANNING Meeting with PDU Head on the timeline of Cogon Bacaca LARP preparation and implementation August 2, 2024 100 August 2, 2024 Completed.
 
4925 SASUMAN, MARY LOUISE J. PLANNING Prepare initial revision of IWRMP action taken for the CO’s BTOR August 2, 2024 100 August 2, 2024 Completed.
 
4927 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony July 29, 2024 100 July 29, 2024
 
4928 LUARDO, GLENN D. PLANNING Prepare Feasibility Study Report for the Proposed Talomo River - Dacudao PIP (Shp files and Table for land area by Barangay) July 29, 2024 100 July 29, 2024 Other Accomplishments: Prepared FSDE POW for the Proposed Bagumbayan PIP (60%), Revised CSE PPMP Online Encoding for Planning and Design Unit for 2nd Sem 2024 (50%).
 
4929 LUARDO, GLENN D. PLANNING Prepare FSDE POW for the Proposed Bagumbayan PIP July 30, 2024 100 July 30, 2024 Submitted POW for review and correction to P&D Head. Other Accomplishment: Prepared Communication Letter for Project ID @ Brgy. North Lamidan, Don Marcelino, Davao Occidental (100%).
 
4930 HERNAN, ALDEN PLANNING Draft Cogon Bacaca SRIP Str. pan and sectioning. Rd. X- Comb. Rd. X-ing & vertical drop w/ T.O (sta. 0+433.32),Thr. X-ing (sta. 0+524.04), Rd. X-ing w/ T.O ( sta. 0+804.11), Vertical Drop (sta. 0+92.11) August 2, 2024 85 August 2, 2024 On-going , Inserted work: revised cogon bacaca srip DED accomplishment as per checked (07/30/24), LARF/P level off meeting (08/02/24)
 
4931 LUARDO, GLENN D. PLANNING Prepare Location Map of Baguio District, Davao City in preparation for the conduct of Project ID July 31, 2024 100 July 31, 2024 Other Accomplishments: Revised CSE PPMP Online Encoding for Planning and Design Unit for 2nd Sem 2024 (90%), Prepared and submitted specification for Comb Binding Machine and Ream Cutter to Property Unit as reference to suppliers (100%).
 
4932 LUARDO, GLENN D. PLANNING Printing and binding Feasibility Study Report of the proposed Kibangay PIP August 1, 2024 100 August 1, 2024 Other Accomplishment: Prepared communication letter for the conduct of project ID at the proposed Lacaron PIP (100%).
 
4933 LUARDO, GLENN D. PLANNING Prepare layout map for the proposed Balawan SRIP and Matanao Balabag SRIP August 2, 2024 100 August 2, 2024 Other Accomplishment: Prepared communication letter for the conduct of project ID at the proposed Balawanan SRIP (100%).
 
4943 INTO, LEE WARREN PLANNING Prepare necessary data for San Jose SIP FY 2025 Drainage A & B DED. August 3, 2024 100 August 3, 2024 Prepared Survey data. Corrected errors on survey data (Stationing and Orientation). Prepared preliminary design (Canal Elements and necessary structures for canal site condition).
 
4946 ESPADERA, MA LOURDES PLANNING Potted Padada RIS - Lateral B4 Additional Data (Modernization) August 2, 2024 100 August 2, 2024
 
4948 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony August 5, 2024 100 August 5, 2024 COMPLETED
 
5035 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring & maintenance of plantations and nursery. August 5, 2024 100 August 5, 2024 - Facilitated round weeding, foliar/insecticide application at Malabang plantation sites. - Site monitored plantation sites & nursery.
 
5036 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring & maintenance of plantations and nursery. August 6, 2024 100 August 6, 2024 - Facilitated round weeding, foliar/insecticide application at Malabang and damsite plantation sites. - Site monitored plantation sites & nursery.
 
5037 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring & maintenance of plantations and nursery. August 7, 2024 100 August 7, 2024 - Facilitated round weeding, foliar/insecticide application at Mahayahay plantation sites. - Site monitored plantation sites & nursery. - Facilitate nursery storage cleaning/maintenance.
 
5038 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring & maintenance of plantations and nursery. August 8, 2024 100 August 8, 2024 - Facilitated round weeding, foliar/insecticide application at Clib plantation sites. - Site monitored plantation sites & nursery. - Hauled coco peat for the use of bagging of soil media intended for propagation.
 
5039 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring & maintenance of plantations and nursery. August 9, 2024 100 August 9, 2024 - Facilitated round weeding, foliar/insecticide application at Clib plantation sites. - Site monitored plantation sites & nursery. - Bagged soil media and facilitated in sowing of durian seeds at PRIS nursery.
 
5077 MARTURILLAS, JOHN LLOYD PLANNING Leveling at Suawan SRIP August 9, 2024 79 August 9, 2024 08-05-24 4 controls 08-06-24 4 controls 08-07-24 4 controls 08-08-24 6 controls 08-09-24 6 controls (44 controls accomplished as of August 09, 2024)
 
5081 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony August 5, 2024 100 August 5, 2024 Completed.
 
5082 SASUMAN, MARY LOUISE J. PLANNING Prepare NWRB certificate of posting and certificate of hearing. August 5, 2024 100 August 5, 2024 Completed.
 
5083 SASUMAN, MARY LOUISE J. PLANNING Review and check the catch-up plan for IWRMP implementation of Padada RIS and Mal RIS. August 5, 2024 100 August 5, 2024 Completed.
 
5084 SASUMAN, MARY LOUISE J. PLANNING Review and revise communication letter for renewal of survey personnel August 5, 2024 100 August 5, 2024 Completed.
 
5085 SASUMAN, MARY LOUISE J. PLANNING Prepare required documents for MGB Geological Site Scoping and detailed geologic mapping in Cogon Bacaca SRIP August 6, 2024 100 August 6, 2024 Completed.
 
5086 SASUMAN, MARY LOUISE J. PLANNING Review communication letter for the commencement of LARP preparation activities in Cogon Bacaca SRIP August 6, 2024 100 August 6, 2024 Completed.
 
5087 SASUMAN, MARY LOUISE J. PLANNING Prepare the documents needed for LARP preparation activities of Cogona Bacaca SRIP. August 6, 2024 100 August 6, 2024 Completed.
 
5088 SASUMAN, MARY LOUISE J. PLANNING Assist in the conduct of MGB’s geological site scoping for Cogon Bacaca SRIP. August 7, 2024 100 August 7, 2024 Completed.
 
5089 SASUMAN, MARY LOUISE J. PLANNING Conduct detailed geologic mapping at the right bank of Cogon Bacaca SRIP with NIA RIO Geologists. August 8, 2024 100 August 8, 2024 Completed.
 
5090 SASUMAN, MARY LOUISE J. PLANNING Conduct detailed geologic mapping at the left bank of Cogon Bacaca SRIP with NIA RIO Geologists. August 9, 2024 100 August 9, 2024 Completed.
 
5091 CAYABYAB, REY JIM PLANNING Carried on drafting irrigation network of the existing systems of Padada RIS for Modernization FSR August 5, 2024 100 August 5, 2024 Completed.
 
5092 CAYABYAB, REY JIM PLANNING Carried on crafting irrigation network of the proposed expansion area of Padada RIS for the Modernization FSR August 5, 2024 100 August 5, 2024 Completed.
 
5093 CAYABYAB, REY JIM PLANNING Prepare follow-up communication letter to DPWH Davao Occidental and 2nd District, Davao City re: NIA-DPWH convergence projectcs. August 6, 2024 100 August 6, 2024
 
5094 CAYABYAB, REY JIM PLANNING Prepare communication letters to Brgy. Cogon-Bacaca, NCIP, IPMR re: Commencement of LARP activities for Cogon-Bacaca SRIP August 6, 2024 100 August 6, 2024
 
5095 CAYABYAB, REY JIM PLANNING Prepare follow-up communication letter to DPWH Davao del Sur re: NIA-DPWH convergence projectcs. August 7, 2024 100 August 7, 2024
 
5097 CAYABYAB, REY JIM PLANNING Draft communication letter to MGB/EMB re: Coordination meeting for the desiltation activities of the existing irrigation systems. August 7, 2024 100 August 7, 2024
 
5098 CAYABYAB, REY JIM PLANNING Prepare documents for the verification activity of LARP for Cogon-Bacaca SRIP August 7, 2024 100 August 7, 2024
 
5099 CAYABYAB, REY JIM PLANNING Conduct verification of initially identified PAPs for LARP preparation of Cogon-Bacaca SRIP August 8, 2024 100 August 8, 2024
 
5100 CAYABYAB, REY JIM PLANNING Conduct verification of initially identified PAPs for LARP preparation of Cogon-Bacaca SRIP August 9, 2024 100 August 9, 2024
 
5101 ESPADERA, MA LOURDES PLANNING Plotted Padada CIS FY 2025 (Canal Lining) August 5, 2024 95 August 5, 2024 50%
 
5102 CAYABYAB, REY JIM PLANNING Tabulate data from the verification activity on LARP preparation of Cogon-Bacaca SRIP August 10, 2024 100 August 10, 2024
 
5103 ESPADERA, MA LOURDES PLANNING Plotted Padada RIS Lateral A-FY 2025 (Modification) August 7, 2024 100 August 7, 2024
 
5104 ESPADERA, MA LOURDES PLANNING Plotted Padada CIS FY 2025 (Canal Lining) August 6, 2024 95 August 6, 2024
 
5105 ESPADERA, MA LOURDES PLANNING Digitized Submerged Area of CBSRIP August 6, 2024 100 August 6, 2024
 
5106 ESPADERA, MA LOURDES PLANNING Miscellaneous: Inquire Process of NAMRIA Calibration at RIO Prepare Survey Team Travel Docs Discussion for PRIS Main Dam Upstream Survey August 6, 2024 100 August 6, 2024
 
5107 ESPADERA, MA LOURDES PLANNING Miscellaneous: Back Track Survey data of CBSRIP at Reservoir to ensure accuracy of Submerge Area Delineation Personal: Process Undispensed Cash Withdrawal at LBP August 7, 2024 100 August 7, 2024
 
5108 ESPADERA, MA LOURDES PLANNING Conducted Project Identification at North Lamidan SIP August 8, 2024 100 August 8, 2024
 
5109 ESPADERA, MA LOURDES PLANNING Conducted Project Identification at North Lamidan SIP August 9, 2024 100 August 9, 2024
 
5110 CUICO, JHO-ANN A. PLANNING Drafting of New Cabasagan CIS Main Canal Plan & Profile (Sta. 0+000.00 to 0+840.00) August 5, 2024 100 August 5, 2024 COMPLETED
 
5111 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for POW, PCR and Turn-over Attachments August 5, 2024 100 August 5, 2024 COMPLETED
 
5112 CUICO, JHO-ANN A. PLANNING Receive LUC Documents, Input Details to LOGBOOK LUC Tracker August 5, 2024 100 August 5, 2024 COMPLETED
 
5113 CUICO, JHO-ANN A. PLANNING Drafting of New Cabasagan CIS Main Canal Plan & Profile (Sta. 0+881.39 to 1+260.34) August 6, 2024 100 August 6, 2024 COMPLETED
 
5114 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 6, 2024 100 August 6, 2024 COMPLETED
 
5115 CUICO, JHO-ANN A. PLANNING Drafting of New Cabasagan CIS Lateral A Plan & Profile (Sta. 0+000.00 - 0+471.98) August 7, 2024 100 August 7, 2024 COMPLETED
 
5116 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 7, 2024 100 August 7, 2024 COMPLETED
 
5117 CUICO, JHO-ANN A. PLANNING Drafting of New Cabasagan CIS Lateral A Plan & Profile (Sta. 0+550.87 to 1+396.24) August 8, 2024 100 August 8, 2024 COMPLETED
 
5118 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 8, 2024 100 August 8, 2024 COMPLETED
 
5119 CUICO, JHO-ANN A. PLANNING Drafting of New Cabasagan CIS Lateral A Plan & Profile (Sta. 1+411.14 to 2+098.97) August 9, 2024 100 August 9, 2024 COMPLETED
 
5120 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 9, 2024 100 August 9, 2024 COMPLETED
 
5121 CUICO, JHO-ANN A. PLANNING Receive LUC Documents, Input Details to LOGBOOK LUC Tracker August 9, 2024 100 August 9, 2024 COMPLETED
 
5122 INTO, LEE WARREN PLANNING Prepare San Jose SIP Drainage B - Plan & Profile August 5, 2024 100 August 5, 2024 Completed.
 
5123 INTO, LEE WARREN PLANNING Costing of FSDE Funds (Aug 5-9, 2024) May 9, 2024 100 August 9, 2024 Completed.
 
5124 INTO, LEE WARREN PLANNING Prepare Plan and Profile of San Jose SIP Drainage A (2018-revised) May 6, 2024 0 N/A
 
5125 INTO, LEE WARREN PLANNING Attend Dissemination Presentation of the Dam Safety Management Capacity Training. August 9, 2024 0 N/A
 
5126 INTO, LEE WARREN PLANNING Printing of Mal RIS Laral Main Canal Protection Works DED. August 9, 2024 0 N/A
 
5127 INTO, LEE WARREN PLANNING Polishing of San Jose SIP FY 2025 Drainage B Cross-Sections August 9, 2024 0 N/A
 
5128 INTO, LEE WARREN PLANNING Prepare Convergence Report as of July 31, 2024 August 8, 2024 100 August 8, 2024 Prepared and sent advance e-copy to RIO via Gmail.
 
5130 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony August 5, 2024 100 August 5, 2024
 
5131 LUARDO, GLENN D. PLANNING Prepare and submit layout map of the proposed Kibangay PIP, Tolos Creek - Buda SIP and Kiopao PIP to NIA RIO-XI August 5, 2024 100 August 5, 2024
 
5132 LUARDO, GLENN D. PLANNING Scan and bind signed Feasibility Study Report of the Proposed Kibangay PIP August 6, 2024 100 August 6, 2024
 
5133 LUARDO, GLENN D. PLANNING Revised FSDE POW of the proposed Bagumbayan PIP. August 6, 2024 100 August 6, 2024
 
5134 LUARDO, GLENN D. PLANNING Prepare layout map of the proposed North Lamidan PIP as reference for the conduct of project ID August 7, 2024 100 August 7, 2024 Other Accomplishment: Facilitated the preparation of gate pass and travel request for the conduct of project ID @ the Proposed North Lamidan PIP (100%).
 
5135 LUARDO, GLENN D. PLANNING Conduct Project ID @ the proposed North Lamidan PIP located at Brgy. North Lamidan, Don Marcelino, Davao Occidental August 9, 2024 100 August 9, 2024 On August 8, 2024; 1st day of the Conduct of Project ID @ the proposed North Lamidan PIP located at Brgy. North Lamidan, Don Marcelino, Davao Occidental (50%).
 
5136 EUGENIO, VENANN PLANNING August 6-7, 2024: Attend the updating of project implementation programs (NIS & CIS) workshop August 7, 2024 100 August 7, 2024 Attended 2-day workshop.
 
5137 EUGENIO, VENANN PLANNING Compute and submit FDC of FY 2025 FSDE Proposed Projects August 9, 2024 100 August 8, 2024 Accomplishment of the week: Update PIR of FY 2025 FSDE Proposed Projects; Prepare communication letter; Process TOT and LUC applications; Assist clients/applicants for TOT and LU.
 
5154 HERNAN, ALDEN PLANNING continue Drafting of comb. rd. x-ng w/ vertical drop w/ T.O, Rd. X-ing w/ T.O, Vertical Drop August 8, 2024 100 August 7, 2024 completed
 
5155 HERNAN, ALDEN PLANNING Conduct verification of project impact at affected pap of Cogon Bacaca SRIP at Cogon Bacaca, Kiblawan August 9, 2024 100 August 9, 2024 completed
 
5174 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. August 12, 2024 100 August 12, 2024 - Attended flag raising ceremony. - Conducted site monitoring & inspection. - Oversee vermi-cast, foliar/insecticide application on plantation sites. - Facilitated nursery activities (bagging, transplanting)
 
5175 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. August 13, 2024 100 August 13, 2024 - Site monitoring & inspection at Malabang plantation sites. - Facilitated bagging of soil media and germination of durian seeds. - Oversee field activities (M&P) on plantation sites.
 
5176 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. August 14, 2024 100 August 14, 2024 Completed. Other accomplishments: - Oversee spraying of foliar/insecticide at Mahayahay & damsite plantation sites. - Facilitated and assisted in bagging of soil media and germination of 35 durian seeds.
 
5177 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. August 15, 2024 100 August 15, 2024 - Site monitored plantation at Langa-an. - Oversee foliar/insecticide application therein. - Facilitated the clearing of nursery periphery.
 
5178 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. August 16, 2024 100 August 16, 2024 - Facilitated foliar/insecticide application at Langa-an. - Oversee bagging of soil media. - Facilitated canal clearing at PRIS.
 
5237 CUICO, JHO-ANN A. PLANNING Attend Flag Raising Ceremony August 12, 2024 100 August 12, 2024 COMPLETED
 
5238 CUICO, JHO-ANN A. PLANNING Drafting of FY 2025 PADADA RIS Lateral A Plan & Profile (Sta.: 3+519.33 to 4+929.86), Plan Cross section (Sta.: 3+520.00 - 4+180.00) August 12, 2024 100 August 12, 2024 COMPLETED
 
5239 CUICO, JHO-ANN A. PLANNING Receive LUC Documents, Input Details to LOGBOOK LUC Tracker August 12, 2024 100 August 12, 2024 COMPLETED
 
5240 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 12, 2024 100 August 12, 2024 COMPLETED
 
5241 CUICO, JHO-ANN A. PLANNING Drafting of FY 2025 PADADA RIS Lateral A Plan & Profile (Sta.: 5+089.87 to 5+935.62), Plan Cross section (Sta.: 4+200.00 to 4+860.00) August 13, 2024 100 August 13, 2024 COMPLETED
 
5242 CUICO, JHO-ANN A. PLANNING Receive LUC Documents, Input Details to LOGBOOK LUC Tracker August 13, 2024 100 August 13, 2024 COMPLETED
 
5243 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 13, 2024 100 August 13, 2024 COMPLETED
 
5244 CUICO, JHO-ANN A. PLANNING Drafting of FY 2025 PADADA RIS Lateral A Plan & Profile (Sta.: 6+094.18 to 6+777.58), Plan Cross section (Sta.: 4+880.00 to 6+020.00) August 14, 2024 100 August 14, 2024 COMPLETED
 
5245 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for Rehabilitation and Protection of Water Resources Supporting Irrigation System (R&P WRSIS) PADADA RIS and MAL RIS - Year 2 August 14, 2024 100 August 14, 2024 COMPLETED
 
5246 CUICO, JHO-ANN A. PLANNING Drafting of FY 2025 PADADA RIS Lateral A Plan & Profile (Sta.: 7+033.09 to 7+386.01), Plan Cross section (Sta.: 6+040.00 to 7+386.01) August 15, 2024 100 August 15, 2024 COMPLETED
 
5247 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents August 15, 2024 100 August 15, 2024 COMPLETED
 
5259 ESPADERA, MA LOURDES PLANNING Conducted Survey Map Test at Suawan SRIP August 12, 2024 100 August 12, 2024
 
5260 ESPADERA, MA LOURDES PLANNING Conducted Survey Map Test at Suawan SRIP August 13, 2024 100 August 13, 2024
 
5261 ESPADERA, MA LOURDES PLANNING Conducted Survey Map Test at Suawan SRIP August 14, 2024 100 August 14, 2024
 
5262 ESPADERA, MA LOURDES PLANNING Conducted Survey Map Test at Suawan SRIP August 15, 2024 100 August 15, 2024
 
5264 ESPADERA, MA LOURDES PLANNING Prepare DTR and WAR August 16, 2024 100 August 16, 2024
 
5266 ESPADERA, MA LOURDES PLANNING Check and Attach CAs for Survey Team DTRs August 16, 2024 100 August 16, 2024
 
5267 ESPADERA, MA LOURDES PLANNING Check Local JO Suawan SRIP Personnel DTRs and WARs and Prepare Payroll August 16, 2024 100 August 16, 2024
 
5268 ESPADERA, MA LOURDES PLANNING Plot Lower Marber CIS FY 2025 Survey Data August 16, 2024 100 August 17, 2024
 
5269 ESPADERA, MA LOURDES PLANNING Plot and Update Miral SRIS Parcellary Survey Data August 16, 2024 100 August 19, 2024 As of Aug 16, 2024
 
5277 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony August 12, 2024 100 August 12, 2024
 
5278 LUARDO, GLENN D. PLANNING Attend Planning and Design Coordination Meeting regarding the conducted Project ID @ the Proposed Kapliko Creek - North Lamidan SIP, located @ Brgy. North Lamidan, Don Marcelino, Davao Occidental. August 12, 2024 100 August 12, 2024
 
5279 LUARDO, GLENN D. PLANNING Updated PDD Form of the Proposed Kapliko Creek - North Lamidan SIP. August 12, 2024 100 August 12, 2024
 
5280 LUARDO, GLENN D. PLANNING Update Layout Map of the Proposed Kapliko Creek - North Lamidan SIP August 13, 2024 100 August 13, 2024
 
5281 LUARDO, GLENN D. PLANNING Facilitate the preparation of gate pass and travel request for the conduct of project ID @ the Proposed Lacaron PIP and Balawanan SRIP. August 13, 2024 100 August 13, 2024
 
5282 LUARDO, GLENN D. PLANNING Conduct Project ID @ the Proposed Lacaron PIP, located @ Brgy. Lacaron, Malita, Davao Occidental. August 14, 2024 100 August 14, 2024 Other Accomplishment: Follow-up letter request @ DENR, Davao Occidental regarding the status of land tenure of the proposed Basiawan PIP (100%)
 
5283 LUARDO, GLENN D. PLANNING Conduct Project ID @ the Proposed Balawanan SRIP, located @ Brgy. Upper Bala, Magsaysay, Davao del Sur. August 15, 2024 100 August 15, 2024
 
5300 CAYABYAB, REY JIM PLANNING Attend Planning and Design Unit coordination meeting August 12, 2024 100 August 12, 2024
 
5301 CAYABYAB, REY JIM PLANNING Prepare communication letter to BLGUs for the conduct of Baseline Information and Socio-Economic Survey (SES) on LARP for Cogon-Bacaca SRIP August 12, 2024 100 August 12, 2024
 
5302 CAYABYAB, REY JIM PLANNING Consolidate powerpoint presentations for the 2nd Regionwide PDS Assessment August 13, 2024 100 August 13, 2024
 
5303 CAYABYAB, REY JIM PLANNING Check the list of PAPs per barangay based on the initially identified PAPs August 13, 2024 100 August 13, 2024
 
5304 CAYABYAB, REY JIM PLANNING Prepare draft POW for San Jose PIP based on the revised plan August 14, 2024 100 August 14, 2024 For checking.
 
5305 CAYABYAB, REY JIM PLANNING Attend virtual meeting re: NIACO comments on the Interim Report of Pagan SRIP August 14, 2024 100 August 14, 2024
 
5306 CAYABYAB, REY JIM PLANNING Plot data sent by Engr. Hernan on the conducted field verification last Aug. 13, 2024 August 14, 2024 100 August 14, 2024
 
5307 CAYABYAB, REY JIM PLANNING Plot data sent by Engr. Hernan on the conducted field verification last Aug. 14, 2024 August 15, 2024 100 August 15, 2024
 
5308 CAYABYAB, REY JIM PLANNING Prepare communication letter to DPWH re: Proposed projects for NIA-DPWH Convergence projects under OO2 August 15, 2024 100 August 15, 2024
 
5309 CAYABYAB, REY JIM PLANNING Prepare communication letter to other agencies re: formation of Inventory and Valuation Committee (IVC) for LARP formulation of Cogon-Bacaca SRIP August 16, 2024 100 August 16, 2024
 
5310 CAYABYAB, REY JIM PLANNING Draft communication letter to Cong. Ungab re: Update on the proposed NIA-Convergence projects for 3rd District, Davao City August 16, 2024 100 August 16, 2024
 
5312 CAYABYAB, REY JIM PLANNING Plot data on the conducted field verification last Aug. 15, 2024 for LARP formulation of Cogon-Bacaca SRIP August 17, 2024 100 August 17, 2024
 
5313 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony August 12, 2024 100 August 12, 2024 Completed.
 
5314 SASUMAN, MARY LOUISE J. PLANNING Attend PDU personnel coordination meeting August 12, 2024 100 August 12, 2024 Completed.
 
5316 SASUMAN, MARY LOUISE J. PLANNING Assist client in the application of Commercial Sand and Gravel (CSAG) August 13, 2024 100 August 13, 2024 Completed.
 
5317 SASUMAN, MARY LOUISE J. PLANNING E-mail to NIA RIO the advance copy of the final Padada RIS modernization FSR August 13, 2024 100 August 13, 2024 Completed.
 
5318 SASUMAN, MARY LOUISE J. PLANNING Assisted in the preparation of report for the Regionwide PDU assessment August 13, 2024 100 August 13, 2024 Completed.
 
5319 SASUMAN, MARY LOUISE J. PLANNING Print Padada RIS modernization FSR August 16, 2024 100 August 13, 2024 Completed.
 
5320 SASUMAN, MARY LOUISE J. PLANNING Print Annex of Padada RIS modernization FSR August 16, 2024 100 August 14, 2024 Completed.
 
5321 SASUMAN, MARY LOUISE J. PLANNING Make comments on the flyers for IWRMP activities August 14, 2024 100 August 14, 2024 Completed.
 
5322 SASUMAN, MARY LOUISE J. PLANNING Assist client in the application of Commercial Sand and Gravel (CSAG) August 14, 2024 100 August 14, 2024 Completed.
 
5323 SASUMAN, MARY LOUISE J. PLANNING Prepare payroll and relevant documents of the JO personnel in Cogon Bacaca SRIP implementation activities August 14, 2024 100 August 14, 2024 Completed.
 
5324 SASUMAN, MARY LOUISE J. PLANNING Prepare Commercial Sand and Gravel (CSAG) Certification August 15, 2024 100 August 15, 2024 Completed.
 
5325 SASUMAN, MARY LOUISE J. PLANNING Prepare NWRB Certificate of Posting and Certificate of Hearing August 15, 2024 100 August 15, 2024 Completed.
 
5326 SASUMAN, MARY LOUISE J. PLANNING Assist in the data collation of LARP activities in Cogon Bacaca SRIP August 16, 2024 85 August 16, 2024 On-going consolidation of the previous data.
 
5327 SASUMAN, MARY LOUISE J. PLANNING Bind and submit the hard copy of Padada RIS modernization FSR August 15, 2024 100 August 15, 2024 Completed.
 
5328 SASUMAN, MARY LOUISE J. PLANNING Apply online Certificate of Non-Coverage for Miral SRIS (establishment of 26 pumps) August 15, 2024 100 August 15, 2024 Completed.
 
5329 SASUMAN, MARY LOUISE J. PLANNING Prepare WAR and DTRs for the period of August 1-15, 2024. August 16, 2024 100 August 16, 2024 Completed.
 
5330 SASUMAN, MARY LOUISE J. PLANNING Prepare and compile payroll, WARs and DTRs for the JO personnel in LARP Cogon Bacaca activities August 16, 2024 100 August 16, 2024 Completed.
 
5331 SASUMAN, MARY LOUISE J. PLANNING Finalize the proposal for the conduct of Socio-economic Survey for LARP Cogon Bacaca activities. August 16, 2024 100 August 16, 2024 Completed.
 
5339 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 16, 2024 100 August 16, 2024 COMPLETED
 
5340 INTO, LEE WARREN PLANNING Attend Flag Ceremony August 12, 2024 100 August 12, 2024 Attended on time.
 
5342 INTO, LEE WARREN PLANNING Checked and made few edits over the DED of Mal RIS Laral Main Canal Protection Works August 12, 2024 100 August 12, 2024 Modified Stairs and turn-in.
 
5343 CUICO, JHO-ANN A. PLANNING Receive, Record, Reproduce, Field and distribute engineering Documents August 16, 2024 100 August 16, 2024 COMPLETED
 
5344 INTO, LEE WARREN PLANNING Prepare and print FY 2025 Davao del Sur NEP August 12, 2024 100 August 12, 2024 Prepared with transmittal.
 
5345 INTO, LEE WARREN PLANNING Attend Workshop Re: POW Preparation. August 13, 2024 100 August 13, 2024 Attended on time.
 
5346 INTO, LEE WARREN PLANNING Personally requested updates regarding the submitted DED Plans for checking by RIO. August 13, 2024 100 August 11, 2024 Completed.
 
5347 INTO, LEE WARREN PLANNING Prepare FSDE Report as of August 15, 2024 August 14, 2024 100 August 15, 2024 Worked on corrections and produced 3 copies for signing and sent e-copy to RIO via e-mail.
 
5348 INTO, LEE WARREN PLANNING Worked on the Mal RIS ISFIAM DED Corrections from RIO. August 14, 2024 100 August 14, 2024 Changed Sabo dam details; Changed profile of protection works and edited all affected cross-sections.
 
5349 INTO, LEE WARREN PLANNING Worked on the San Jose SIP Drainage DED Corrections from RIO. August 14, 2024 100 August 14, 2024 -Added Rough Concrete Finish on the Stone Masonry -Provided missing material descriptions. -Used n=0.025 for material roughness and recomputed hydraulic elements.
 
5350 MARTURILLAS, JOHN LLOYD PLANNING Leveling at Suawan SRIP ( 12 remaining controls ) August 15, 2024 100 August 15, 2024 August 12-15, 2024 ( Completed )
 
5351 INTO, LEE WARREN PLANNING Worked on PRIS OFFICE DED Corrections. August 14, 2024 100 August 14, 2024 -Corrected Perimeter Fence Plan -Added Ceiling Framing Plan
 
5352 INTO, LEE WARREN PLANNING Prepare DED for Pantang CIS (FY 2025): Protection Works and 1 unit (1) Sluice Tower w/ Gate. August 15, 2024 30 August 16, 2024 Crafted typical section and forwarded current data to draftsman for cross-sectioning. On-going drafting of proposed sluicegate assembly.
 
5353 INTO, LEE WARREN PLANNING Prepare DED for San Jose SIP (FY 2025): Drainage A and Drainage B August 15, 2024 100 August 15, 2024 Submitted draft approved by RIO. Printed DED.
 
5354 INTO, LEE WARREN PLANNING Worked on Mal RIS (ISFIAM): Protection Works DED corrections. August 15, 2024 100 August 15, 2024 -lowered dam height by 0.50 meters as per RIO latest comment -edited all affected cross-sections
 
5355 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Miral SRIS Parcellary ( August 12, 2024 ) Survey Data August 16, 2024 100 August 16, 2024 Completed
 
5356 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Miral SRIS Parcellary ( August 13, 2024 ) Survey Data August 16, 2024 100 August 16, 2024 Completed
 
5357 EUGENIO, VENANN PLANNING Prepare and Submit FY 2026 AIP August 13, 2024 100 August 13, 2024 Other accomplishments within the week: Update FSDE PIR as per CO comments; Generate watershed of North Lamidan SIP; Assist clients/applicants for TOT and LUC; Process LUC Applications.
 
5358 EUGENIO, VENANN PLANNING Prepare and submit presentation of FSDE 2024 NEP August 16, 2024 100 August 15, 2024 Other Accomplishments within the week: Meeting with DFT; Prepare communication letter ; Edit/update layout map for FY 2025 FSDE attachment; Prepare annexes for FY 2025 FSDE attachmen.
 
5360 EUGENIO, VENANN PLANNING Prepare updated Annex 5, 10-year plan August 16, 2024 100 August 16, 2024 Other accomplishments: Plotting of applied areas for TOT; Prepare and submit layout map of Proposed Project for Irrigation Network Piping System; Extract and check data of Project ID at Lacaron PIP and Balawanan SRIP;
 
5362 CUICO, JHO-ANN A. PLANNING Delinate Final Canal structures of Cogon Bacaca SRIP (Lateral A,Mian Canal, Lateral B, Lateral B1, Lateral D-1, Lateral D1-A, Lateral C, Lateral D) August 16, 2024 100 August 16, 2024 COMPLETED
 
5363 INTO, LEE WARREN PLANNING Work on the corrections of on San Jose SIP Drainage Structures August 17, 2024 80 August 17, 2024 3 out of 4 Structures corrected.
 
5365 LUARDO, GLENN D. PLANNING Prepare PDD and Layout Map of the conducted project ID of the proposed Lacaron PIP August 16, 2024 100 August 16, 2024 Other accomplishment: Prepared PDD for the conducted project ID of the proposed Balawanan SRIP (80%).
 
5368 HERNAN, ALDEN PLANNING LARP personnel meeting pertaining to the previously conducted validation of impacted areas of Cogon , Bacaca SRIP at the submerged and damsite area last August 8-9, 2024, Drafting of Cogon Bacaca Lat. D1 structure: Vertical Drop @ sta. 0+924.11 August 12, 2024 100 August 12, 2024 completed
 
5369 HERNAN, ALDEN PLANNING Conduct validation/veriication of impact areas and PAP's affected of Cogon Bacaca SRIP at submerged and damsite area for LARP August 16, 2024 100 August 16, 2024 completed
 
5454 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. August 19, 2024 100 August 19, 2024 - Attended flag raising ceremony. - Facilitated nursery gathering of soil media/clearing. - Facilitated land mower at PRIS dam. - Delivery of water at Malabang site. - Delivery of tree guards at Mahayahay sites.
 
5455 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. August 20, 2024 100 August 20, 2024 - Facilitated watering/spraying & round weeding at Malabang sites. - Instructed canal/periphery clearing at PRIS dam. - Re-bagging of plants & bagging of soil media at PRIS nursery
 
5456 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. August 21, 2024 100 August 21, 2024 - Site monitored plantation sites (Hagonoy & Matanao). - Assisted in the collection/Germination of calamansi seeds at nursery. - Oversee tree guard installation & watering at Mahayahay sites.
 
5457 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. August 22, 2024 100 August 22, 2024 - Facilitated site clearing at Clib & canal clearing - Transferred planted seedlings at shaded area in nursery. - Pre germinated collected mangosteen seeds and sowed it at rooting chamber. - Submitted IWRMP Progress Report for August
 
5530 MARTURILLAS, JOHN LLOYD PLANNING Plotting of MIRAL SRIS parcellary map ( August 13-14, 2024 ) survey data August 19, 2024 100 August 19, 2024 Completed
 
5531 MARTURILLAS, JOHN LLOYD PLANNING Plotted 4 LUC applications August 19, 2024 100 August 19, 2024 Completed
 
5532 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP topographic map August 20, 2024 5 August 20, 2024 On-Going
 
5533 MARTURILLAS, JOHN LLOYD PLANNING Plotted 1 LUC applocation August 20, 2024 100 August 20, 2024 Completed
 
5534 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP topographic map August 21, 2024 10 August 21, 2024 On-Going
 
5535 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP topographic map August 22, 2024 15 August 22, 2024 On-Going
 
5536 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony. August 19, 2024 100 August 19, 2024
 
5538 LUARDO, GLENN D. PLANNING Prepare FSDE POW for the proposed Kapliko Creek - North Lamidan SIP. August 20, 2024 100 August 20, 2024 FSDE POW submitted for review.
 
5539 LUARDO, GLENN D. PLANNING Prepare Communication Letter for the conduct of Project ID @ Baguio District, Brgy. Bantol, and Brgy. Catigan. August 21, 2024 100 August 21, 2024 Other Accomplishment: Facilitate in Posting 2 (ITB, NOA, and NTP) for NIA Projects (100%).
 
5540 LUARDO, GLENN D. PLANNING Prepare Layout Map in preparation for the conduct of Project ID in Baguio District and Brgy. Bantol. August 22, 2024 100 August 22, 2024 Other Accomplishments: Prepare PR for Fuel and Oil for PDU (100%), Translate Socio-Economic Survey (SES) Questionnaire to Visaya in preparation for the conduct of FGD Activity the Proposed Cogon Bacaca SRIP (100%).
 
5541 LUARDO, GLENN D. PLANNING Prepare report for the conducted Project ID at the proposed Kapliko Creek - North Lamidan SIP, Lacaron PIP and Balawanan SRIP. August 19, 2024 100 August 19, 2024 Other accomplishment: Presentation of the conducted Project ID of the Proposed Kapliko Creek - North Lamidan SIP, Lacaron PIP and Balawanan SRIP at the Office of the Manager (100%).
 
5542 SASUMAN, MARY LOUISE J. PLANNING Attended flag raising ceremony. August 19, 2024 100 August 19, 2024 Completed.
 
5543 SASUMAN, MARY LOUISE J. PLANNING Prepare Commercial Sand and Gravel (CSAG) Certification. August 19, 2024 100 August 19, 2024 Completed.
 
5544 SASUMAN, MARY LOUISE J. PLANNING Prepare NWRB Notice of Posting Certification. August 19, 2024 100 August 19, 2024 Completed.
 
5545 SASUMAN, MARY LOUISE J. PLANNING Prepare related documents needed for the DENR-CENRO Malalag coordination meeting. August 19, 2024 100 August 19, 2024 Completed.
 
5546 SASUMAN, MARY LOUISE J. PLANNING Attend coordination meeting with DENR-CENRO Malalag August 20, 2024 100 August 20, 2024 Attended the meeting. Other accomplishment: Initially consolidated the previously gathered PAPs data for Cogon Bacaca SRIP.
 
5548 SASUMAN, MARY LOUISE J. PLANNING Consolidate the previously gathered PAPs data for Cogon Bacaca SRIP August 21, 2024 100 August 21, 2024 Completed.
 
5549 SASUMAN, MARY LOUISE J. PLANNING Finalize the number of PAPs indicated in budget proposal for the conduct of Focus Group Discussion (FGD) in Cogon Bacaca SRIP August 20, 2024 100 August 20, 2024 Completed.
 
5550 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter for the brief summary on the meeting conducted with DENR-CENRO Malalag August 21, 2024 100 August 21, 2024 Completed.
 
5551 SASUMAN, MARY LOUISE J. PLANNING Prepare data needed for the conduct of FGD in Cogon Bacaca SRIP August 21, 2024 100 August 21, 2024 Completed.
 
5552 SASUMAN, MARY LOUISE J. PLANNING Prepare powerpoint presentation for the conduct of FGD in Cogon Bacaca SRIP. August 22, 2024 100 August 22, 2024 Completed.
 
5553 SASUMAN, MARY LOUISE J. PLANNING Prepare data needed for the conduct of FGD in Cogon Bacaca SRIP August 22, 2024 100 August 22, 2024 Completed.
 
5554 SASUMAN, MARY LOUISE J. PLANNING Coordinate with DENR-EMB RXI on the status of the application of SEIA in Cogon Bacaca SRIP. August 22, 2024 100 August 22, 2024 Completed.
 
5555 SASUMAN, MARY LOUISE J. PLANNING Attend virtual meeting with Green Collar Consultancy relative to the status of SEIA and ECC application for Cogon Bacaca SRIP August 19, 2024 100 August 19, 2024 Completed.
 
5558 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony August 19, 2024 100 August 19, 2024 COMPLETED
 
5559 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 19, 2024 100 August 19, 2024 COMPLETED
 
5560 CUICO, JHO-ANN A. PLANNING Receive, Record, Reproduce, Field and distribute engineering Documents August 19, 2024 100 August 19, 2024 COMPLETED
 
5574 CUICO, JHO-ANN A. PLANNING Initial drafting of Protection Dike cross sections for New Cabasagan CIS Confluence Creek both sides (Sta. 0+000.00 to 0+120.00) August 19, 2024 10 August 19, 2024
 
5575 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 20, 2024 100 August 20, 2024 COMPLETED
 
5576 CUICO, JHO-ANN A. PLANNING Receive, Record, Reproduce, Field and distribute engineering Documents August 20, 2024 100 August 20, 2024 COMPLETED
 
5580 CUICO, JHO-ANN A. PLANNING Prepare Layout map of COGON BACACA SRIP (CBFMA, Protection Area, Production Area) August 20, 2024 100 August 20, 2024 COMPLETED
 
5588 CUICO, JHO-ANN A. PLANNING Finalize Cogon Bacaca SRIP Shapefiles (Canal Alignment, Canal Structures, Damsite Location) August 21, 2024 100 August 21, 2024 COMPLETED
 
5589 CUICO, JHO-ANN A. PLANNING Initial drafting of Protection Dike cross sections for New Cabasagan CIS Confluence Creek both sides (Sta. 0+000.00 to 0+120.00) August 22, 2024 70 August 22, 2024 Back to zero due to the revision of Stationing
 
5592 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 22, 2024 100 August 22, 2024 COMPLETED
 
5663 INTO, LEE WARREN PLANNING Prepare Pantang CIS DED Plan and Profile of Protection Works Downstream. August 19, 2024 100 August 19, 2024 Prepared design profile and details and forwarded it to draftsman for the crafting of cross-section.
 
5664 INTO, LEE WARREN PLANNING Polish Cross-Sections of Pantang CIS Protection Works DED drafted by draftsman. August 20, 2024 100 August 20, 2024 Edited and polished cross-sections prepared by draftsman and plotted Max Flood Elevations.
 
5666 INTO, LEE WARREN PLANNING Prepare Pantang CIS DED for the repair of Dam and addition of Sluice Gate August 21, 2024 100 August 21, 2024 Consulted knowledgeable colleagues for the proper crafting of sluice tower designs. Drafted conceptual design in Sketchup. Revised existing dam DED and executed necessary detailing.
 
5669 INTO, LEE WARREN PLANNING Compiled works from draftsman and finalized a draft of Pantang CIS Protection Works and repair of dam. August 22, 2024 100 August 22, 2024 Crafted protection works DED of upstream. Converted finished plans into PDF and submitted draft to RIO for checking.
 
5670 INTO, LEE WARREN PLANNING Prepare FS POW of Kapliko Creek - North Lamidan SIP. August 27, 2024 95 August 27, 2024 Completed draft, for checking by unit head.
 
5672 INTO, LEE WARREN PLANNING Costing of FSDE Funds (August 19-22, 2024) August 22, 2024 100 August 22, 2024 Completed.
 
5674 CAYABYAB, REY JIM PLANNING Attend virtual meeting with Green Collar Consultancy relative to the status of SEIA and ECC application for Cogon Bacaca SRIP August 19, 2024 100 August 19, 2024
 
5676 CAYABYAB, REY JIM PLANNING Prepare documents for coordination meeting with DENR-CENRO Malalag August 19, 2024 100 August 19, 2024
 
5677 CAYABYAB, REY JIM PLANNING Attend coordination meeting with DENR-CENRO Malalag re: LARP formulation for Cogon Bacaca SRIP August 20, 2024 100 August 20, 2024
 
5678 CAYABYAB, REY JIM PLANNING Verify PAPs of Main canal and laterals of Cogon Bacaca SRIP August 20, 2024 100 August 20, 2024
 
5679 CAYABYAB, REY JIM PLANNING Draft Upper Cabasagan main dam for FY 2025 September 6, 2024 100 September 4, 2024 August 22, 2024 - 20% August 23, 2024 - 35% August 30, 2024 - 50% August 31, 2024 - 65% September 04, 2024 - 100%
 
5680 CAYABYAB, REY JIM PLANNING Update and submit communication letters to affected barangays for FGD at Cogon Bacaca SRIP August 21, 2024 100 August 21, 2024
 
5681 CAYABYAB, REY JIM PLANNING Prepare data needed for the conduct of FGD at Cogon Bacaca SRIP August 21, 2024 100 August 21, 2024
 
5683 CAYABYAB, REY JIM PLANNING Prepare powerpoint presentation for the FGD activity of Cogon Bacaca SRIP August 23, 2024 100 August 23, 2024
 
5689 EUGENIO, VENANN PLANNING Update Annexes for FSDE 2025 Submission August 19, 2024 100 August 19, 2024 Other Accomplishments: Process LUC Applications; Prepare layout map for LUC attachment; Assist clients/applicants for TOT and LUC.
 
5690 EUGENIO, VENANN PLANNING Prepare attachment of discharge measurement report for Don Mariano CIS Dam and downstream of Delis Dam August 20, 2024 100 August 20, 2024 Other Accomplishments: Orientation of LUC and TOT document/certificate preparation; Update PIR of North Lamidan SIP; Print Annexes for FSDE 2025 Submission; Assist clients/applicants for TOT and LUC.
 
5691 EUGENIO, VENANN PLANNING Other Accomplishments within the week. August 22, 2024 100 August 22, 2024 08-21-24: Prepare communication letters; Plotting of applied area for TOT; Process LUC Applications; Assist clients/applicants for TOT and LUC. 08-22-24: Print the updated PIR of Proposed FY 2025 FSDE; Plotting of applied area for the clarification of d
 
5692 EUGENIO, VENANN PLANNING Site visit at INPS Proposed Project. August 30, 2024 100 August 30, 2024 Other Accomplishments within the week: Prepare layout map of Balutakay River Watershed; Submit data needed by RIO for FSDE 2025 Presentation; Process LUC Application; Assist clients/applicants for TOT and LUC
 
5787 CUICO, JHO-ANN A. PLANNING Attend Flag Raising Ceremony August 27, 2024 100 August 27, 2024 COMPLETED
 
5839 INTO, LEE WARREN PLANNING PREPARE PRE-FS POW FOR Balutakay River - Digos SIP August 28, 2024 95 August 28, 2024 Completed draft, for checking by unit head.
 
5840 INTO, LEE WARREN PLANNING Prepare Pre-FS POW FOR Mal River - Mal SRIP August 28, 2024 95 August 28, 2024 Completed draft, for checking by unit head.
 
5841 INTO, LEE WARREN PLANNING PREPARE PRE-FS POW FOR Balawanan River - Magsaysay SRIP August 28, 2024 95 August 28, 2024 Completed draft, for checking by unit head.
 
5842 INTO, LEE WARREN PLANNING Prepare Blucon-Albatana CIS Remove and Replace of Sluice Gate Shelter DED August 29, 2024 100 August 29, 2024 Completed.
 
5844 CUICO, JHO-ANN A. PLANNING Receive, Record, Reproduce, Field and distribute engineering Documents August 27, 2024 100 August 27, 2024 COMPLETED
 
5845 CUICO, JHO-ANN A. PLANNING Initial drafting of Protection Dike cross sections for New Cabasagan CIS Main Creek both sides Cross Section (Sta. 0+000.00 to 0+0+04.0.00) August 27, 2024 100 August 27, 2024 COMPLETED: for checking
 
5846 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. August 27, 2024 100 August 27, 2024 - Attended flag raising ceremony. - Site monitored plantation at Malabang & canal clearing at PRIS. - Monitored nursery activities.
 
5847 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. August 28, 2024 100 August 28, 2024 - Facilitated spraying of fertilizers at Malabang and damsite plantation. - Oversee canal clearing. - Sowed collected mangosteen seeds at nursery.
 
5848 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. August 29, 2024 100 August 29, 2024 - Facilitate spraying at Clib plantation sites. - Oversee canal clearing/removal of fig tree within the canal. - Facilitate making of frame for tarpaulin to be use in contract farming. - Sowed collected seeds in PRIS nursery.
 
5849 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. August 30, 2024 100 August 30, 2024 Completed. Other accomplishments: - Facilitated removal of fig tree/vines hovering at main canal. - Facilitated making of frame for contract farming tarpaulins. - Oversee nursery activities. - Collection of DTRs
 
5850 INTO, LEE WARREN PLANNING Costing of FSDE Funds (August 26-30, 2024) August 30, 2024 100 September 2, 2024 Completed.
 
5851 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 28, 2024 100 August 28, 2024 COMPLETED: Waterfall SIP Main Canal Canalization: 0+000.00 - 3+205.72 = 2,112.92 Meters Canal Structures: 0+858.07 7 1+011.00 HDPE Structures, 4+612.63 Drainage Culvert, 2+200.11 Vertical Drop and installation of steep Varrier Post
 
5852 CUICO, JHO-ANN A. PLANNING Initial drafting of Protection Dike cross sections for New Cabasagan CIS Confluence Creek both sides Cross Section (Sta. 0+000.00 to 0+113.00) August 28, 2024 100 August 28, 2024 COMPLETED: for checking
 
5854 CUICO, JHO-ANN A. PLANNING Initial drafting of Protection Dike cross sections for New Cabasagan CIS Tributary Creek both sides Cross Section (Sta. 0+000.00 to 0+040.00) August 29, 2024 100 August 29, 2024 COMPLETED: for Checking
 
5855 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 29, 2024 100 August 29, 2024 COMPLETED: MAL RIS: Protection Dike: L/S & R/S Sta.: 0+060.00 - 0+200.00, End Wall at left and Right Side, Turn-in Drainage (R/S) Sta.: 0+160.00 - additional Fund - 50 Million
 
5894 SASUMAN, MARY LOUISE J. PLANNING Conduct Focus Group Discussion (FGD) for Cogon Bacaca SRIP LARP formulation activities in Brgy. Cogon Bacaca, Kiblawan August 27, 2024 100 August 27, 2024 Completed.
 
5895 SASUMAN, MARY LOUISE J. PLANNING Conduct Focus Group Discussion (FGD) for Cogon Bacaca SRIP LARP formulation activities in Brgy. Pasig, Kiblawan August 28, 2024 100 August 28, 2024 Completed.
 
5896 SASUMAN, MARY LOUISE J. PLANNING Attend multi-sectoral meeting/consultation for the preparation of the Balutakay River Watershed cum Vulnerability Assessment spearheaded by DENR-CENRO Digos City August 29, 2024 100 August 29, 2024 Completed.
 
5897 SASUMAN, MARY LOUISE J. PLANNING Coordinate and follow-up with the OPAG Davao del Sur on their response to the communication letter on the inquiry of market value of standing crops. August 29, 2024 100 August 29, 2024 Completed.
 
5898 CAYABYAB, REY JIM PLANNING Conduct Focus Group Discussion (FGD) and Socio-Economic Survey (SES) on Project Affected Persons (PAPs) situated in Brgy. Cogon Bacaca of Cogon Bacaca SRIP for LARP formulation August 27, 2024 100 August 27, 2024
 
5899 CAYABYAB, REY JIM PLANNING Conduct Focus Group Discussion (FGD) and Socio-Economic Survey (SES) on Project Affected Persons (PAPs) situated in Brgy. Pasig of Cogon Bacaca SRIP for LARP formulation August 28, 2024 100 August 28, 2024
 
5900 CAYABYAB, REY JIM PLANNING Conduct Focus Group Discussion (FGD) and Socio-Economic Survey (SES) on Project Affected Persons (PAPs) situated in Brgy. Pasig & Brgy. Lati-an of Cogon Bacaca SRIP for LARP formulation August 29, 2024 100 August 29, 2024
 
5901 CAYABYAB, REY JIM PLANNING Prepare travel request and trip ticket for the conduct of FGD at Brgy. Litos and Brgy. Clib for Cogon Bacaca SRIP LARP formulation August 30, 2024 100 August 30, 2024
 
5903 HERNAN, ALDEN PLANNING Conduct FGD for Cogon Bacaca SRIP at Brgy. Pasig, Kiblawan August 28, 2024 100 August 27, 2024 completed
 
5904 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP topographic map August 27, 2024 25 August 27, 2024 On going
 
5905 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP topographic map August 28, 2024 35 August 28, 2024 On going
 
5906 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities August 28, 2024 100 August 28, 2024 Completed
 
5907 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP topographic map August 29, 2024 45 August 29, 2024 On going
 
5908 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities August 29, 2024 100 August 29, 2024 Completed
 
5909 MARTURILLAS, JOHN LLOYD PLANNING Polishing of Pagan SRIP topographic map August 30, 2024 55 August 30, 2024 On going
 
5910 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities August 30, 2024 100 August 30, 2024 Completed
 
5911 HERNAN, ALDEN PLANNING Conduct FGD for Cogon Bacaca SRIP at Brgy. Cogon Bacaca, Kiblawan August 27, 2024 100 August 28, 2024 completed
 
5912 HERNAN, ALDEN PLANNING Conduct FGD for Cogon Bacaca SRIP at Brgy. Pasig, Kiblawan August 29, 2024 100 August 29, 2024 completed
 
5914 HERNAN, ALDEN PLANNING Continue drafting of Cogon Bacaca SRIP at Lateral D1 August 30, 2024 80 August 30, 2024 ongoing
 
5915 CUICO, JHO-ANN A. PLANNING Receive, Record, Reproduce, Field and distribute engineering Documents August 30, 2024 100 August 30, 2024 COMPLETED
 
5916 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 30, 2024 100 August 30, 2024 COMPLETED: MAL RIS: Protection Dike 0+060.00 - 0+200.00 = 140 Meters, End wall at L&R Side, Turn-in Drainage (R/S)
 
5917 CUICO, JHO-ANN A. PLANNING Prepared Layout Map for Focus Group Discussion (FGD) of Cogon Bacaca SRIP (General Layout Map, Irrigation Network per turn-out, Parcellary per Lateral) August 30, 2024 100 August 30, 2024 COMPLETED
 
5919 ESPADERA, MA LOURDES PLANNING Process result of Map Test at Suawan SRIP August 20, 2024 100 August 20, 2024
 
5922 ESPADERA, MA LOURDES PLANNING Plot and Update Miral SRIS Parcellary Survey Data as of Aug 19, 2024 August 20, 2024 100 August 20, 2024
 
5923 ESPADERA, MA LOURDES PLANNING Plot and Update Miral SRIS Parcellary Survey Data as of Aug 21, 2024 August 22, 2024 100 August 22, 2024
 
5924 ESPADERA, MA LOURDES PLANNING Attended Exit Meeting for Suawan SRIP Map Test August 22, 2024 100 August 22, 2024
 
5925 CUICO, JHO-ANN A. PLANNING Drafting of River training Structure for New Cabasagan CIS (Sta. 0+016.11) August 31, 2024 100 August 31, 2024 COMPLETED
 
5926 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments August 31, 2024 100 August 31, 2024 COMPLETED: Layout Map for Modification of Intake Structure of Main Dam
 
5927 ESPADERA, MA LOURDES PLANNING Plot and Update Miral SRIS Parcellary Survey Data as of Aug 22, 2024 August 27, 2024 100 August 27, 2024
 
5928 ESPADERA, MA LOURDES PLANNING Inquire NAMRIA for the GNSS Data Evaluation updates of Suawan SRIP August 27, 2024 100 August 27, 2024
 
5929 ESPADERA, MA LOURDES PLANNING Conducted Project Identification at Baguio District, Davao City August 28, 2024 100 August 28, 2024
 
5930 ESPADERA, MA LOURDES PLANNING Conducted Project Identification at Brgy Bantol, Marilog District, Davao City August 29, 2024 100 August 29, 2024
 
5931 ESPADERA, MA LOURDES PLANNING Conducted Site Inspection at Suawan River - Tamugan SIP August 30, 2024 100 August 30, 2024
 
5933 ESPADERA, MA LOURDES PLANNING Prepare Map Layout for Project ID Activity August 27, 2024 100 August 27, 2024
 
5938 INTO, LEE WARREN PLANNING Assist in drafting of Upper Kabasagan CIS Protection Works DED August 31, 2024 100 August 31, 2024 Drafted Cross-Sections for Sta. 0+500.00 to Sta. 1+113.96. Drafted Plan & Profile for Sta 0+000.00 to Sta. 1+113.96.
 
5939 INTO, LEE WARREN PLANNING Assist in drafting of New Cabasagan CIS DED August 31, 2024 100 August 31, 2024 Prepared preliminary data and instructed Jho-Ann for the drafting of the River Training structure and taught techniques in section detailing.
 
5945 LUARDO, GLENN D. PLANNING Conduct Focus Group Discussion (FGD) and Socio-Economic Survey (SES) on Project Affected Persons (PAPs) situated in Brgy. Cogon Bacaca of Cogon Bacaca SRIP for LARP formulation August 27, 2024 100 August 27, 2024
 
5946 LUARDO, GLENN D. PLANNING Conducted Project Identification at Baguio District, Davao City August 28, 2024 100 August 28, 2024
 
5947 LUARDO, GLENN D. PLANNING Conducted Project Identification at Brgy Bantol, Marilog District, Davao City August 29, 2024 100 August 29, 2024
 
5948 LUARDO, GLENN D. PLANNING Conducted Site Inspection at Suawan River - Tamugan SIP August 30, 2024 100 August 30, 2024
 
5957 ESPADERA, MA LOURDES PLANNING Prepare DTR and WAR September 2, 2024 100 September 2, 2024
 
5958 ESPADERA, MA LOURDES PLANNING Check Survey Team Personnel DTRs, WARs, and attachments September 2, 2024 100 September 2, 2024
 
5959 ESPADERA, MA LOURDES PLANNING Revise payroll for JO Personnel September 2, 2024 100 September 2, 2024
 
5960 ESPADERA, MA LOURDES PLANNING Prepare Survey Team Travel Documents September 2, 2024 100 September 2, 2024
 
5961 ESPADERA, MA LOURDES PLANNING Prepare BTOR for project ID at Baguio District and Brgy Bantol September 2, 2024 100 September 2, 2024 30% Accomplishment
 
5968 INTO, LEE WARREN PLANNING Worked on a DED monitoring template for Padada RIS DEDs. September 2, 2024 45 September 2, 2024 Made few inputs in the prepared template as per available Padada RIS DEDs in the office.
 
5969 INTO, LEE WARREN PLANNING Attend the Alternate Wetting and Drying (AWD) Water Saving Technology Training/Seminar September 3, 2024 100 September 3, 2024 Attended.
 
5970 INTO, LEE WARREN PLANNING Edited and polished Upper Kabasagan CIS Protection Works Downstream DED. September 2, 2024 100 September 2, 2024 Polished few errors and pasted cross-sections into proper template. Compiled DED into PDF for checking by RIO.
 
5975 HERNAN, ALDEN PLANNING Continue drafting of of lat. D1 str. comb. Rd. X-ing (1+318.62) August 19, 2024 100 August 19, 2024 completed
 
5976 HERNAN, ALDEN PLANNING continue drafting of lat. d1 str. : comb. rd. x-ing w/ vertical drop (sta. 1+509.70) August 20, 2024 100 August 20, 2024 completed
 
5977 HERNAN, ALDEN PLANNING continue drafting of lat. D1 str. : Tun-out r/s (sta. 1+533.80), Inclined Rectangular drop August 21, 2024 90 August 21, 2024 ongoing
 
5978 HERNAN, ALDEN PLANNING continue drafting of lat. D1 str. : rectangular Inclined drop, Check str. w/ Turn Out (2+418.23) August 22, 2024 90 August 22, 2024 ongoing
 
5979 HERNAN, ALDEN PLANNING Continue drafting lat. B str.: Rd. x-ing (sta. 0+126.06), Rectangular Inclined Drop, Vertical drop (sta. 0+343.31) August 23, 2024 25 August 23, 2024 ongoing
 
5980 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 2, 2024 100 September 2, 2024 - Attended flag raising ceremony. - Site inspected plantation sites. - Transplanted 61 Rambutan seedlings. - Sowed 91 durian & 227 marang seeds at PRIS nursery.
 
5981 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 3, 2024 100 September 3, 2024 - Site inspected plantation sites at Clib for turn-over. - Assisted in sowing of 20 durian & 80 calamansi seeds.
 
5982 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 4, 2024 100 September 4, 2024 - Site inspected Malabang plantation sites. - Assisted in sowing of 96 marang & 32 lansones seeds.
 
5983 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 5, 2024 100 September 5, 2024 - Site inspected and facilitated site clearing at Mahayahay & damsite for turn-over. - Instructed personnel to make frame for contract farming tarpaulins. -
 
5984 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 6, 2024 100 September 6, 2024 - Site inspected & facilitated clearing at Langa-an & San miguel plantation. - Collected seeds from DSSC Agriculture & Agroforestry Dept. - Sowed various seeds at PRIS nursery & facilitated bagging of soil media.
 
6010 INTO, LEE WARREN PLANNING Skimmed over the synology drive to check for all obtainable existing DED's of Padada River Irrigation System September 5, 2024 100 September 5, 2024 Completed skimming synology drive and finalize a draft inventory for Padada RIS DEDs. Inventory is accessible via Google Sheets.
 
6011 INTO, LEE WARREN PLANNING Write a letter to RIO requesting for the authorization of deployment of 1 personnel to conduct inventory at RIO for Padada RIS DEDs September 5, 2024 100 September 5, 2024 Completed draft.
 
6016 ESPADERA, MA LOURDES PLANNING Prepare BTOR for project ID at Baguio District and Brgy Bantol September 3, 2024 100 September 3, 2024 Completed draft as per teams comments
 
6017 ESPADERA, MA LOURDES PLANNING Prepare PDD Form 1 for Marapata Creek - Bantol SIP and Talomo River - Baguio PIP September 3, 2024 100 September 3, 2024
 
6018 ESPADERA, MA LOURDES PLANNING Assisted in presenting the initial findings during the project identification activities September 4, 2024 100 September 4, 2024
 
6019 ESPADERA, MA LOURDES PLANNING Edited BTOR for project ID at Baguio District and Brgy Bantol September 4, 2024 100 September 4, 2024 Completed with additional recommendations following the last presentation with DFT and JUM
 
6020 ESPADERA, MA LOURDES PLANNING Attended virtual meeting with CEST with regards to their request for contract suspension and concerns to the submission of Topographic Map September 5, 2024 100 September 5, 2024
 
6021 ESPADERA, MA LOURDES PLANNING Conducted site visit during the on-going surveying activities at Mal RIS September 5, 2024 100 September 5, 2024
 
6022 ESPADERA, MA LOURDES PLANNING Plotted Mal RIS - Malabang SIP Survey Data September 6, 2024 100 September 6, 2024
 
6023 ESPADERA, MA LOURDES PLANNING Miscellaneous Works: Facilitate Survey Team Travel Request Edit PDD Form 1 of Baguio PIP (New Proposed Diversion Dam) Updated WAR September 6, 2024 100 September 6, 2024
 
6024 INTO, LEE WARREN PLANNING Revise Miral SRIS - MIDP 2021 POW September 6, 2024 100 September 6, 2024 Completed draft.
 
6025 SASUMAN, MARY LOUISE J. PLANNING Conduct FGD for Cogon Bacaca LARP activities in Brgy. Litos, Sulop, Davao del Sur September 2, 2024 100 September 2, 2024 Completed.
 
6026 SASUMAN, MARY LOUISE J. PLANNING Draft communication letter for the pruning activity. September 2, 2024 100 September 2, 2024 Completed.
 
6027 SASUMAN, MARY LOUISE J. PLANNING Conduct FGD for Cogon Bacaca LARP activities in Brgy. Pasig, Sulop, Davao del Sur September 3, 2024 100 September 3, 2024 Completed.
 
6028 SASUMAN, MARY LOUISE J. PLANNING Coordinate with the landowners for the conduct of confirmatory test pit sampling in Cogon Bacaca submerged area September 3, 2024 100 September 3, 2024 Completed.
 
6029 SASUMAN, MARY LOUISE J. PLANNING Prepare documents needed for the coordination meeting with Department of Agrarian Reform (DAR) relative to LARP activities in Cogon Bacaca SRIP September 4, 2024 100 September 4, 2024 Completed.
 
6030 SASUMAN, MARY LOUISE J. PLANNING Attend coordination meeting with DAR personnel relative to LARP activities in Cogon Bacaca SRIP September 4, 2024 100 September 4, 2024 Completed.
 
6031 SASUMAN, MARY LOUISE J. PLANNING Coordinate with DDO IMO PDU Head relative to the proposed SRIP activities September 4, 2024 100 September 4, 2024 Completed.
 
6032 SASUMAN, MARY LOUISE J. PLANNING Prepare the attachment for the liquidation of the conducted FGD of Cogon Bacaca SRIP September 5, 2024 100 September 5, 2024 Completed.
 
6033 SASUMAN, MARY LOUISE J. PLANNING Convey communication letter to NCIP Office, Davao del Sur September 5, 2024 100 September 5, 2024 Completed.
 
6034 SASUMAN, MARY LOUISE J. PLANNING Compile the geotagged photos for the 26 pumps of Miral SRIS for the application of CNC September 5, 2024 100 September 5, 2024 Completed.
 
6035 SASUMAN, MARY LOUISE J. PLANNING Draft communication letter for IVC formulation indicating legal basis September 5, 2024 100 September 5, 2024 Completed.
 
6036 SASUMAN, MARY LOUISE J. PLANNING Desk reviewed the location of the proposed grab sampling site for aggregates September 5, 2024 100 September 5, 2024 Completed.
 
6038 SASUMAN, MARY LOUISE J. PLANNING Prepare and organize shapefiles of landowners/claimants for Cogon Bacaca LARP formulation and implementation activities. September 6, 2024 60 September 6, 2024 On-going preparation of shapefiles.
 
6059 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony September 2, 2024 100 September 2, 2024
 
6061 LUARDO, GLENN D. PLANNING Prepare layout map for the conducted Project ID at Baguio District, Davao City. September 2, 2024 100 September 2, 2024
 
6062 LUARDO, GLENN D. PLANNING Prepare layout map for the conducted Project ID at Brgy. Bantol, Marilog District, Davao City. September 3, 2024 100 September 3, 2024
 
6063 LUARDO, GLENN D. PLANNING Prepare layout map for the conducted site inspection of the existing Suawan River - Tamugan SIP Project at Brgy. Tamugan, Marilog District, Davao City. September 4, 2024 100 September 4, 2024 Other Accomplishment: Canvass Electrical Equipment to be used by the Planning personnel (100%).
 
6064 LUARDO, GLENN D. PLANNING Presentation of the conducted Project ID at Baguio District, Brgy. Bantol, Marilog District and the site inspection at Suawan River - Tamugan SIP Project at the Office of the Manager September 4, 2024 100 September 4, 2024
 
6065 LUARDO, GLENN D. PLANNING Attend the Capability Building on Provincial Product Accounts with Provincial Statistics Committee of Davao del Sur at The Ritz Hotel, Garden Oases, Davao City September 5, 2024 100 September 5, 2024
 
6066 LUARDO, GLENN D. PLANNING Attend the Technical Writing Training-Workshop for NIA Davao del Sur IMO Personnel at Federation Building, NIA Compound, Digos City September 6, 2024 100 September 6, 2024
 
6067 LUARDO, GLENN D. PLANNING Troubleshoot Manger's Office internet connection and rewire cable that causes failure September 3, 2024 100 September 3, 2024
 
6068 CAYABYAB, REY JIM PLANNING Conduct Focus Group Discussion (FGD) for Cogon Bacaca LARP activities in Brgy. Litos, Sulop, Davao del Sur September 2, 2024 100 September 2, 2024
 
6069 CAYABYAB, REY JIM PLANNING Conduct Focus Group Discussion (FGD) for Cogon Bacaca LARP activities in Brgy. Clib, Sulop, Davao del Sur September 3, 2024 100 September 3, 2024
 
6070 CUICO, JHO-ANN A. PLANNING Attended flag raising ceremony September 2, 2024 100 September 2, 2024 COMPLETED
 
6073 CAYABYAB, REY JIM PLANNING Prepare documents for coordination meeting with DAR Davao del Sur for the LARP activities of Cogon Bacaca SRIP September 4, 2024 100 September 4, 2024
 
6074 CAYABYAB, REY JIM PLANNING Attend coordination meeting with DAR Davao del Sur personnel relative to LARP activities in Cogon Bacaca SRIP September 4, 2024 100 September 4, 2024
 
6075 CAYABYAB, REY JIM PLANNING Attend and participate in "Writing to serve: Technical training-workshop for NIA Davao del Sur IMO employees" September 5, 2024 100 September 5, 2024
 
6076 EUGENIO, VENANN PLANNING Attend AWD Water Saving Technology Seminar September 3, 2024 100 September 3, 2024 Accomplishments within the week: Update shapefiles & prepare layout map of Miral SRIS proposed amendments for IMT contract; Process LUC applications.
 
6077 CAYABYAB, REY JIM PLANNING Attend and participate in "Writing to serve: Technical training-workshop for NIA Davao del Sur IMO employees" September 6, 2024 100 September 6, 2024
 
6078 EUGENIO, VENANN PLANNING Submit data (Parcellary, Profile, Cross-section, & Location of nearest powerline) of Proposed Drip Irrigation Project September 6, 2024 100 September 6, 2024 Other accomplishments within the week: Delineate parcellary of Malabang SIP service area; Prepare template of CIS lined and unlined canal length; Assist in the preparation of the profile, cross-section & the location of the nearest powerline of Malabang
 
6079 CUICO, JHO-ANN A. PLANNING Work on minor corrections of River Training Structure for New Cabasagan CIS (sta. 0+016.11) September 2, 2024 100 September 2, 2024 COMPLETED
 
6082 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments September 2, 2024 100 September 2, 2024 COMPLETED: Titugop SIS - Repair CIS CY 2024 Modification of Diversion / Check Structure and Construction of Protection Dike (Sta. 0+000.00 - 0+021.00 = 21 Meters)
 
6083 HERNAN, ALDEN PLANNING Conduct FGD of Cogon Bacaca SRIP at Brgy. Litos, Sulop, Davao del Sur September 2, 2024 100 September 2, 2024 completed
 
6084 HERNAN, ALDEN PLANNING Conduct FGD of Cogon Bacaca SRIP at Brgy. Clib, Davao del Sur September 3, 2024 100 September 3, 2024 completed
 
6085 HERNAN, ALDEN PLANNING Attend and participate Technical Writing Seminar and Workshop at IA Fed. Bldg. September 5, 2024 100 September 5, 2024 completed
 
6086 HERNAN, ALDEN PLANNING Attend and participate Technical Writing Seminar and Workshop at IA Fed. Bldg. September 9, 2024 100 September 6, 2024 comleted
 
6088 CUICO, JHO-ANN A. PLANNING Receive, Record, Reproduce, Field and distribute engineering Documents September 3, 2024 100 September 3, 2024 COMPLETED
 
6089 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments September 3, 2024 100 September 3, 2024 COMPLETED: San Isidro CIS - REPAIR-CIS - CY 2024 - Modification of Diversion Dam, Construction of Protection Dike sta.: 0+000.00 - 0+014.00 = 216.00 Meters
 
6091 HERNAN, ALDEN PLANNING Continue drafting of canal structures of Cogon Bacaca SRIP at lat. B: lat. B1 hdgate, bullcart x-ing (sta. 0+568.56), RID, September 4, 2024 30 September 4, 2024 on-going
 
6092 CUICO, JHO-ANN A. PLANNING Updating an irrigation canal and preparing a general layout map (2024) September 3, 2024 100 September 3, 2024 COMPLETED
 
6093 CUICO, JHO-ANN A. PLANNING Prepare Perspective view of River Training Structure for New Cabasagan CIS (sta. 0+016.11) - using sketch up September 4, 2024 100 September 4, 2024 COMPLETED
 
6094 CUICO, JHO-ANN A. PLANNING Receive LUC Documents, Input Details to LOGBOOK LUC Tracker September 4, 2024 100 September 4, 2024 COMPLETED
 
6095 CUICO, JHO-ANN A. PLANNING Attended Writing to serve: Technical Writing Training-workshop for NIA Davao del Sur Imo Employees September 5, 2024 100 September 5, 2024 COMPLETED
 
6096 CUICO, JHO-ANN A. PLANNING Attended Writing to serve: Technical Writing Training-workshop for NIA Davao del Sur Imo Employees September 6, 2024 100 September 6, 2024 COMPLETED
 
6129 MARTURILLAS, JOHN LLOYD PLANNING Attend the University of the Philippines Training Center for Applied Geodesy and Photogrammetry's training course September 2, 2024 42 September 6, 2024 * Polishing of Pagan SRIP topographic map (for Submission to RIO) (Completed)
 
6131 ENCABO, PRINCESS SHAIRA MAE PLANNING Proposal for the ERDB Technical Assistance Guidedlines September 13, 2024 100 September 13, 2024 For signing of Engr. DFT.
 
6132 ESPADERA, MA LOURDES PLANNING BTOR of Bantol and Baguio District September 12, 2024 90 September 13, 2024
 
6133 INTO, LEE WARREN PLANNING Checklist for PRIS Plans inventory September 12, 2024 100 September 12, 2024 Completed inventory (DEDs available in IMO only)
 
6134 LUARDO, GLENN D. PLANNING PPD on NORTH LAMIDAN PIP, LACARON PIP, BALAWANAN SRIP September 12, 2024 100 September 12, 2024 Already submitted PDD for review.
 
6135 CAYABYAB, REY JIM PLANNING Proposal for the coordination meeting with other stakeholders re the creation of IVC for formulation of LARP September 12, 2024 100 September 12, 2024
 
6136 ENCABO, PRINCESS SHAIRA MAE PLANNING Letter for TURNOVER for the landowners for R&P YEAR 1 September 13, 2024 100 September 13, 2024 Completed.
 
6137 ENCABO, PRINCESS SHAIRA MAE PLANNING Remaining Year 3 to Year 5 IWRMP PLAN for MAL AND PADADA RIS September 13, 2024 100 September 13, 2024 Submitted printed lay-out for PRIS and MRIS.
 
6138 ENCABO, PRINCESS SHAIRA MAE PLANNING Success Stories report on R&P MAL AND PADADA RIS September 13, 2024 100 September 13, 2024 Completed and submitted.
 
6139 ESPADERA, MA LOURDES PLANNING Draft communication letter to RIO with regards to Survey and Mapping activities of SUAWAN SRIP September 13, 2024 30 September 13, 2024
 
6140 SASUMAN, MARY LOUISE J. PLANNING Presentation for IVC stakeholders meeting September 16, 2024 100 September 18, 2024 Completed.
 
6141 SASUMAN, MARY LOUISE J. PLANNING Daft LARP Formulation for RIO Presentation September 20, 2024 10 September 20, 2024 On-going.
 
6142 LUARDO, GLENN D. PLANNING BTOR on CAPACITY BUILDING ON PROVINCIAL PRODUCT ACCOUNTS September 13, 2024 80 September 13, 2024 Other Accomplishment: Prepared PDD for Balutakay River - Matanao SRIP (100%).
 
6168 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. September 10, 2024 100 September 10, 2024 - Attended flag raising ceremony. - Facilitated bagging of soil & planting of seeds at PRIS nursery. - Facilitated canal clearing and assistance for contract farming.
 
6169 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. September 11, 2024 100 September 11, 2024 - Site monitored Year 2 sites. - Facilitated hauling of waste materials from PRIS old building. - Facilitated bagging of soil & making of rooting chamber. - Facilitated personnel for canal clearing & assistance for contract farming.
 
6170 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. September 12, 2024 100 September 12, 2024 - Drafted proposal for training, letter for turn-over & success stories for PRIS/MRIS. - Facilitated hauling of waste materials from PRIS old building. - Facilitated bagging of soil & making of rooting chamber. - Facilitated personnel for canal clearin
 
6178 ESPADERA, MA LOURDES PLANNING Attend Work Accountability and Complete Staff Work (CSW) Training September 12, 2024 100 September 12, 2024
 
6179 ESPADERA, MA LOURDES PLANNING Attend Work Accountability and Complete Staff Work (CSW) Training September 13, 2024 100 September 13, 2024
 
6184 ESPADERA, MA LOURDES PLANNING Finalized PDD Form 1 of Bantol SIP and Baguio SIP September 11, 2024 100 September 11, 2024
 
6186 ESPADERA, MA LOURDES PLANNING Finalized Letter to Mr. Canubas (Pagan SRIP Land Owner) September 11, 2024 100 September 11, 2024
 
6190 ESPADERA, MA LOURDES PLANNING Drafted Malabang SIP Profile and Cross Section September 11, 2024 100 September 11, 2024 Completed by MD Pasagdan
 
6191 ESPADERA, MA LOURDES PLANNING Checked and Printed Malabang SIP Profile and Cross Section September 11, 2024 100 September 11, 2024
 
6195 ESPADERA, MA LOURDES PLANNING Discussed with DM the recommendations for Surveying Activities to be conducted in compliance to CEST Comments following the Map Test Inquire NAMRIA the amount of registration fee Prepare Travel Documents of Survey Team September 11, 2024 100 September 11, 2024
 
6196 ESPADERA, MA LOURDES PLANNING Drafted Letter to Brgy, Bantol, ABC of Baguio District and to Mr. Canubas (Pagan SRIP Land Owner) September 10, 2024 100 September 10, 2024
 
6197 ESPADERA, MA LOURDES PLANNING Prepare Travel Documents of Survey Team September 10, 2024 100 September 10, 2024
 
6198 ESPADERA, MA LOURDES PLANNING Miscellaneous: Facilitate meeting with Survey Team with regards to Mal RIS Survey Data Update Miral SRIS Accomplishment September 10, 2024 100 September 10, 2024
 
6199 INTO, LEE WARREN PLANNING Prepare Detialed Engineering Design: Plan and Profile for Parat RMC & LMC September 9, 2024 100 September 9, 2024 Prepared template, Gathered design data (survey,geotags) and preliminary design (hydraulic elements).
 
6200 INTO, LEE WARREN PLANNING Attend 4-day Seminar and Workshop Re: MC 105 S. 2023 Annual Preparation of Operation and Maintenance Plan. (September 10 - 13, 2024) September 10, 2024 100 September 13, 2024 Attended.
 
6202 ESPADERA, MA LOURDES PLANNING Finalized Letter to Brgy. Bantol September 11, 2024 100 September 11, 2024
 
6234 INTO, LEE WARREN PLANNING Printing of the edited Mal RIS: ISFIAM Sabo Dam DED (4 pages) September 16, 2024 100 September 16, 2024 Printed with transmittal.
 
6266 INTO, LEE WARREN PLANNING Prepare FSDE Report as of September 15, 2024 September 17, 2024 100 September 17, 2024 Prepared 3 copies for signing. Sent advance e-copy to RIO.
 
6269 EUGENIO, VENANN PLANNING Attend Training/Seminar on Work Accountability and Complete Staff Work (September 12-13, 2024) September 13, 2024 100 September 13, 2024 Other accomplishments within the week: Official submission of Revised FY 2026 AIP; Updating of CIS lined and unlined canal length; Process LUC applications; Assist LUC and TOT applicants.
 
6286 INTO, LEE WARREN PLANNING Printing of Blucon Albatana CIS DED: Sluice Gate Shelter. September 18, 2024 100 September 18, 2024 Completed with Transmittal.
 
6287 LUARDO, GLENN D. PLANNING Attend and Participate in Flag Raising Ceremony September 10, 2024 100 September 10, 2024
 
6288 LUARDO, GLENN D. PLANNING Prepare Requisition Slip of equipment for Survey Team September 10, 2024 100 September 10, 2024 Other Accomplishment: Revised PPMP of Planning and Design Unit for the 2nd Sem. of CY 2024 (70%).
 
6289 LUARDO, GLENN D. PLANNING Revise PPMP of Planning and Design Unit for the 2nd Sem. of CY 2024 September 11, 2024 100 September 11, 2024 Other accomplishments: Prepared PR for Oil and Fuel used by Planning and Design Unit Activities (100%), Prepared PR for Fertilizers/Agro-chemical used for crops maintenance of IWRMP Implementation of Padada and Mal RIS (100%).
 
6290 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony September 10, 2024 100 September 10, 2024 COMPLETED
 
6292 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents September 10, 2024 100 September 10, 2024 COMPLETED
 
6293 CUICO, JHO-ANN A. PLANNING Prepared Layout map and Update canal Alignment of Canals (UNLINED and LINED) BUNOT CIS: Main Canal, Lateral A, Lateral B September 10, 2024 100 September 10, 2024 COMPLETED
 
6294 CUICO, JHO-ANN A. PLANNING Prepared Layout map and Update canal Alignment of Canals (UNLINED and LINED) MABINI BARAYONG CIS: Main Canal, Lateral A, Lateral B, Supplementary Canal September 11, 2024 100 September 11, 2024 COMPLETED
 
6295 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Document September 11, 2024 100 September 11, 2024 COMPLETED
 
6296 CUICO, JHO-ANN A. PLANNING Prepared layout Map for POW, PCR and Turn-over Attachments September 11, 2024 100 September 11, 2024 COMPLETED
 
6297 CUICO, JHO-ANN A. PLANNING Prepared Layout map and Update canal Alignment of Canals (UNLINED and LINED) SAN AGUSTIN CIS: Lateral A, Lateral B, Lateral B1. Lateral B-1a, Lateral B2, Lateral C September 12, 2024 100 September 12, 2024 COMPLETED
 
6298 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents September 12, 2024 100 September 12, 2024 COMPLETED
 
6299 CUICO, JHO-ANN A. PLANNING Finalized Layout map for CNC / Water Permit Application of DATU DANWATA SIP, LITTLE BAGUIO II SIP, CULAMAN SIP September 13, 2024 100 September 13, 2024 COMPLETED
 
6300 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents September 13, 2024 100 September 13, 2024 COMPLETED
 
6301 CUICO, JHO-ANN A. PLANNING General cleaning preparation for Upcoming ISO AUDIT September 13, 2024 100 September 13, 2024 COMPLETED
 
6302 CUICO, JHO-ANN A. PLANNING Attend Flag Raising Ceremony September 16, 2024 100 September 16, 2024 COMPLETED
 
6303 CUICO, JHO-ANN A. PLANNING Finalize Layout map for CNC / Water Permit Application of SALOY SIP, SUAWAN RIVER - TAMUGAN SIP, MOAB SIP, LATIAN RIVER- SAN ROQUE SIP - PANTANG September 16, 2024 100 September 16, 2024 COMPLETED
 
6304 CUICO, JHO-ANN A. PLANNING Receive, Record, Reproduce, Field and distribute engineering Documents September 16, 2024 100 September 16, 2024 COMPLETED
 
6305 CUICO, JHO-ANN A. PLANNING Finalize Layout map for CNC / Water Permit Application of TITUGOP SIP, NEW VISAYAS SIP, SAN MIGUEAL SIP, SINAWILAN SIP September 17, 2024 100 September 17, 2024 COMPLETED
 
6306 CUICO, JHO-ANN A. PLANNING Input Data to LUC Logbook Tracker for O&M Tracker September 17, 2024 100 September 17, 2024 COMPLETED
 
6307 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony September 16, 2024 100 September 16, 2024
 
6308 LUARDO, GLENN D. PLANNING Participate in the ISO audit activity. September 16, 2024 50 September 16, 2024 Other accomplishment: Prepared DTR for September 1-15, 2024 (100%).
 
6309 LUARDO, GLENN D. PLANNING Participate in the ISO audit activity. September 17, 2024 100 September 17, 2024 Other accomplishment: Prepared PR for Cogon Bacaca LARP meeting Activity, Fuel and Oil, Survey Team Uniform (100%).
 
6310 CAYABYAB, REY JIM PLANNING Prepare PERT-CPM for the Program of Works (POW) of San Jose PIP September 10, 2024 100 September 10, 2024
 
6314 CAYABYAB, REY JIM PLANNING Print and bind Program of Works (POW) of San Jose PIP September 11, 2024 100 September 11, 2024
 
6315 CAYABYAB, REY JIM PLANNING Prepare communication letters to the proposed IVC members for the scheduled coordination meeting September 13, 2024 100 September 13, 2024
 
6316 CAYABYAB, REY JIM PLANNING Convey communication letters to each of the IVC members for the scheduled coordination meeting September 13, 2024 100 September 13, 2024
 
6317 CAYABYAB, REY JIM PLANNING Drafting of Lateral B4 (Sta. 3+361.32-3+782.69) for Padada RIS Modernization DED September 14, 2024 100 September 14, 2024 09/12/2024 - Accomplished 20% 09/13/2024 - Accomplished 50% 09/14/2024 - Accomplished 100%
 
6330 SASUMAN, MARY LOUISE J. PLANNING Conduct confirmatory test pitting and grab sampling of Cogon Bacaca SRIP at Brgy. Cogon Bacaca, Kiblawan, Davao del Sur September 10, 2024 100 September 10, 2024 Completed.
 
6331 SASUMAN, MARY LOUISE J. PLANNING Conduct confirmatory test pitting and grab sampling of Cogon Bacaca SRIP at Brgy. Cogon Bacaca, Kiblawan, Davao del Sur September 11, 2024 100 September 11, 2024 Completed.
 
6332 SASUMAN, MARY LOUISE J. PLANNING Attend ISO Meeting on the upcoming ISO Audit September 11, 2024 100 September 11, 2024 Completed.
 
6333 SASUMAN, MARY LOUISE J. PLANNING Prepare and submitted ISO Reports for Training and Education Team. September 12, 2024 100 September 12, 2024 Completed.
 
6334 SASUMAN, MARY LOUISE J. PLANNING Compile and edited geotagged photo as attachment on the submission of the CNC application of Miral SRIS (26 pumps) September 12, 2024 100 September 12, 2024 Completed.
 
6335 SASUMAN, MARY LOUISE J. PLANNING Prepare Commercial Sand and Gravel (CSAG) Certification September 12, 2024 100 September 12, 2024 Completed.
 
6336 SASUMAN, MARY LOUISE J. PLANNING Attend Risk Management Team meeting September 12, 2024 100 September 12, 2024 Completed.
 
6337 SASUMAN, MARY LOUISE J. PLANNING Draft communication letter as reply to DPWH Davao del Sur DEO re: Construction for the extension of lining canal September 12, 2024 100 September 12, 2024 Completed.
 
6338 SASUMAN, MARY LOUISE J. PLANNING Update and printed PDU Organizational Chart and Personnel Locator Chart September 13, 2024 100 September 13, 2024 Completed.
 
6339 SASUMAN, MARY LOUISE J. PLANNING Convey communication letters for the conduct of IVC meeting to LGUs Kiblawan and Sulop, Davao del Sur September 13, 2024 100 September 13, 2024 Completed.
 
6341 HERNAN, ALDEN PLANNING Continue drafting of Rectangular Inclined Drop at Lateral D1 at Cogon Bacaca SRIP at sta. 1+558.75 - sta. 1+644.77 September 10, 2024 100 September 10, 2024 completed
 
6342 HERNAN, ALDEN PLANNING Continue drafting of Rectangular Inclined Drop at Lateral D1 at Cogon Bacaca SRIP at sta. 1+989.00- sta. 2+418.23 September 11, 2024 100 September 11, 2024 completed
 
6345 HERNAN, ALDEN PLANNING Continue drafting of Road cossing Structure sta. 0+129.00 at Cogon Bacaca SRIP Lateral B September 12, 2024 100 September 12, 2024 completed
 
6346 HERNAN, ALDEN PLANNING Continue drafting of Rectangualar Inclined Drop sta. 0+168.10c-sta. 230.27 at Cogon Bacaca SRIP lat B September 12, 2024 65 September 12, 2024 ongoing
 
6347 HERNAN, ALDEN PLANNING Continue drafting of Vertical Drop , sta. 0+343.31 at Cogon Bacaca SRIP Lateral B September 13, 2024 65 September 13, 2024 ongoing
 
6348 HERNAN, ALDEN PLANNING Continue drafting of Lat. B1 hdgate , sta. 0+451.00 at Cogon Bacaca SRIP Lateral B September 13, 2024 65 September 13, 2024 ongoing
 
6352 SASUMAN, MARY LOUISE J. PLANNING Participate in ISO Audit. September 16, 2024 100 September 16, 2024 Completed.
 
6353 SASUMAN, MARY LOUISE J. PLANNING Prepare DTR and WAR for the period of September 1-15, 2024. September 16, 2024 100 September 16, 2024 Completed.
 
6354 SASUMAN, MARY LOUISE J. PLANNING Prepare payroll and compile DTR and WAR for the JO personnel assigned in Cogon Bacaca SRIP. September 16, 2024 100 September 16, 2024 Completed.
 
6355 SASUMAN, MARY LOUISE J. PLANNING Participate ISO Audit for Training and Education Team. September 17, 2024 100 September 17, 2024 Completed.
 
6358 SASUMAN, MARY LOUISE J. PLANNING Attend ISO Audit exit meeting. September 17, 2024 100 September 17, 2024 Completed.
 
6359 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 16, 2024 100 September 16, 2024 Completed - Attended flag raising ceremony. - Checked DTRs, prepared and submitted payroll for PRIS and MRIS field personnel. - Facilitated canal clearing & oversee nursery works and other related activities on field.
 
6360 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 17, 2024 100 September 17, 2024 Completed. - Facilitated hauling of materials at PRIS office old building & canal clearing. - Assisted in grafting of seedlings at PRIS nursery.
 
6361 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 18, 2024 100 September 18, 2024 Completed. - Facilitated clearing at PRIS office old building. - Facilitated nursery activities (bagging, scion collection and grafting) at PRIS.
 
6362 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 19, 2024 100 September 19, 2024 Completed. - Continued delineation of areas for additional management areas for PRIS and MRIS.
 
6363 ESPADERA, MA LOURDES PLANNING Draft Letter to Brgy Lamidan and RIO XI September 17, 2024 100 September 17, 2024
 
6364 SASUMAN, MARY LOUISE J. PLANNING Prepare and compile data needed for IVC meeting. September 17, 2024 100 September 17, 2024 Completed.
 
6365 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 20, 2024 100 September 20, 2024 Completed. - Updated Monitoring form for IWRMP as per CO instructions. - Printed lay-out for delineated areas for PRIS and MRIS. - Facilitated clearing at PRIS office and utilize plastic bottles as hanging pots.
 
6366 ESPADERA, MA LOURDES PLANNING Edit Back to Office Report for Project ID at Brgy Lamidan and Baguio Dist September 18, 2024 100 September 18, 2024
 
6367 SASUMAN, MARY LOUISE J. PLANNING Attend meeting on water permit acquisition at NIA RIO. September 19, 2024 100 September 19, 2024 Completed.
 
6368 ESPADERA, MA LOURDES PLANNING Prepare Inventory of Mal RIS Available Survey Data and GFC Plans (Year 2022 - Present) September 16, 2024 100 September 16, 2024
 
6369 EUGENIO, VENANN PLANNING ISO Audit September 16, 2024 100 September 16, 2024 Other accomplishments withing the week: Assist LUC and TOT applicants; Submit updated CIS Inventory of lined and unlined canal; Process travel documents.
 
6370 ESPADERA, MA LOURDES PLANNING Checked and Edited TEV of Survey Team September 20, 2024 100 September 16, 2024
 
6371 SASUMAN, MARY LOUISE J. PLANNING Participate in the IVC meeting for Cogon Bacaca Formulation. September 20, 2024 100 September 20, 2024 Completed.
 
6372 ESPADERA, MA LOURDES PLANNING Prepare DTR, WAR and other Attachments September 16, 2024 100 September 16, 2024
 
6373 ESPADERA, MA LOURDES PLANNING Checked and conformed Survey Team DTRs and WARs September 16, 2024 100 September 16, 2024
 
6374 EUGENIO, VENANN PLANNING Attend Meeting on Acquisition of Water Permit September 19, 2024 100 September 19, 2024 other accomplishments: Prepare indicative POW of FY 2026 Project proposal; Prepare layout map for FVR attachment
 
6375 SASUMAN, MARY LOUISE J. PLANNING Prepare NWRB Certificate of Posting. September 20, 2024 100 September 20, 2024 Completed.
 
6376 SASUMAN, MARY LOUISE J. PLANNING Finalize the reply letter to DPWH DEO Davao del Sur. September 20, 2024 100 September 20, 2024 Completed.
 
6377 ESPADERA, MA LOURDES PLANNING Prepare/ Update Accomplishment of Miral SRIS Parcellary with Layout Map September 16, 2024 100 September 16, 2024
 
6378 CAYABYAB, REY JIM PLANNING Prepare DTR for the period of September 1-15, 2024. September 16, 2024 100 September 16, 2024
 
6380 CAYABYAB, REY JIM PLANNING Assist in the preparation of payroll for JO personnel in Cogon Bacaca SRIP September 16, 2024 100 September 16, 2024
 
6381 CAYABYAB, REY JIM PLANNING Prepare initial detailed inventory of PAPs for LARP of Cogon Bacaca SRIP September 17, 2024 100 September 17, 2024
 
6382 CAYABYAB, REY JIM PLANNING Prepare communication letter to RIO and BIR for the IVC meeting of LARP formulation September 18, 2024 100 September 18, 2024
 
6383 CAYABYAB, REY JIM PLANNING Convey communication letter to BIR - Davao del Sur September 18, 2024 100 September 18, 2024
 
6384 CAYABYAB, REY JIM PLANNING Prepare the delineation of the proposed working area including the stockyard, bunkhouse and equipment area, and office of Cogon Bacac SRIP September 19, 2024 100 September 19, 2024
 
6385 CAYABYAB, REY JIM PLANNING Attend the IVC meeting for LARP formulation of Cogon Bacaca SRIP September 20, 2024 100 September 20, 2024
 
6393 CUICO, JHO-ANN A. PLANNING Finalize Layout map for CNC / Water Permit Application of SAN JOSE SIP, NEW VISAYAS SIP, SALOY SIP September 18, 2024 100 September 18, 2024 COMPLETED
 
6394 CUICO, JHO-ANN A. PLANNING Receive, Record, Reproduce, Field and distribute engineering Documents September 18, 2024 100 September 18, 2024 COMPLETED
 
6396 CUICO, JHO-ANN A. PLANNING Finalize Layout map for CNC / Water Permit Application of TITUGOP SIP, TANWAANG SIP, CULAMAN SIP September 19, 2024 100 September 19, 2024 COMPLETED
 
6398 CUICO, JHO-ANN A. PLANNING Input Data to LUC Logbook Tracker for O&M Tracker September 19, 2024 100 September 19, 2024 COMPLETED
 
6400 CUICO, JHO-ANN A. PLANNING Finalize Layout map for CNC / Water Permit Application of DATU DANWATA SIP, LATIAN RIVER - SAN ROQUE SIP, SALOY 2 SIP, NEW SILAY SIP September 20, 2024 100 September 20, 2024 COMPLETED
 
6402 CUICO, JHO-ANN A. PLANNING Receive, Record, Reproduce, Field and distribute engineering Documents September 20, 2024 100 September 20, 2024 COMPLETED
 
6403 CUICO, JHO-ANN A. PLANNING Prepare Layout Map for POW, PCR and Turn-over Attachments September 20, 2024 100 September 20, 2024 COMPLETED
 
6409 LUARDO, GLENN D. PLANNING Encode data from the conducted Socio-Economic Survey for LARP of the Proposed Cogon Bacaca SRIP September 20, 2024 80 September 20, 2024 On Sept. 18-19, 2024, encoded data of the conducted Socio-Economic Survey for LARP of the proposed Cogon Bacaca SRIP (60%), Posting 2 ITB, NOA, and NTP of NIA Irrigation Projects (100%), Pick-up Canvass for PDU IT equipment request (100%).
 
6415 ESPADERA, MA LOURDES PLANNING Prepare Presentation with regards to Suawan SRIP Site Conditions September 16, 2024 100 September 16, 2024
 
6416 ESPADERA, MA LOURDES PLANNING Prepare monitoring of PRIS Roads Survey Data September 20, 2024 100 September 20, 2024
 
6417 ESPADERA, MA LOURDES PLANNING Plotted 7 LUC Applications Title September 19, 2024 100 September 19, 2024
 
6418 ESPADERA, MA LOURDES PLANNING Miscellaneous: Follow-up 5 clients of LUC Aplications September 20, 2024 100 September 20, 2024
 
6419 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of IWRMP Progress Report for the month of September. September 23, 2024 100 September 23, 2024 Printed and submitted. Other activity: - Attended flag raising ceremony.
 
6420 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate field activities in plantation sites, PRIS office and nursery. September 23, 2024 100 September 23, 2024 Facilitate round weeding at Malabang plantation sites, hauling of documents from PRIS old building, maintenance at nursery.
 
6423 MARTURILLAS, JOHN LLOYD PLANNING Attend the University of the Philippines Training Center for Applied Geodesy and Photogrammetry's training course ( September 3-24, 2024 ); September 20, 2024 80 September 20, 2024 On-going
 
6424 INTO, LEE WARREN PLANNING Conducted Site validation at Padada RIS Expansion Area September 23, 2024 100 September 24, 2024 Inspected and took geotagged pictures of proposed access road at for proposed dam site of Kitaha Creek. Inspected damsite locations and creek sources.
 
6440 INTO, LEE WARREN PLANNING Prepared Initial Design for Lateral A-1 under Padada RIS Modernization. September 21, 2024 25 September 21, 2024 Templates prepared and few detailed design necessities.
 
6441 INTO, LEE WARREN PLANNING Conduct inventory of Existing Detailed Engineering Designs of Padada River Irrigation System for Padada RIS Modernization at Regional Office XI. September 25, 2024 75 September 25, 2024 Inventory to resume on September 30
 
6464 HERNAN, ALDEN PLANNING Continue drafting of rectangular Inclined Drop at Cogon Bacaca SRIP at Lateral B1 (sta. 0+168.10 - 0+230.27) September 16, 2024 100 September 16, 2024 completed
 
6465 HERNAN, ALDEN PLANNING Continue drafting of Cogon Bacaca SRIP Lat. B Vertical Drop (sta. 0+343.31) September 17, 2024 100 September 17, 2024 completed
 
6466 HERNAN, ALDEN PLANNING Continue drafting of Cogon Bacaca SRIP Lateral B , lateral B1 hdgate (sta. 0+451.00) September 17, 2024 100 September 17, 2024 completed
 
6467 HERNAN, ALDEN PLANNING Continue Drafting of Cogon Bacaca SRIP Lateral B, Bullcart Crossig (sta. 0+472.11) September 18, 2024 100 September 18, 2024 completed
 
6468 HERNAN, ALDEN PLANNING Continue drafting of Cogon Bacaca SRIP Lateral B, Vertical Drop (sta. 0+480.00) September 18, 2024 100 September 18, 2024 completed
 
6469 HERNAN, ALDEN PLANNING Continue drafting of Cogon Bacaca SRIP Lateral B , Bullcart Crossing (sta. 0+568.56, sta. 0+609.52, sta. 0+636.61) September 19, 2024 100 September 19, 2024 completed
 
6470 HERNAN, ALDEN PLANNING Attend and participate Key Stakeholders Meeting on the Formation of Inventory and Valuation Committee (IVC) for Cogon Bacaca SRIP Land Acquistion and Resettlement Plan (LARP) at I.A Fed. Bldg. September 20, 2024 100 September 20, 2024 completed
 
6490 INTO, LEE WARREN PLANNING Conduct Site inspection on New Cabasagan Sub-Dam, Upper Kabasagan Dam and Padada RIS Modernization proposed dam structures together with RIO personnel. September 26, 2024 100 September 27, 2024 Completed.
 
6491 INTO, LEE WARREN PLANNING Prepare draft of Badagoy CIS Program of Works CY 2025. September 27, 2024 100 September 27, 2024 Printed accomplished draft for checking by Construction head.
 
6494 ENCABO, PRINCESS SHAIRA MAE PLANNING Oversee roundweeding at Malabang plantation sites. Facilitate canal clearing at PRIS main canal. Facilitate hauling of relevant documents from PRIS old building. September 24, 2024 100 September 24, 2024 Completed.
 
6495 ENCABO, PRINCESS SHAIRA MAE PLANNING Oversee nursery maintenance and activities. September 24, 2024 100 September 24, 2024 Facilitated clearing of nursery periphery.
 
6496 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 25, 2024 100 September 25, 2024 Site inspected areas to inspect pest incidence on plants. Other activities: - Facilitated transferring of pre-germinated seedlings within nursery. - Facilitated hauling of relevant documents from PRIS old building.
 
6497 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 26, 2024 100 September 26, 2024 Completed. Other activity: - Facilitated canal clearing at PRIS damsite.
 
6498 ENCABO, PRINCESS SHAIRA MAE PLANNING Oversee nursery maintenance and activities. September 26, 2024 100 September 26, 2024 - Facilitated in transferring of recovering seedlings. - Transplanted 173 marang seedlings. - Facilitated clearing of nursery storage and periphery.
 
6499 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. September 27, 2024 100 September 27, 2024 Completed. - Conducted an interview with Mr. Ameril Buat success in planting of calamansi from the project.
 
6500 ENCABO, PRINCESS SHAIRA MAE PLANNING Oversee nursery activities. September 27, 2024 100 September 27, 2024 - Hauled bamboo seedlings for planting. - Hauled soil media intended for bagging. - Bagging of soil media and transferring of pre-germinated seedlings to new bag.
 
6501 ENCABO, PRINCESS SHAIRA MAE PLANNING Revision of turn-over letter for PRIS an MRIS year 1 landowners. September 27, 2024 100 September 27, 2024 Completed, for printing.
 
6502 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony. September 23, 2024 100 September 23, 2024 Completed.
 
6503 SASUMAN, MARY LOUISE J. PLANNING Prepare Cogon Bacaca SRIP Land Acquisition and Resettlement Plan (LARP): Chapter 1 September 23, 2024 100 September 23, 2024 Completed.
 
6504 SASUMAN, MARY LOUISE J. PLANNING Prepare NWRB Certificate of Posting September 23, 2024 100 September 23, 2024 Completed.
 
6506 SASUMAN, MARY LOUISE J. PLANNING Prepare Cogon Bacaca SRIP Land Acquisition and Resettlement Plan (LARP): Chapter 3 September 24, 2024 100 September 24, 2024 Completed.
 
6507 SASUMAN, MARY LOUISE J. PLANNING Review and comment the turn-over letter for IWRMP PRIS an MRIS year 1 landowners. September 24, 2024 100 September 24, 2024 Completed.
 
6508 SASUMAN, MARY LOUISE J. PLANNING Attend Staff Meeting. September 25, 2024 100 September 25, 2024 Completed.
 
6509 SASUMAN, MARY LOUISE J. PLANNING Prepare the final MOA for Inventory and Valuation Committee (IVC) for Cogon Bacaca LARP September 26, 2024 100 September 26, 2024 Completed. For final checking.
 
6510 SASUMAN, MARY LOUISE J. PLANNING Attend meeting with BIR personnel for the formation of IVC for Cogon Bacaca LARP September 26, 2024 100 September 26, 2024 Completed.
 
6512 SASUMAN, MARY LOUISE J. PLANNING Prepare the minutes of the meeting on the conducted IVC Formation for the Cogon Bacaca LARP September 27, 2024 100 September 27, 2024 Completed. For checking.
 
6513 EUGENIO, VENANN PLANNING Attend DDS IMO Staff Meeting September 25, 2024 100 September 25, 2024 Other accomplishments within the week: Update and submit Davao del Sur province canal length shapefile; Prepare indicative POW of FY 2026 Project proposal.
 
6514 EUGENIO, VENANN PLANNING Attend virtual meeting on Pantang CIS September 25, 2024 100 September 25, 2024 Other accomplishments within the week: Prepare travel documents; Assist LUC and TOT applicants.
 
6515 SASUMAN, MARY LOUISE J. PLANNING Prepare draft communication letter re:Request For Assistance in Stopping Quarry Activities in the Upstream Area of Suawan River-Tamugan SIP September 27, 2024 100 September 27, 2024 Completed.
 
6516 EUGENIO, VENANN PLANNING Inspection of applied area for conversion at Matanao September 27, 2024 100 September 27, 2024 Other accomplishments within the week: Prepare and submit data and layout map requested by IDU; Process LUC and TOT applications.
 
6517 SASUMAN, MARY LOUISE J. PLANNING Participate in the zumba session in celebration of the 124th Civil Service Month. September 27, 2024 100 September 27, 2024 Completed.
 
6518 CAYABYAB, REY JIM PLANNING Attend flag raising ceremony. September 23, 2024 100 September 23, 2024
 
6519 MARTURILLAS, JOHN LLOYD PLANNING Attended the University of the Philippines Training Center for Applied Geodesy and Photogrammetry's training course entitled, "Global Navigation Satellite Systems" September 23, 2024 90 September 23, 2024 On-going
 
6520 MARTURILLAS, JOHN LLOYD PLANNING Attended the University of the Philippines Training Center for Applied Geodesy and Photogrammetry's training course entitled, "Global Navigation Satellite Systems" September 24, 2024 100 September 24, 2024 Completed
 
6521 MARTURILLAS, JOHN LLOYD PLANNING Travel time from NIA Central Office to NIA DDS IMO September 25, 2024 100 September 25, 2024 Completed
 
6522 CAYABYAB, REY JIM PLANNING Draft communication letter re: Schedule of Detailed Inventory for LARP formulation September 23, 2024 100 September 23, 2024
 
6523 MARTURILLAS, JOHN LLOYD PLANNING Prepare liquidation of Travel September 26, 2024 83 September 26, 2024 *BTOR *Contract
 
6524 MARTURILLAS, JOHN LLOYD PLANNING Plotted 8 LUC applications September 26, 2024 100 September 26, 2024 Completed
 
6525 MARTURILLAS, JOHN LLOYD PLANNING Plotted Pagan SRIP Main Canal Alignment and topo-map September 27, 2024 30 September 27, 2024 On-going
 
6526 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities September 27, 2024 100 September 27, 2024 Completed
 
6527 CAYABYAB, REY JIM PLANNING Prepare response letter to Ceboley IA re: request for concreting of dam apron downstream September 24, 2024 100 September 24, 2024
 
6528 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony September 23, 2024 100 September 23, 2024
 
6529 CAYABYAB, REY JIM PLANNING Prepare Program of Works (POW) for New Cabasagan CIS for FY 2025 September 30, 2024 80 September 30, 2024 On-going revision of DED as a result of the conducted site inspection last September 26, 2024.
 
6530 ESPADERA, MA LOURDES PLANNING Conduct Survey Activities at Padada RIS - Access Roads (Modernization) September 23, 2024 100 September 23, 2024
 
6531 ESPADERA, MA LOURDES PLANNING Conducted Consultation Meeting with Mr. Canubas and relatives regarding the proposed Pagan SRIP September 25, 2024 100 September 25, 2024
 
6532 LUARDO, GLENN D. PLANNING Prepare layout map of the identified water source and potential service area at Sitio Malyab, Brgy. Little Baguio, Malita, Davao Occidental. September 23, 2024 100 September 23, 2024
 
6534 LUARDO, GLENN D. PLANNING Prepare layout map of the identified water source and potential service area at Brgy. Dimoloc, Malita, Davao Occidental. September 24, 2024 100 September 24, 2024
 
6535 ESPADERA, MA LOURDES PLANNING Conducted face-to-face meeting with Altrade, Inc. regarding the relocation of main canal under Lacson CIS September 27, 2024 100 September 27, 2024
 
6537 LUARDO, GLENN D. PLANNING Prepare Power Point Presentation for the conduct of project orientation of the affected land owner of the Proposed Pagan SRIP, located at Brgy. Tamugan, Marilog District, Davao City. September 24, 2024 100 September 24, 2024
 
6538 ESPADERA, MA LOURDES PLANNING Finalize Letter to Baguio District ABC with regards to the initial findings and recommendations on the conducted project identification September 26, 2024 100 September 24, 2024
 
6539 CAYABYAB, REY JIM PLANNING Prepare updated canal alignment with canal width, berm, and service road for detailed inventory of Cogon Bacaca SRIP LARP September 27, 2024 100 October 5, 2024 Remaining works - Main canal (final alignment requested from RIO) October 5, 2024 - Completed.
 
6540 ESPADERA, MA LOURDES PLANNING Draft Letter response to RIO with regards to Altrade, Inc canal relocation request at Lacson CIS September 24, 2024 100 September 24, 2024
 
6541 LUARDO, GLENN D. PLANNING Conduct project orientation of the affected land owner of the Proposed Pagan SRIP at Brgy. Tamugan, Marilog District, Davao City September 25, 2024 100 September 25, 2024
 
6542 CAYABYAB, REY JIM PLANNING Attend meeting with BIR personnel for the formation of IVC of Cogon Bacaca SRIP LARP September 26, 2024 100 September 26, 2024
 
6543 LUARDO, GLENN D. PLANNING Encode data from the conducted Socio-Economic Survey for LARP of the Proposed Cogon Bacaca SRIP September 26, 2024 100 September 26, 2024 Other accomplishment: Consolidate encoded data for LARP of the Proposed Cogon Bacaca SRIP (40%).
 
6544 CAYABYAB, REY JIM PLANNING Participate in the zumba session in celebration of the 124th Civil Service Month. September 27, 2024 100 September 27, 2024
 
6546 ESPADERA, MA LOURDES PLANNING Draft letter to RIO with regards to meeting with CO last September 17, 2024: Suawan SRIP Technical Discussion September 24, 2024 100 September 24, 2024
 
6547 ESPADERA, MA LOURDES PLANNING Prepare powerpoint presentation for the meeting with Altrade, Inc. September 24, 2024 100 September 24, 2024
 
6548 LUARDO, GLENN D. PLANNING Consolidate encoded data for LARP of the Proposed Cogon Bacaca SRIP September 27, 2024 100 September 27, 2024
 
6549 LUARDO, GLENN D. PLANNING Prepare 3 PR of the Planning and Design Unit Activities September 27, 2024 100 September 27, 2024
 
6554 ENCABO, PRINCESS SHAIRA MAE PLANNING Print documents (turn-over letter, request for extension of JO's). September 30, 2024 100 September 30, 2024 Printed and submitted.
 
6555 ENCABO, PRINCESS SHAIRA MAE PLANNING Checked DTR of field personnel and prepared payroll. September 30, 2024 100 September 30, 2024 Completed
 
6556 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate nursery works (bagging, transplanting, grafting); Hauling of remaining materials from PRIS old building. September 30, 2024 100 September 30, 2024 Completed
 
6560 ESPADERA, MA LOURDES PLANNING Prepare Liquidation on the attended Complete Staf Work and Accountability Seminar September 26, 2024 100 September 26, 2024
 
6561 ESPADERA, MA LOURDES PLANNING Updated monitoring/ inventory of roads survey data within Padada RIS September 24, 2024 100 September 24, 2024
 
6565 HERNAN, ALDEN PLANNING Continue drafting of Turn-Out (R/S) @ sta. 0+898.81 of Cogon Bacaca SRIP Lateral B September 26, 2024 100 September 26, 2024 completed
 
6566 HERNAN, ALDEN PLANNING Continue drafting of Turn-Out @ sta. 1+107.43 of Cogon Bacaca SRIP Lateral B September 27, 2024 100 September 27, 2024 completed
 
6567 HERNAN, ALDEN PLANNING Drafting of Elevated Flume @ sta. 1+055.03 to 1093.03 of Cogon Bacaca SRIP Lateral B September 27, 2024 20 September 27, 2024 ongoing
 
6592 LUARDO, GLENN D. PLANNING Prepare CHAPTER 2 - Socio Econ aspect for Cogon Bacaca LARP October 11, 2024 0 N/A
 
6602 INTO, LEE WARREN PLANNING Continue Drafting of Padada RIS: Lateral A1 September 30, 2024 50 September 30, 2024 Drafted Plan and Profile.
 
6603 INTO, LEE WARREN PLANNING Prepare DE Indicative POW of Asbang SRIP (10M) October 3, 2024 100 October 3, 2024 Completed.
 
6604 INTO, LEE WARREN PLANNING Prepare DE Indicative POW of Suawan SRIP (12M) October 3, 2024 100 October 3, 2024 Completed.
 
6605 INTO, LEE WARREN PLANNING Prepare FSDE Indicative POW of Matigol Spring - Ladian SIP (5M) October 3, 2024 100 October 3, 2024 Completed.
 
6606 INTO, LEE WARREN PLANNING Prepare FSDE Indicative POW of Lampanisaw Creek - Malamba SIP (5M) October 3, 2024 100 October 3, 2024 Completed.
 
6607 INTO, LEE WARREN PLANNING Prepare Pre-FS Indicative POW of Balatukan SRIP (6M) October 3, 2024 100 October 3, 2024 Completed.
 
6608 INTO, LEE WARREN PLANNING Prepare FSDE Indicative POW of Modernization of Mal RIS (12M) October 3, 2024 100 October 3, 2024 Completed.
 
6609 INTO, LEE WARREN PLANNING Worked on Badagoy CIS FY 2025 POW corrections as per Contruction Unit Head. October 3, 2024 100 October 3, 2024 Printed finished draft for final checking by Construction Unit Head.
 
6616 INTO, LEE WARREN PLANNING Prepare Preliminary Design for Padada RIS: Lateral AA September 4, 2024 100 October 4, 2024 Prepared template and design profile whole stretch. Ready for drafting.
 
6617 INTO, LEE WARREN PLANNING Costing of FSDE Funds (September 30 - October 4) October 4, 2024 100 October 4, 2024 Completed.
 
6618 INTO, LEE WARREN PLANNING Computed Funding Requirement of JO personnel. October 3, 2024 100 October 3, 2024 Completed.
 
6619 ENCABO, PRINCESS SHAIRA MAE PLANNING Nursery and plantation site visitation. October 3, 2024 100 October 3, 2024 - Site visitation at Malabang and Mahayahay plantation sites. - Transplanted marang seedlings.
 
6620 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate round weeding at plantation sites and assisted in nursery activties. October 4, 2024 100 October 4, 2024 - Facilitated round weeding at Clib plantation sites. - Facilitated in transplanting of guava apple seedlings. - Revised training proposal.
 
6621 EUGENIO, VENANN PLANNING Prepare indicative POW of FY 2026 Project proposal October 2, 2024 100 October 2, 2024 Other accomplishments within the week: Prepared 6 layout maps for FY 2026 AIP attachment; Assist LUC & TOT applicants.
 
6622 EUGENIO, VENANN PLANNING Update Annex 5 and Annex 6 (10-year plan) as of October 1, 2024 October 1, 2024 100 October 1, 2024 Other accomplishments within the week: Prepare indicative POW of FY 2026 Project proposal; Prepare and submit DTR and weekly accomplishment report.
 
6623 EUGENIO, VENANN PLANNING Prepare additional document for LUC certification as per new guidelines October 4, 2024 100 October 3, 2024 Other accomplishments within the week: Process LUC applications; Assist TOT applicants.
 
6653 SASUMAN, MARY LOUISE J. PLANNING Finalized the communication letter re: Request For Assistance in Stopping Quarry Activities in the Upstream Area of Suawan River Tamugan SIP September 30, 2024 100 September 30, 2024 Completed.
 
6654 SASUMAN, MARY LOUISE J. PLANNING Finalize the minutes of meeting on the conducted IVC Formation for the Cogon Bacaca LARP September 30, 2024 100 September 30, 2024 Completed.
 
6655 SASUMAN, MARY LOUISE J. PLANNING Finalize the MOA for Inventory and Valuation Committee (IVC) for Cogon Bacaca LARP September 30, 2024 100 September 30, 2024 Completed.
 
6656 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter for the renewal of PDU COS personnel September 30, 2024 100 September 30, 2024 Completed.
 
6657 SASUMAN, MARY LOUISE J. PLANNING Prepare Gannt chart for the activities on the conduct of detailed inventory for Cogon Bacaca LARP September 30, 2024 100 September 30, 2024 Completed.
 
6658 SASUMAN, MARY LOUISE J. PLANNING Prepare draft budget proposal for the conduct of detailed inventory for Cogon Bacaca LARP September 30, 2024 100 September 30, 2024 Completed.
 
6660 SASUMAN, MARY LOUISE J. PLANNING Attend coordination meeting with OPAG for the Cogon Bacaca LARP activities. October 2, 2024 100 October 2, 2024 Other accomplishment: on-going digitization of Cogon Bacaca SRIP canal alignment.
 
6661 SASUMAN, MARY LOUISE J. PLANNING Digitize canal alignment of Cogon Bacaca SRIP for the conduct of detailed inventory. October 4, 2024 100 October 4, 2024 Completed.
 
6662 INTO, LEE WARREN PLANNING Prepare Plan and Profile of Padada RIS Lateral AA and Templates for structures. October 5, 2024 50 October 5, 2024 Completed design and templates. Ready for drafting by draftsman.
 
6663 SASUMAN, MARY LOUISE J. PLANNING Attend Provincial Mining Regulatory Board (PMRB) Meeting via zoom October 4, 2024 100 October 4, 2024 Completed.
 
6664 CAYABYAB, REY JIM PLANNING Prepare Plan and Profile and Labelling of Lateral A1 of Padada RIS for Modernization September 30, 2024 100 September 30, 2024
 
6665 CAYABYAB, REY JIM PLANNING Prepare list of Additional Projects for CY 2024 October 1, 2024 100 October 1, 2024
 
6666 CAYABYAB, REY JIM PLANNING Prepare communication letters for the schedule of detailed inventory for Cogon Bacaca SRIP LARP October 2, 2024 100 October 2, 2024 October 1, 2024 - Accomplished 60%.
 
6667 CAYABYAB, REY JIM PLANNING Attend meeting with OPAG for IVC formation of Cogon Bacaca SRIP LARP October 2, 2024 100 October 2, 2024
 
6669 CAYABYAB, REY JIM PLANNING Meeting with MAGRO - Kiblawan and Sulop re: IVC formation for Cogon Bacaca SRIP LARP October 3, 2024 100 October 3, 2024
 
6670 CAYABYAB, REY JIM PLANNING Convey communication letters to the IVC members re: Schedule of detailed inventory for Cogon Bacaca SRIP LARP October 3, 2024 100 October 3, 2024
 
6671 CAYABYAB, REY JIM PLANNING Convey Memorandum of Agreement (MOA) of the IVC to OPAG October 4, 2024 100 October 4, 2024
 
6672 ESPADERA, MA LOURDES PLANNING Request Letter for Job Order Personnel (Survey Team) September 30, 2024 100 September 30, 2024
 
6673 ESPADERA, MA LOURDES PLANNING Draft request Letter for Job Order Personnel assigned at Marilog District, Davao City September 30, 2024 100 September 30, 2024
 
6674 ESPADERA, MA LOURDES PLANNING Update Previous 2 weeks Survey Activities Accomplishment September 30, 2024 100 September 30, 2024
 
6675 ESPADERA, MA LOURDES PLANNING Checked and Conformed Survey Personnel DTR September 30, 2024 100 September 30, 2024
 
6676 ESPADERA, MA LOURDES PLANNING Miscelllaneous: Update WAR Photocopy 3 copies of Survey Team TEV September 30, 2024 100 September 30, 2024
 
6678 ESPADERA, MA LOURDES PLANNING Draft Communication Letter to Mr. Armo Canubas as per his request last consultation meeting October 1, 2024 100 October 1, 2024
 
6679 ESPADERA, MA LOURDES PLANNING Draft Communication Letter to RIO - Request for Additional Allocation of Funds for Cogon Bacaca SRIP October 1, 2024 100 October 1, 2024
 
6680 ESPADERA, MA LOURDES PLANNING Finalize letter to RIO with regards to meeting with CO last September 17, 2024: Suawan SRIP Technical Discussion October 1, 2024 100 October 1, 2024
 
6681 ESPADERA, MA LOURDES PLANNING Prepare KMZ File for Survey of proposed SWES for PRIS Modernization October 1, 2024 100 October 1, 2024
 
6682 ESPADERA, MA LOURDES PLANNING Draft BTOR - Consultation Meeting at Armo Residence (09-25-24) October 2, 2024 100 October 2, 2024
 
6683 ESPADERA, MA LOURDES PLANNING Draft BTOR - Consultation Meeting at Altrade, Inc (09-27-24) October 2, 2024 100 October 3, 2024
 
6684 ESPADERA, MA LOURDES PLANNING Fianlize Communication Letter to RIO - Request Additional Funds to RIO for Cogon Bacaca SRIP October 2, 2024 100 October 2, 2024
 
6685 ESPADERA, MA LOURDES PLANNING Draft Letter to DDN IMO - Return of Levelling Survey Instrument October 2, 2024 100 October 2, 2024
 
6686 ESPADERA, MA LOURDES PLANNING Finalize Communication Letter to Mr. Armo Canubas as per his request last consultation meeting October 3, 2024 100 October 3, 2024
 
6687 ESPADERA, MA LOURDES PLANNING Convert .dwg file of Bacungan SPIP to kmz file October 3, 2024 100 October 3, 2024
 
6688 ESPADERA, MA LOURDES PLANNING Finalize BTOR - Consultation Meeting at Armo Residence (09-25-24) and Altrade, Inc (09-27-24) October 4, 2024 100 October 4, 2024
 
6689 ESPADERA, MA LOURDES PLANNING Draft Communication Letter to Demoloc and Sitio Malyab Project Identification October 4, 2024 100 October 4, 2024
 
6690 ESPADERA, MA LOURDES PLANNING Draft Communication Letter for Matigol Spring - Lamidan SIP Project Identification October 4, 2024 100 October 4, 2024
 
6691 ESPADERA, MA LOURDES PLANNING Retrieve previous Back to Office and Resolution of Ovu - Manuvu re: Matigol Spring - Ladian SIP October 3, 2024 100 October 3, 2024
 
6694 ESPADERA, MA LOURDES PLANNING Participate in the year end games October 4, 2024 100 October 4, 2024
 
6695 ESPADERA, MA LOURDES PLANNING Prepare WAR and DTR October 1, 2024 100 October 1, 2024
 
6698 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites; Nursery visitation October 7, 2024 100 October 7, 2024 - Attended flag raising ceremony. - Site monitoring and facilitated round weeding at Brgy. Clib plantation sites.
 
6699 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites; Nursery visitation October 8, 2024 100 October 8, 2024 - Site monitoring and facilitated round weeding at Brgy. Mahayahay plantation sites. - Prepared necessary materials for the training on nursery management.
 
6700 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites; Nursery visitation October 9, 2024 100 October 9, 2024 - Conducted seedlings inventory at PRIS nursery. - Prepared certificates/materials for training. - Facilitated site clearing.
 
6701 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate training for personnel and landowners for PRIS and MRIS. October 10, 2024 100 October 10, 2024 Facilitated and attended the training.
 
6702 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites; Nursery visitation October 11, 2024 100 October 11, 2024 - Facilitated site clearing at damsite plantation site. - Draft BTOR for the training. - Continue editing of success story video. - Attended photo and videography training.
 
6709 ESPADERA, MA LOURDES PLANNING Update online Weekly Accomplishment Report October 7, 2024 100 October 7, 2024
 
6710 ESPADERA, MA LOURDES PLANNING Contact 8 LUC Clients October 7, 2024 100 October 7, 2024
 
6711 ESPADERA, MA LOURDES PLANNING Plot 3 Transfer of Title Certificates Application October 7, 2024 100 October 7, 2024
 
6712 ESPADERA, MA LOURDES PLANNING Draft Communication Letter to RIO - Request Funds for Pagan SRIP October 7, 2024 100 October 7, 2024
 
6713 ESPADERA, MA LOURDES PLANNING Prepare Survey Personnel TEV - Month of September October 7, 2024 100 October 7, 2024
 
6714 ESPADERA, MA LOURDES PLANNING Prepare Survey Team Travel Request October 7, 2024 100 October 7, 2024
 
6715 ESPADERA, MA LOURDES PLANNING Draft Justification for North Lamidan SIP Surveying Activities October 8, 2024 100 October 8, 2024
 
6743 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Pagan SRIP topographic map and Main Canal Alignment September 30, 2024 60 September 30, 2024
 
6744 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Pagan SRIP topographic map and Main Canal Alignment October 1, 2024 100 October 1, 2024
 
6745 MARTURILLAS, JOHN LLOYD PLANNING Drafting of Back To Office Report of TC26 GNSS Training Course October 1, 2024 35 October 1, 2024
 
6752 INTO, LEE WARREN PLANNING Final Printing of Badagoy CIS CY2025 Program of Works (5M) October 10, 2024 100 October 10, 2024 Printed five copies for signature.
 
6753 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Badagoy CIS CY 2025 (5M) October 10, 2024 100 October 10, 2024 Prepared and printed 5 copies.
 
6754 INTO, LEE WARREN PLANNING Prepare Project Layout for Badagoy CIS CY 2025 for POW attachment. October 10, 2024 100 October 10, 2024 Prepared and printed 5 copies.
 
6755 INTO, LEE WARREN PLANNING Prepare Detailed Engineering Design for Padada RIS Lateral A1 October 3, 2024 100 October 3, 2024 Completed canal design preliminaries. Completed all templates with guides for drafting. Forwarded to draftsman for drafting.
 
6756 INTO, LEE WARREN PLANNING Costing of FSDE Funds (October 7 - 11, 2024) October 11, 2024 100 October 11, 2024 Completed.
 
6894 LUARDO, GLENN D. PLANNING Prepared write-ups for the Chapter 2 for LARP of the proposed Cogon Bacaca SRIP September 30, 2024 30 September 30, 2024 Other Accomplishments: Delivered documents (e.i. Sworn Statement) for notary as attachment for the CNC application of the existing Solar Powered Pump irrigation facilities at Miral SRIS (100%), Revised, finalized and submitted the PDD Form 1 along with la
 
6895 LUARDO, GLENN D. PLANNING Attend meeting regarding the CSE and PPMP per unit for CY 2025 October 1, 2024 100 October 1, 2024 Other Accomplishment: Prepared CSE & PPMP of Planning and Design Unit (30%).
 
6896 ESPADERA, MA LOURDES PLANNING Print and facilitate attachment of supporting documents for the Survey Team TEV for the month of September October 8, 2024 100 October 8, 2024
 
6897 ESPADERA, MA LOURDES PLANNING Inventory of Available Survey Data vs FY 2026 AIP Projects October 9, 2024 100 October 9, 2024
 
6898 ESPADERA, MA LOURDES PLANNING Update Survey Team Accomplishment October 9, 2024 100 October 9, 2024
 
6899 LUARDO, GLENN D. PLANNING Prepare and submit CSE & PPMP output of Planning and Design Unit through OPPIS online website. October 2, 2024 100 October 2, 2024
 
6900 LUARDO, GLENN D. PLANNING Prepare Power Point presentation for Budget Forum of CY 2026 proposed project of NIA DDS-IMO. October 3, 2024 20 October 3, 2024
 
6901 LUARDO, GLENN D. PLANNING Prepare Power Point presentation for Budget Forum of CY 2026 proposed project of NIA DDS-IMO. October 4, 2024 80 October 4, 2024 Other accomplishment: Prepare Layout Map of Suawan River - Tamugan SIP, Balutakay River - Matanao SRIP and Bagumbayan PIP as attachment for the proposed projects of NIA DDS-IMO for CY 2026 (100%).
 
6907 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony October 7, 2024 100 October 7, 2024
 
6908 LUARDO, GLENN D. PLANNING Prepare Power Point presentation for Budget Forum of CY 2026 proposed project of NIA DDS-IMO. October 7, 2024 100 October 7, 2024
 
6912 EUGENIO, VENANN PLANNING Attend DDS IMO staff meeting and Budget Furom dry-run October 7, 2024 100 October 7, 2024 Other accomplishments: Prepare checklist/monitoring of AIP 2026 Budget Proposal attachments; Assist LUC and TOT applicants; Check TOTs and LUCs for printing
 
6915 ESPADERA, MA LOURDES PLANNING Finalize Communication Letter to RIO - Request Funds for Pagan SRIP October 9, 2024 100 October 9, 2024
 
6916 EUGENIO, VENANN PLANNING Update project descriptions of AIP 2026 Budget Proposal October 8, 2024 100 October 8, 2024 Other accomplishments: Prepare layout maps for AIP 2026 Budget Proposal attachment; Assist LUC and TOT applicants.
 
6917 ESPADERA, MA LOURDES PLANNING Translate Communication Letter to Mr. Armo Canubas as per his request last consultation meeting to Bisaya Dialect October 9, 2024 100 October 10, 2024
 
6918 EUGENIO, VENANN PLANNING Update FY 2026 Budget Furom Presentation October 9, 2024 100 October 9, 2024 Other Accomplishments: Assist LUC and TOT applicants; Prepare layout maps for AIP 2026 Budget Proposal attachment; Meeting with DFT.
 
6919 EUGENIO, VENANN PLANNING Prepare and submit data needed for the FY 2026 Budget Furom October 10, 2024 100 October 10, 2024 Other accomplishments: Assist LUC and TOT applicants; Check TOTs and LUCs for printing; Prepare layout maps for AIP 2026 Budget Proposal attachment.
 
6920 LUARDO, GLENN D. PLANNING Attend DDS IMO staff meeting and Budget Furom dry-run October 7, 2024 100 October 7, 2024
 
6921 EUGENIO, VENANN PLANNING Attend Online Orientation on Updated Guidelines on the issuance of NIA ICC October 11, 2024 100 October 11, 2024 Other accomplishments: Check TOTs and LUCs for printing.
 
6922 ESPADERA, MA LOURDES PLANNING Finalize Letter response to RIO with regards to Altrade, Inc canal relocation request at Lacson CIS October 9, 2024 100 October 10, 2024
 
6923 LUARDO, GLENN D. PLANNING Conduct Inventory of PAPs for LARP of the Proposed Cogon Bacaca SRIP at Brgy. Cogon Bacaca, Kiblawan, Davao del Sur October 8, 2024 100 October 8, 2024 Completed inventory of 5 PAPs.
 
6924 ESPADERA, MA LOURDES PLANNING Draft BTOR - Project ID at Sitio Malyab and Brgy Dimoloc, Malita, Davao Occidental October 10, 2024 100 October 11, 2024
 
6925 LUARDO, GLENN D. PLANNING Prepare Layout Map of Talandang PIP, Kapliko Creek - North Lamidan Sip and Balawanan River - Magsaysay SRIP as attachment for the proposed projects of NIA DDS-IMO for CY 2026. October 9, 2024 100 October 9, 2024 Other accomplishment: Attended coordination meeting with the NCIP Province regarding the Work and Financial Plan (WFP) of the Proposed Cogon Bacaca SRIP at NCIP Provincial Office, Matti, Digos City (100%).
 
6926 LUARDO, GLENN D. PLANNING Prepare Layout Map of Tolos Creek - Buda SIP, Talomo River - Dacudao PIP, Tacul Laya PIP and Kibangay PIP as attachment for the proposed projects of NIA DDS-IMO for CY 2026. October 10, 2024 100 October 10, 2024 Other Accomplishment: Attended the Basic Photography & Video Production Workshop at Federation Building, NIA DDS-IMO Compound (50%).
 
6927 ESPADERA, MA LOURDES PLANNING Attend Orientation on Updated Guidelines on the issuance of NIA ICC October 11, 2024 100 October 11, 2024
 
6928 LUARDO, GLENN D. PLANNING Attend coordination meeting with the Provincial Assessor's personnel regarding the identification of Land Owner through their latest tax declaration in line with the on-going LARP activity of NIA personnel of the Proposed Cogon Bacaca SRIP. October 11, 2024 100 October 11, 2024 Other accomplishment: Attended the Basic Photography & Video Production Workshop at Federation Building, NIA DDS-IMO Compound (100%).
 
6929 MARTURILLAS, JOHN LLOYD PLANNING Field verification at Mal RIS lateral E October 2, 2024 100 October 2, 2024
 
6930 MARTURILLAS, JOHN LLOYD PLANNING Drafting of Back to Office Report of TC26 GNSS Training Course October 2, 2024 80 October 2, 2024
 
6931 MARTURILLAS, JOHN LLOYD PLANNING Checking of Access Roads survey data of Kitaha-Igpit Expansion Area October 2, 2024 100 October 2, 2024
 
6932 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Kitaha-Igpit Modernization (Access Roads and Creeks) October 3, 2024 35 October 3, 2024
 
6933 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 1 LUC application October 3, 2024 100 October 3, 2024
 
6934 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 3, 2024 100 October 3, 2024
 
6935 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Padada RIS Parat LMC October 4, 2024 50 October 4, 2024
 
6936 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Padada RIS (Parat LMC) October 8, 2024 100 October 8, 2024
 
6937 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Kitaha-Igpit Modernization (Access Roads and Creeks) October 8, 2024 60 October 8, 2024
 
6938 MARTURILLAS, JOHN LLOYD PLANNING Follow-up / Update instrument calibrations and NAMRIA registrations of GNSS receivers October 8, 2024 100 October 8, 2024
 
6939 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Kitaha-Igpit Modernization (Access Roads and Creeks) October 9, 2024 100 October 9, 2024
 
6940 MARTURILLAS, JOHN LLOYD PLANNING Follow-up / Update instrument calibrations and NAMRIA registration of GNSS receivers October 9, 2024 100 October 9, 2024
 
6941 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 9, 2024 100 October 9, 2024
 
6942 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Asinan SPIP solar October 10, 2024 100 October 10, 2024
 
6943 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Kibangay SPIP Solar (Topographic map and propose pipe alignment) October 10, 2024 40 October 10, 2024
 
6944 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 10, 2024 100 October 10, 2024
 
6945 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Kibangay SPIP Solar (Topographic Map and propose pipe alignment) October 11, 2024 100 October 11, 2024
 
6946 MARTURILLAS, JOHN LLOYD PLANNING Checking of Survey data of Bagumbuhay SPIP Solar October 11, 2024 100 October 11, 2024
 
6947 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 11, 2024 100 October 11, 2024
 
6948 CAYABYAB, REY JIM PLANNING Prepare detailed inventory sheet for the conduct of detailed inventory of the project affected properties for LARP formulation of Cogon Bacaca SRIP October 7, 2024 100 October 7, 2024
 
6949 CAYABYAB, REY JIM PLANNING Convey MOA and communication letter to BIR RDO No. 115 re: conduct of detailed inventory at Cogon Bacaca SRIP October 7, 2024 100 October 7, 2024
 
6950 CAYABYAB, REY JIM PLANNING Attend Linoan SRIP LARP presentation at the NIA XI - Regional Office October 8, 2024 100 October 8, 2024
 
6951 CAYABYAB, REY JIM PLANNING Conduct detailed inventory of affected properties for LARP formulation of Cogon Bacaca SRIP October 11, 2024 100 October 11, 2024 Conducted inventory at Main Canal from Sta. 0+000.00 to Sta. 3+000.00
 
6952 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony. October 7, 2024 100 October 7, 2024 Completed.
 
6953 SASUMAN, MARY LOUISE J. PLANNING Attend ISO Team Meeting for the preparation of the third-party Audit. October 7, 2024 100 October 7, 2024 Other accomplishment: Prepare other relative documents for the conduct of detailed inventory for LARP Cogon Bacaca SRIP.
 
6954 SASUMAN, MARY LOUISE J. PLANNING Attend Linoan SRIP LARP presentation at the NIA XI - Regional Office October 8, 2024 100 October 8, 2024 Completed.
 
6956 SASUMAN, MARY LOUISE J. PLANNING Conduct detailed inventory of affected properties at main canal for LARP formulation of Cogon Bacaca SRIP October 11, 2024 80 October 11, 2024 On-going conduct of detailed inventory at main canal for LARP formulation of Cogon Bacaca SRIP
 
6971 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony October 14, 2024 100 October 14, 2024
 
6972 LUARDO, GLENN D. PLANNING Prepare request letter for additional workforce for the conduct of detailed inventory for LARP of the proposed Cogon Bacaca SRIP. October 14, 2024 100 October 14, 2024 Request letter for revised Other accomplishments: Assisted in Validating beneficiaries for "Kadiwa sa NIA Grand Launching 29/kg. of rice" (100%), Prepare PR for RTK Calibration (100%).
 
6976 ENCABO, PRINCESS SHAIRA MAE PLANNING Attended flag raising ceremony. October 14, 2024 100 October 14, 2024 Completed. - Assisted in validating beneficiaries for "Kadiwa sa NIA Grand Launching 29/kg. of rice
 
6978 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate walk-through on additional areas at PRIS. October 14, 2024 100 October 14, 2024 Completed, farmers meeting to be schedule. Other works: - Finalize annexes of the revised BTOR for CO. - Submitted draft BTOR for the recently conducted training.
 
6981 ESPADERA, MA LOURDES PLANNING Update/ Submit Accomplishment of Surveying Activities October 14, 2024 100 October 14, 2024
 
6982 ESPADERA, MA LOURDES PLANNING Finalize Four (4) Communication Letters/ BTORs October 14, 2024 100 October 14, 2024
 
6983 ESPADERA, MA LOURDES PLANNING Prepare September TEV October 14, 2024 100 October 14, 2024
 
6984 ESPADERA, MA LOURDES PLANNING Draft Response Letter to Admol Spring - Ladian SIP October 14, 2024 100 October 15, 2024
 
6985 ESPADERA, MA LOURDES PLANNING Edit Communication Letters with new header and footer October 15, 2024 100 October 15, 2024
 
6986 ESPADERA, MA LOURDES PLANNING Prepare KMZ File of Mal RIS FY 2026 for reference October 15, 2024 100 October 15, 2024
 
6987 ESPADERA, MA LOURDES PLANNING Update previous date accomplishment/ Prepare Survey Team Schedule for the month of October October 15, 2024 100 October 15, 2024
 
6988 ESPADERA, MA LOURDES PLANNING Prepare DTR and WAR October 15, 2024 100 October 15, 2024
 
6989 ESPADERA, MA LOURDES PLANNING Retrieve Gate Pass of Levelling Instrument lent by DDN IMO October 15, 2024 100 October 15, 2024
 
6992 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate in preparation of staking materials for plantation sites. October 15, 2024 100 October 15, 2024 Facilitated in the preparation of 500 bamboo staking.
 
6993 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare and disseminate DTR for the field personnel. October 15, 2024 100 October 15, 2024 Disseminated and collected the filled DTRs.
 
6997 INTO, LEE WARREN PLANNING Attend Virtual Meeting Re: FSDE Report Discussion October 14, 2024 100 October 14, 2024 Attended.
 
6998 INTO, LEE WARREN PLANNING Attend Technical Discussion Re: Padada RIS Modernization with RIO via Virtual Meeting. October 15, 2024 100 October 15, 2024 Attended.
 
6999 INTO, LEE WARREN PLANNING Final Printing of San Roque - Latian River SIP (Pantang Dam) Protection Works Downstream DED October 14, 2024 100 October 14, 2024 Completed.
 
7000 INTO, LEE WARREN PLANNING Prepare Approved Budget for Contract of Badagoy CIS (5M) October 15, 2024 100 October 15, 2024 Completed and printed 5 copies.
 
7001 INTO, LEE WARREN PLANNING Prepared the Application form for Building Permit of the Padada RIS Office located at Hagonoy October 16, 2024 100 October 16, 2024 Completed.
 
7002 INTO, LEE WARREN PLANNING Attend Technical Discussion Re: Padada RIS Modernization FSR with NIACO and RIO via virtual meeting. October 16, 2024 100 October 16, 2024 Attended.
 
7035 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepared DTRs and Payrolls for PRIS and MRIS nursery personnel. October 16, 2024 100 October 16, 2024 Completed.
 
7036 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate field activities for Padada RIS nursery personnel. October 16, 2024 100 October 16, 2024 Facilitated in gathering of staking materials and canal clearing.
 
7037 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate round weeding activity at plantation sites in Malabang, Hagonoy. October 17, 2024 100 October 17, 2024 Completed. Inspected plants current health status.
 
7038 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate preparation of additional staking materials for plantation sites. October 17, 2024 100 October 17, 2024 Completed 500 staking.
 
7039 ENCABO, PRINCESS SHAIRA MAE PLANNING Finalize BTOR for Training Workshop on Nursery Management. October 18, 2024 100 October 18, 2024 Completed and printed 3 copies.
 
7040 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare pertinent documents for the liquidation of cash advance from the recently conducted training workshop. October 18, 2024 100 October 18, 2024 Compiled all documents.
 
7043 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony October 14, 2024 100 October 14, 2024 Completed.
 
7044 SASUMAN, MARY LOUISE J. PLANNING Conduct detailed inventory of affected properties at main canal for LARP formulation of Cogon Bacaca SRIP October 14, 2024 100 October 14, 2024 Detailed inventory at main canal is completed. On-going detailed inventory in other proposed canal alignment.
 
7045 SASUMAN, MARY LOUISE J. PLANNING Prepare documents needed for the technical discussion with RIO on the Padada RIS Modernization FSR October 15, 2024 100 October 15, 2024 Completed.
 
7046 SASUMAN, MARY LOUISE J. PLANNING Attend technical discussion with RIO on the Padada RIS Modernization FSR. October 15, 2024 100 October 15, 2024 Completed.
 
7047 SASUMAN, MARY LOUISE J. PLANNING Prepare CSAG Certification October 15, 2024 100 October 15, 2024 Completed.
 
7049 SASUMAN, MARY LOUISE J. PLANNING Attend virtual technical discussion with CO and RIO personnel for the Padada RIS Modernization FSR. October 16, 2024 100 October 16, 2024 Completed.
 
7050 SASUMAN, MARY LOUISE J. PLANNING Attend the Review, Update, and Refinement of the Process Flow of the Planning and Design Section of NIA XI's RO and IMOs October 18, 2024 100 October 18, 2024 Attended last October 17-18, 2024.
 
7058 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Cabacungan Main Canal October 14, 2024 40 October 14, 2024 On-going
 
7059 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 1 LUC application October 14, 2024 100 October 14, 2024
 
7060 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 14, 2024 100 October 14, 2024
 
7061 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Cabacungan Main Canal October 15, 2024 100 October 15, 2024 Completed
 
7062 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Bagumbuhay SPIP October 15, 2024 10 October 15, 2024 On-going
 
7063 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 15, 2024 100 October 15, 2024
 
7064 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Asinan SPIP CY 2025 topographic map October 16, 2024 50 October 16, 2024 On-going
 
7065 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 16, 2024 100 October 16, 2024
 
7066 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Asinan SPIP CY 2025 topographic map October 17, 2024 100 October 17, 2024 Completed
 
7067 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Malabang SPIP topographic map October 17, 2024 25 October 17, 2024 On-going
 
7068 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 17, 2024 100 October 17, 2024
 
7070 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Malabang SPIP topographic map October 18, 2024 100 October 18, 2024 Completed
 
7071 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Bagumbuhay SPIP October 18, 2024 50 October 18, 2024 On-going
 
7072 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 18, 2024 100 October 18, 2024
 
7075 INTO, LEE WARREN PLANNING Revised Existing plan of Padada RIS Lateral B3 to adapt PRS92 control points and also as compliance to Padada RIS Modernization DED. October 19, 2024 50 October 19, 2024 Recomputed hydraulic elements as per actual conditions and dimensions. Proposed additional turn-outs.
 
7077 INTO, LEE WARREN PLANNING Final Printing of Upper Kabasagan CIS. October 21, 2024 100 October 21, 2024 Made few edits as per final Corrections from RIO. Printed accomplished DED as per instructed.
 
7078 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag raising ceremony. October 21, 2024 100 October 21, 2024 Attended.
 
7079 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring of plantation sites and nursery at PRIS. Oversee other activities therein. October 21, 2024 100 October 21, 2024 Visited and inspected Malabang & Clib plantation sites. Designated field personnel to various tasks (nursery maintenance, PRIS office clearing, Hauling of BBM Rice).
 
7080 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare IWRMP Progress Report for the month of October. October 22, 2024 100 October 22, 2024 Prepared and submitted.
 
7081 INTO, LEE WARREN PLANNING Design and Initial Drafting of Padada RIS Lateral AA Thresher Crossing Structures (10 units) and Inclined drop (1 unit). October 18, 2024 100 October 18, 2024 Completed and forwarded design spreadsheets with corresponding template in CAD file to draftsman for final drafting.
 
7082 INTO, LEE WARREN PLANNING Polishing of submitted draft of Padada RIS Lateral A1 cross-sections, plan and profile by draftsman. October 17, 2024 100 October 17, 2024 Completed and consolidated finished portions. Ready to proceed to structures.
 
7085 INTO, LEE WARREN PLANNING Prepare FSDE Report as of October 15, 2024 October 15, 2024 100 October 16, 2024 Printed 3 copies with transmittal and submitted advanced e-copy to RIO.
 
7087 INTO, LEE WARREN PLANNING Costing of FSDE Funds (October 14 - 18, 2024) October 18, 2024 100 October 18, 2024 Completed.
 
7089 INTO, LEE WARREN PLANNING Prepared Convergence Report for the month of September October 17, 2024 100 October 17, 2024 Printed 3 copies with transmittal and submitted advance e-copy to RIO.
 
7096 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites and nursery. October 22, 2024 100 October 22, 2024 - Monitored and inspected damsite plantation sites. - Assisted in selling of BBM rice at PRIS office. - Facilitated and trained nursery personnel in marcotting.
 
7104 INTO, LEE WARREN PLANNING Submit draft of Blucon-Albatana CIS to Construction Unit Head for Checking October 23, 2024 100 October 23, 2024 Completed.
 
7105 INTO, LEE WARREN PLANNING Consolidate drafted Padada RIS Lateral AA cross-sections and structures from draftsman and finalize DED. October 21, 2024 100 October 21, 2024 Checked and polished and furnished a PDF file of consolidated DED. Submitted to RIO for checking.
 
7111 INTO, LEE WARREN PLANNING Prepare PERT-CPM for Blucon Albatana CIS Program of Works under Repair CIS (2.5M) October 24, 2024 100 October 24, 2024 Completed.
 
7112 INTO, LEE WARREN PLANNING Prepare Layout Map for Blucon Albatana CIS CY 2025 Program of Works October 24, 2024 100 October 24, 2024 Completed.
 
7113 EUGENIO, VENANN PLANNING Conduct site visit with CO personnel at the proposed drip irrigation project October 14, 2024 100 October 14, 2024 Other accomplishments: Check geotagged photos submitted by LUC applicants thru email; Update AIP 2026 as of as per RIO Comment during the Budget Forum; Check TOTs and LUCs for printing
 
7114 EUGENIO, VENANN PLANNING Attend virtual meeting with RIO regarding the Padada RIS Modernization FSR October 15, 2024 100 October 15, 2024 Other accomplishments: Prepare Layout Maps for POW attachment; Assist TOT applicants; Check TOTs and LUCs for printing.
 
7115 EUGENIO, VENANN PLANNING Prepare Layout Maps for POW attachment October 16, 2024 100 October 16, 2024 Other accomplishments: Assist TOT applicants; Check TOTs and LUCs for printing.
 
7116 EUGENIO, VENANN PLANNING Attended Review, Update and Refinement of the Process Flow of the Planning and Design Section of NIA XI's Regional Office and IMOs October 17, 2024 100 October 17, 2024
 
7117 EUGENIO, VENANN PLANNING Attended Review, Update and Refinement of the Process Flow of the Planning and Design Section of NIA XI's Regional Office and IMOs October 18, 2024 100 October 18, 2024
 
7118 EUGENIO, VENANN PLANNING Attend virtual meeting on the updating of RIMP Annex 5 - 10 year plan October 23, 2024 100 October 23, 2024 Other accomplishments within the week: Contact LUC applicants; Prepare Layout Maps for POW attachment; Check TOTs and LUCs for printing.
 
7119 EUGENIO, VENANN PLANNING Update RIMP Annex 5 - 10 year plan as of October 24, 2024 as per RIO comments October 24, 2024 100 October 24, 2024 Other accomplishments within the week: Prepare Layout Maps for FVR attachment; Check LUCs for printing; Assist TOT applicants; Participate in the physical fitness activities.
 
7124 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of Catch-Up Plan for Year 2 and 3 remaining activities for PRIS and MRIS. October 23, 2024 100 October 23, 2024 Prepared draft of Catch-Up Plan.
 
7125 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate field and nursery activities. October 23, 2024 100 October 23, 2024 - Facilitated clearing at Mahayahay plantation sites. - Facilitated grafting of lansones seedlings. - Facilitated main canal clearing.
 
7126 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of proposal for collaboration meeting of additional farmers for Year 2 implementation. October 23, 2024 100 October 23, 2024 Completed
 
7127 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. October 24, 2024 100 October 24, 2024 Completed and facilitated site clearing at Clib plantation and canal clearing.
 
7131 LUARDO, GLENN D. PLANNING Review comments of CO regarding the Padada RIS Modernization Feasibility Study Report in preparation for the technical discusion with RIO. October 15, 2024 100 October 15, 2024
 
7132 LUARDO, GLENN D. PLANNING Attend the technical discussion with RIO regarding the comments on Padada RIS Modernization Feasibility Study Report. October 15, 2024 100 October 15, 2024
 
7133 LUARDO, GLENN D. PLANNING Plotting of the conducted inventory of PAPs on Main Canal for the Proposed Cogon Bacaca SRIP. October 16, 2024 100 October 16, 2024 Other accomplishments: Prepared DTR for Oct. 1-15, 2024 (100%), Consolidate Drone data on Cogon Bacaca SRIP Main Canal (100%).
 
7134 LUARDO, GLENN D. PLANNING Conduct detailed inventory of affected properties for LARP formulation of Cogon Bacaca SRIP October 17, 2024 100 N/A Conducted inventory of 21 PAPs along Lat. B Canal Lining.
 
7135 LUARDO, GLENN D. PLANNING Conduct detailed inventory of affected properties for LARP formulation of Cogon Bacaca SRIP October 18, 2024 100 October 18, 2024 Conducted inventory of 15 PAPs along B1 Canal Lining.
 
7138 CAYABYAB, REY JIM PLANNING Conduct detailed inventory of affected properties of Cogon Bacaca SRIP at main canal for LARP formulation October 14, 2024 100 October 14, 2024
 
7139 CAYABYAB, REY JIM PLANNING Attend technical discussion with RIO on the Padada RIS Modernization FSR October 15, 2024 100 October 15, 2024
 
7140 CAYABYAB, REY JIM PLANNING Attend virtual technical discussion with CO and RIO personnel for the Padada RIS Modernization FSR October 16, 2024 100 October 16, 2024
 
7142 CAYABYAB, REY JIM PLANNING Conduct detailed inventory of affected properties of Cogon Bacaca SRIP at Lateral B1 for LARP formulation October 18, 2024 100 October 18, 2024 October 17, 2024: Accomplished 45%.
 
7144 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare collaboration meeting proposal for additional areas of Year 2. October 25, 2024 100 October 25, 2024 Prepared and submitted proposal.
 
7145 ENCABO, PRINCESS SHAIRA MAE PLANNING Follow-up remaining PR's in line with fertilizers and seedlings request. October 25, 2024 100 October 25, 2024 Follow-up PR for fertilizer waiting for its delivery. Re-submitted requisition for seedlings.
 
7156 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare reports for the successfully conducted activities re: Informative flyer distribution to farmers & Turn-over letter for Year 1 farmers. October 25, 2024 100 October 25, 2024 Prepared and submitted draft.
 
7187 SASUMAN, MARY LOUISE J. PLANNING Conduct detailed inventory of affected properties at Lateral D for LARP formulation of Cogon Bacaca SRIP October 21, 2024 100 October 21, 2024 Completed.
 
7188 SASUMAN, MARY LOUISE J. PLANNING Prepare the revision of PDU ROR. October 22, 2024 100 October 22, 2024 On-going revision of PDU ROR.
 
7189 SASUMAN, MARY LOUISE J. PLANNING Attend coordination meeting with RIO personnel relative to the upcoming validation of CO personnel in Padada RIS Modernization October 23, 2024 100 October 23, 2024 Completed.
 
7190 SASUMAN, MARY LOUISE J. PLANNING Prepare budget proposal for the conduct of field validation in Cogon Bacaca SRIP with CO and RO personnel, October 23, 2024 100 N/A Submitted the budget proposal. Other accomplishment: Assisted client in applying CSAG certification. Entertained the Project Affected Person (PAP) of Cogon Bacaca SRIP relative to his inquiry in his affected person and conduct Socio-economic survey.
 
7191 LUARDO, GLENN D. PLANNING Plotting data information of the conducted inventory of PAPs on Lateral B and B1 for the Proposed Cogon Bacaca SRIP. October 21, 2024 100 October 21, 2024
 
7192 LUARDO, GLENN D. PLANNING Conduct Inventory of PAPs for LARP of the Proposed Cogon Bacaca SRIP at Brgy. Cogon Bacaca, Kiblawan, Davao del Sur. October 22, 2024 100 October 22, 2024 Conducted inventory of 15 PAPs along Lat. D Canal Lining
 
7193 SASUMAN, MARY LOUISE J. PLANNING Attend the virtual meeting on the second session of LARP presentation of Cogon Bacaca SRIP. October 24, 2024 100 October 24, 2024 Attended the virtual meeting. Other accomplishment: on-going revision of PDU ROR.
 
7194 SASUMAN, MARY LOUISE J. PLANNING Consolidate the PDU Desk Manual. October 25, 2024 90 N/A On-going consolidation of PDU Desk Manual.
 
7195 SASUMAN, MARY LOUISE J. PLANNING Finalize and submit PDU ROR. October 25, 2024 100 October 25, 2024 Completed.
 
7196 SASUMAN, MARY LOUISE J. PLANNING Organize and encode the gathered and filled-out detailed inventory sheets of PAPs of Cogon Bacaca SRIP. October 25, 2024 100 October 25, 2024 Completed.
 
7218 INTO, LEE WARREN PLANNING Prepare Monthly Convergence Report as of October 31, 2024 October 28, 2024 100 October 28, 2024 Prepared and submitted advance e-copy.
 
7219 INTO, LEE WARREN PLANNING Drafting of Padada RIS Lateral B3 Structures October 28, 2024 100 October 28, 2024 Completed.
 
7220 INTO, LEE WARREN PLANNING Attend The MLION Corp Product Presentation via Google Meet. October 28, 2024 100 October 28, 2024 Attended
 
7221 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag raising ceremony. October 28, 2024 100 October 28, 2024 Attended.
 
7222 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. October 28, 2024 100 October 28, 2024 - Inspected plantation sites and facilitated clearing therein (Clib & Malabang). - Facilitated hauling of materials from Digos IMO to PRIS. - Facilitated canal clearing at PRIS main canal.
 
7223 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare report for RIO for the implemented flyer distribution for farmers of PRIS and MRIS. October 29, 2024 100 October 29, 2024 Prepared and submitted 3 hard copies.
 
7224 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare report for RIO for the Turn-Over Report of Year 1 plantation sites in PRIS and MRIS. October 29, 2024 100 October 29, 2024 Completed and printed 3 hard copies.
 
7225 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and facilitate field activities at PRIS. October 29, 2024 100 October 29, 2024 Completed monitoring of plantation and nursery in PRIS.
 
7234 INTO, LEE WARREN PLANNING Printing of Padada RIS Office Renovation GFCs for Renovation Permit Application October 29, 2024 100 October 29, 2024 Completed.
 
7235 INTO, LEE WARREN PLANNING Drafting of Canal Structure (Junction of Lateral A and A1) for Padada RIS Modernization October 29, 2024 100 October 29, 2024 Completed.
 
7236 ENCABO, PRINCESS SHAIRA MAE PLANNING Collect DTR and prepare payrolls of PRIS and MRIS field personnel. October 30, 2024 100 October 30, 2024 Completed and submitted.
 
7237 CAYABYAB, REY JIM PLANNING Conduct detailed inventory of affected properties of Cogon Bacaca SRIP at Lateral C for LARP formulation October 22, 2024 100 October 22, 2024 October 21, 2024 - Accomplished 50%.
 
7239 CAYABYAB, REY JIM PLANNING Conduct detailed inventory of affected properties of Cogon Bacaca SRIP at Lateral D and D1-A for LARP formulation October 23, 2024 100 October 23, 2024
 
7241 CAYABYAB, REY JIM PLANNING Conduct detailed inventory of affected properties of Cogon Bacaca SRIP at Lateral D for LARP formulation October 24, 2024 100 October 24, 2024
 
7250 LUARDO, GLENN D. PLANNING Conduct Inventory of PAPs for LARP of the Proposed Cogon Bacaca SRIP at Brgy. Cogon Bacaca, Kiblawan, Davao del Sur. October 24, 2024 100 October 24, 2024 Conducted inventory of 18 PAPs along Lat. D1 Canal Lining
 
7252 LUARDO, GLENN D. PLANNING Plotting data information of the conducted inventory of PAPs on Lateral D and D1-A for the Proposed Cogon Bacaca SRIP. October 25, 2024 100 October 25, 2024 Other accomplishment: Prepared 2 PR for Planning and Design Activities (100%).
 
7254 CAYABYAB, REY JIM PLANNING Prepare monitoring sheet for detailed inventory of Cogon Bacaca SRIP LARP October 25, 2024 100 October 25, 2024
 
7273 INTO, LEE WARREN PLANNING Worked on Padada RIS Lateral B3 DED for Modernization. October 30, 2024 100 October 30, 2024 Consolidated drafted works from draftsman. Continued drafting canal cross sections from station 6+260 to end of canal. Submitted PDF file for checking by RIO.
 
7274 ESPADERA, MA LOURDES PLANNING Update Survey Team Accompllishment (Previous 2 Weeks) October 28, 2024 100 October 28, 2024
 
7275 ESPADERA, MA LOURDES PLANNING Prepare Layout for Miral SRIS Parcellary (Encoding of Details per Parcel) - 850 Parcels October 28, 2024 100 October 28, 2024 10% Accomplishment
 
7276 ESPADERA, MA LOURDES PLANNING Prepare Layout for Miral SRIS Parcellary (Encoding of Details per Parcel) - 850 Parcels October 29, 2024 100 October 29, 2024 25% Accomplishment
 
7277 ESPADERA, MA LOURDES PLANNING Update Milestone of Pagan and Suawan SRIP for MIPC Coordination Meeting October 29, 2024 100 October 29, 2024
 
7278 ESPADERA, MA LOURDES PLANNING Update Survey Team Accompllishment (Previous 2 Days) for DTR and WAR Checking October 30, 2024 100 October 30, 2024
 
7279 ESPADERA, MA LOURDES PLANNING Prepare Layout for Miral SRIS Parcellary (Encoding of Details per Parcel) - 850 Parcels October 30, 2024 100 October 30, 2024 30% Accomplishment
 
7280 ESPADERA, MA LOURDES PLANNING Miscellaneous: Returned Laptop issued to MGE Facilitate finding of previous hand held radios that can still be used October 29, 2024 100 October 29, 2024
 
7281 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate field and nursery activities at PRIS. October 30, 2024 100 October 30, 2024 - Designated field personnel in canal clearing, nursery clearing & PRIS office hauling of waste materials. - Instructed fertilizer application of plants and disinfection of PRIS nursery.
 
7282 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate PR Approval for Collaboration meeting. October 30, 2024 100 October 30, 2024 Completed and submitted.
 
7283 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection. October 31, 2024 100 October 31, 2024 Facilitated site monitoring and other field activities at PRIS.
 
7284 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare proposal for water quality assessment for PRIS and MRIS. October 31, 2024 100 October 31, 2024 Prepared draft proposal.
 
7287 INTO, LEE WARREN PLANNING Costing of FSDE Funds (October 21-25, 2024) October 25, 2024 100 October 25, 2024 Completed.
 
7299 EUGENIO, VENANN PLANNING Prepare shapefile of Padada RIS expansion service area per source October 30, 2024 100 October 29, 2024 Other accomplishments within the week: Prepare communication letter; Process LUC applications; Assist TOT applicants; Prepare list of proposed projects for 2026-2028 to be submitted to RIO.
 
7300 EUGENIO, VENANN PLANNING Prepare Layout Maps for POW attachment. Prepare Layout Maps for FVR attachment. October 28, 2024 100 October 28, 2024 Other accomplishments: Check TOTs and LUCs for printing; Contact LUC applicants.
 
7301 EUGENIO, VENANN PLANNING Print and submit list of proposed projects for 2026-2028 to be submitted to RIO October 30, 2024 100 October 30, 2024 Other Accomplishments: Prepare and submit DTR; Submit request for extension; Process LUC applications; Assist TOT applicants; Prepare Layout Maps for POW attachment.
 
7302 SASUMAN, MARY LOUISE J. PLANNING Attend the ISO Risk Management Team (RMT) meeting at NIA Federation Bldg., Digos, Davao del Sur. October 28, 2024 100 October 28, 2024 Completed.
 
7304 SASUMAN, MARY LOUISE J. PLANNING Attend Mindanao Island Project Coordinator meeting at NIA Federation Bldg., Digos, Davao del Sur. October 29, 2024 100 October 29, 2024 Completed.
 
7305 CAYABYAB, REY JIM PLANNING Conduct detailed inventory of affected properties of Cogon Bacaca SRIP at Lateral D for LARP formulation October 28, 2024 100 October 28, 2024
 
7306 CAYABYAB, REY JIM PLANNING Prepare summary of detailed inventory output for Cogon Bacaca SRIP LARP October 29, 2024 100 October 29, 2024
 
7307 SASUMAN, MARY LOUISE J. PLANNING Finalize and submit to PDU Head for checking the final PDU ROR. October 29, 2024 100 October 29, 2024 Completed.
 
7308 CAYABYAB, REY JIM PLANNING Attend MIPC meeting at NIA IA Federation bldg. October 29, 2024 100 October 29, 2024
 
7309 CAYABYAB, REY JIM PLANNING Prepare ABC for New Cabasagan Program of Works October 30, 2024 100 October 30, 2024
 
7310 SASUMAN, MARY LOUISE J. PLANNING Prepare Certification for Commercial Sand and Gravel (CSAG) October 30, 2024 100 October 30, 2024 Completed.
 
7311 CAYABYAB, REY JIM PLANNING Comply to NIACO comments on the submitted Revised Padada RIS FSR October 31, 2024 100 October 31, 2024
 
7312 SASUMAN, MARY LOUISE J. PLANNING Prepare NWRB Certificate on the Notice for Posting. October 30, 2024 100 October 30, 2024 Completed.
 
7314 SASUMAN, MARY LOUISE J. PLANNING Consolidate the data gathered on the detailed inventory for LARP activities at Cogon Bacaca SRIP. October 31, 2024 60 October 31, 2024 On-going consolidation.
 
7331 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Mal RIS (Tibongbong Access Road) October 21, 2024 100 October 21, 2024 completed
 
7332 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Bagumbuhay SPIP October 21, 2024 60 October 21, 2024
 
7333 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 21, 2024 100 October 21, 2024 completed
 
7334 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Bagumbuhay SPIP October 22, 2024 100 October 22, 2024 completed
 
7335 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Miral SRIS Parcellary (September 13 and 16, 2024 survey data) October 22, 2024 100 October 22, 2024 completed
 
7336 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 22, 2024 100 October 22, 2024 completed
 
7337 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Kibangay Creek October 23, 2024 100 October 23, 2024 completed
 
7338 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 4 LUC applications October 23, 2024 100 October 23, 2024 completed
 
7339 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Mal RIS (Delis Dam and Main Canal) October 23, 2024 15 October 23, 2024
 
7340 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 23, 2024 100 October 23, 2024 completed
 
7341 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Mal RIS (Delis Dam and Main Canal) October 24, 2024 40 October 24, 2024
 
7342 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 1 LUC application October 24, 2024 100 October 24, 2024 completed
 
7343 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 24, 2024 100 October 24, 2024 completed
 
7344 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Mal RIS (Delis Dam and Main Canal) October 28, 2024 75 October 28, 2024
 
7345 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Delis Supplementary canal for as-stake (propose alignment and submerge area) October 28, 2024 100 October 28, 2024 completed
 
7346 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 28, 2024 100 October 28, 2024 completed
 
7347 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Mal RIS (Delis Dam and Main Canal) October 29, 2024 100 October 29, 2024 completed
 
7348 MARTURILLAS, JOHN LLOYD PLANNING Checking of survey data of Padada RIS (Sacub Dam) October 29, 2024 100 October 29, 2024 completed
 
7349 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 29, 2024 100 October 29, 2024 completed
 
7350 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Padada RIS (Sacub Dam) October 30, 2024 100 October 30, 2024 completed
 
7351 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 30, 2024 100 October 30, 2024 completed
 
7352 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel documents for surveying activities October 31, 2024 100 October 31, 2024 completed
 
7353 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Kibangay PIP October 31, 2024 15 October 31, 2024
 
7354 ESPADERA, MA LOURDES PLANNING Prepare WAR and DTR October 30, 2024 100 October 30, 2024
 
7355 ESPADERA, MA LOURDES PLANNING Prepare Communication Letter: (1) Request for Authorization to Travel (2) Letter to Municipality of Matanao re: Asbang SRIP October 30, 2024 100 October 30, 2024
 
7356 ESPADERA, MA LOURDES PLANNING Prepare Layout for Miral SRIS Parcellary (Encoding of Details per Parcel) - 850 Parcels October 31, 2024 100 N/A 35% Accomplishment
 
7357 ESPADERA, MA LOURDES PLANNING * Check and conform DTR and WARs of COS * Assist in the preparation of WAR of JOs October 31, 2024 100 October 31, 2024
 
7358 ESPADERA, MA LOURDES PLANNING Miscellaneous: * Finalize Communication for Request of Authority to Travel * Prepare data references for Badagoy CIS survey October 31, 2024 100 October 31, 2024
 
7369 INTO, LEE WARREN PLANNING Work on the Padada RIS Modernization FSR NIACO comments on Irrigation and Drainage Re: The inclusion in the write-ups of all work items under System expansion. November 4, 2024 100 October 4, 2024 Completed.
 
7373 INTO, LEE WARREN PLANNING Site visit with NIACO personnel on the proposed canalization of irrigation and drainage works in the Padada RIS Modernization for the finalization of the on-going FSR October 5, 2024 100 November 5, 2024 Visited the proposed repair/rehab of existing canals and the proposed concreting of existing earth canals. Assisted NIACO personnel in interviewing IA presidents regarding their insights on the modernization of their respective areas.
 
7375 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. November 4, 2024 100 November 4, 2024 - Attended flag raising ceremony. - Site monitored & inspected plantation at Brgy. Malabang.
 
7376 ENCABO, PRINCESS SHAIRA MAE PLANNING Coordination with identified landowners at Brgy. La Union for the implementation of Year 2 remaining hectares. November 5, 2024 100 November 5, 2024 Completed. Other activities: - Facilitated field personnel in hauling/clearing at Digos IMO. - Facilitated canal clearing at PRIS. - Assisted in planting of calamansi cuttings at PRIS nursery.
 
7377 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring of plantation sites and nursery at PRIS. November 6, 2024 100 November 6, 2024 Completed. Other activities: - Facilitated field personnel in hauling/clearing at Digos IMO. - Facilitated canal clearing at PRIS. - Assisted in replanting of mangosteen seedlings.
 
7378 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites and nursery & facilitate field activities therein. November 7, 2024 100 November 7, 2024 - Inspected plants at Brgy. Clib & Mahayahay for pest incidence. - Geotagged watermelon/mongo plantation within PRIS. - Facilitated field personnel in hauling/clearing at Digos IMO. - Facilitated canal clearing at PRIS. - Assisted in maintenance of pr
 
7379 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites and nursery & facilitate field activities therein. November 8, 2024 100 November 8, 2024 Facilitated site inspection/round weeding/inventory at Malabang plantation sites.
 
7386 INTO, LEE WARREN PLANNING Site visit with NIACO personnel on the proposed works on the expansion area of Padada River Irrigation System Modernization for the finalization of the on-going FSR. November 6, 2024 100 November 6, 2024 Entertained queries and noted the recommendations from the NIACO personnel. Some of the determined changes are the conversion of the initially proposed check structures into solar powered structures.
 
7387 ESPADERA, MA LOURDES PLANNING Prepare Layout for Miral SRIS Parcellary (Encoding of Details per Parcel) - 850 Parcels November 4, 2024 100 N/A 40% Accomplishment
 
7388 ESPADERA, MA LOURDES PLANNING Assist in the preparation for field validation at Padada RIS under Modernization Program November 4, 2024 100 November 4, 2024
 
7389 ESPADERA, MA LOURDES PLANNING Assist in the field validation at Padada RIS under Modernization Program November 5, 2024 100 November 5, 2024
 
7390 ESPADERA, MA LOURDES PLANNING Assist in the field validation at Padada RIS under Modernization Program November 6, 2024 100 November 6, 2024
 
7391 ESPADERA, MA LOURDES PLANNING Organized 2 weeks of geotags submitted November 7, 2024 100 November 7, 2024
 
7392 ESPADERA, MA LOURDES PLANNING Finalize Communication for Request of Authority to Travel November 7, 2024 100 November 7, 2024
 
7393 ESPADERA, MA LOURDES PLANNING Prepare IFSAR data for Asinan SPIP November 7, 2024 100 November 7, 2024
 
7394 ESPADERA, MA LOURDES PLANNING Consolidate/ Arrange BTOR for ISO Workplan PDU Filer November 7, 2024 100 November 7, 2024
 
7395 ESPADERA, MA LOURDES PLANNING Prepare Inventory of Available Survey Data of Badagoy and Dakinus CIS (2022 onwards) November 7, 2024 100 November 7, 2024
 
7396 ESPADERA, MA LOURDES PLANNING Prepare Survey Data References for Emfisa CIS and Mal RIS November 7, 2024 100 November 7, 2024
 
7397 ESPADERA, MA LOURDES PLANNING Attend coordination meeting of PDU in preparation for ISO Audit November 8, 2024 100 November 8, 2024
 
7411 ESPADERA, MA LOURDES PLANNING Prepare Layout for Miral SRIS Parcellary (Encoding of Details per Parcel) - 850 Parcels November 8, 2024 100 November 8, 2024 55% Accomplishment
 
7412 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony. November 4, 2024 100 November 4, 2024 Completed.
 
7414 SASUMAN, MARY LOUISE J. PLANNING Attend meeting with NIA CO, RIO, and DDS PDU personnel relative to the activities for field validation under the Padada RIS Modernization Program November 4, 2024 100 November 4, 2024 Completed.
 
7415 SASUMAN, MARY LOUISE J. PLANNING Assist and participate in the conduct of field validation for Padada RIS Modernization Program with NIA CO, RIO, and DDS IMO PDU personnel. November 6, 2024 100 November 6, 2024 Assisted and participated in the activity last Nov. 5-6, 2024.
 
7416 SASUMAN, MARY LOUISE J. PLANNING Attend the exit meeting at NIA RIO relative to the completed field validation activities for the Padada RIS Modernization Program. November 7, 2024 100 November 7, 2024 Completed.
 
7417 SASUMAN, MARY LOUISE J. PLANNING Attend meeting with DDS-IMO PDU personnel relative to the ISO audit preparation activities. November 8, 2024 100 November 8, 2024 Completed.
 
7419 SASUMAN, MARY LOUISE J. PLANNING Organize the gathered data on the detailed inventory of PAPs in Cogon Bacaca SRIP, Lateral A. November 8, 2024 100 November 8, 2024 Completed.
 
7443 ESPADERA, MA LOURDES PLANNING Attend Virtual Meeting with CEST re: Topographic Survey Data November 11, 2024 100 November 11, 2024
 
7444 ESPADERA, MA LOURDES PLANNING Assist in the preparation for ISO Audit November 11, 2024 100 November 11, 2024
 
7445 ESPADERA, MA LOURDES PLANNING Prepare Survey team Travel Request November 11, 2024 100 November 11, 2024
 
7446 ESPADERA, MA LOURDES PLANNING Update Survey Team Accomplishment (2 days) November 11, 2024 100 November 11, 2024
 
7447 INTO, LEE WARREN PLANNING Prepare and arrange pertinent documents for the upcoming Third-Party Audit on November 14, 2024 November 9, 2024 100 November 9, 2024 Printed table of contents for GFC Filers. Arranged filers in alphabetical order and printed obtainable GFC plans for filing.
 
7448 INTO, LEE WARREN PLANNING Attend Exit Conference with RIO and NIACO personnel at regional office for the conducted field validation of Padada RIS under Modernization program November 7, 2024 100 November 7, 2024 Participated.
 
7449 INTO, LEE WARREN PLANNING Costing of FSDE Funds (November 4 - 8, 2024) November 8, 2024 100 November 8, 2024 Completed.
 
7450 INTO, LEE WARREN PLANNING Worked on few right-ups for Padada RIS Modernization FSR. November 8, 2024 100 November 9, 2024 Tabulated lists of works under system expansion and made few write-ups.
 
7451 INTO, LEE WARREN PLANNING Continued arranging blue filers for GFC Plans and attaching table of contents. November 11, 2024 100 November 11, 2024 Completed.
 
7452 INTO, LEE WARREN PLANNING Forwarded Survey files of Padada RIS Drainages under Modernization to draftsmen and instructed few points on what to attain. November 11, 2024 100 November 11, 2024 Drainage A - MDP, Drainage Q - ETD, Drainage C - MDP, Drainage I - JAA
 
7462 EUGENIO, VENANN PLANNING Prepare and submit monitoring sheet of the geodatasets reconciliation November 4, 2024 100 November 4, 2024 Other accomplishments: Process TOT applications; Contact LUC applicants; Submit the data requested by RIO.
 
7463 EUGENIO, VENANN PLANNING Assist in the Conduct of Field Validation at Padada RIS under Modernization Program November 5, 2024 100 November 5, 2024
 
7464 EUGENIO, VENANN PLANNING Assist in the Conduct of Field Validation at Padada RIS under Modernization Program November 6, 2024 100 November 6, 2024
 
7465 EUGENIO, VENANN PLANNING Attend in the Exit Conference of the Field Validation ofPadada RIS under the Modernization Program at Regional Office, Davao City. November 7, 2024 100 November 7, 2024
 
7466 EUGENIO, VENANN PLANNING Attend the meeting of PDU staff for ISO preparations. November 8, 2024 100 November 8, 2024 Other accomplishments: Process TOT and LUC applications; Prepare layout maps for FVR attachment; Contact LUC applicants ; Edit Document Information Team ROR.
 
7484 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony October 28, 2024 100 October 28, 2024
 
7485 LUARDO, GLENN D. PLANNING Attend virtual meeting with Central Office personnel regarding the farmer activities of the proposed Padada RIS Modernization program October 28, 2024 100 October 28, 2024 Other accomplishment: Encoded 5 farmer beneficiaries data information on farmer activities of Padada RIS using Central Office template (100%).
 
7486 LUARDO, GLENN D. PLANNING Encode data information on farmer activities of Padada RIS using Central Office template October 29, 2024 100 October 29, 2024 Completed 16 farmer beneficiaries data information; Other accomplishment: Prepared 2 PR for Planning and Design Activities (100%).
 
7487 LUARDO, GLENN D. PLANNING Attend 4th Provincial Statistics Committee (PSC) Quarterly Meeting of Davao del Sur @ Megan Function Hall, Digos City October 30, 2024 100 October 30, 2024 Other accomplishment: Encoded 10 farmer beneficiaries data information on farmer activities of Padada RIS using Central Office template (100%).
 
7488 LUARDO, GLENN D. PLANNING Encode data information on farmer activities of Padada RIS using Central Office template . October 31, 2024 100 October 31, 2024 Completed 10 farmer beneficiaries data information (100%).
 
7489 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony November 4, 2024 100 November 4, 2024
 
7490 LUARDO, GLENN D. PLANNING Encode data information on farmer activities of Padada RIS using Central Office template. November 4, 2024 100 November 4, 2024 Completed 15 farmer beneficiaries data information (100%).
 
7491 LUARDO, GLENN D. PLANNING Participate in the Field Validation of Padada RIS Modernization Plan. November 5, 2024 100 November 5, 2024 Interviewed 5 farmer beneficiaries in Padada RIS.
 
7492 LUARDO, GLENN D. PLANNING Participate in the Field Validation of Padada RIS Modernization Plan. November 6, 2024 100 November 6, 2024 Interviewed 3 farmer beneficiaries in Padada RIS; Other activities: Encoded 3 Farmer beneficiaries data information to CO excel file template (100%).
 
7493 LUARDO, GLENN D. PLANNING Attend and participate in the Exit Conference regarding the conducted Field Validation in the Padada RIS Irrigators Association. November 7, 2024 100 November 7, 2024
 
7495 LUARDO, GLENN D. PLANNING Consolidate documents of NIA projects in preparation for the ISO Audit. November 8, 2024 30 November 8, 2024
 
7498 CAYABYAB, REY JIM PLANNING Attend meeting with NIA CO, RIO, and DDS PDU personnel relative to the activities for field validation under the Padada RIS Modernization Program November 4, 2024 100 November 4, 2024
 
7499 CAYABYAB, REY JIM PLANNING Assist and participate in the conduct of field validation for Padada RIS Modernization Program with NIA CO, RIO, and DDS IMO PDU personnel November 6, 2024 100 November 6, 2024 Field Validation conducted from Nov. 5-6, 2024.
 
7500 CAYABYAB, REY JIM PLANNING Attend the exit meeting at NIA RIO relative to the completed field validation activities for the Padada RIS Modernization Program November 7, 2024 100 November 7, 2024
 
7501 CAYABYAB, REY JIM PLANNING Attend meeting with DDS-IMO PDU personnel relative to the ISO audit preparation activities November 8, 2024 100 November 8, 2024
 
7502 CAYABYAB, REY JIM PLANNING Organize the gathered data on the conducted detailed inventory of PAPs in Cogon Bacaca SRIP - Reservoir area and Main canal November 8, 2024 100 November 8, 2024
 
7523 ESPADERA, MA LOURDES PLANNING Assist in the preparation for ISO Audit November 12, 2024 100 November 12, 2024
 
7524 ESPADERA, MA LOURDES PLANNING Assist in the preparation for ISO Audit November 13, 2024 100 November 13, 2024
 
7525 ESPADERA, MA LOURDES PLANNING Prepare Layout for Miral SRIS Parcellary (Encoding of Details per Parcel) - 850 Parcels November 14, 2024 100 November 14, 2024
 
7566 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag raising ceremony. November 11, 2024 100 November 11, 2024 Attended
 
7567 ENCABO, PRINCESS SHAIRA MAE PLANNING Conducted collaboration meeting with La Union farmers for Year 2 beneficiaries. November 11, 2024 100 November 11, 2024 Conducted and discussed relevant details for the farmers therein.
 
7569 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection and maintenance of plantation sites. November 11, 2024 100 November 11, 2024 Facilitated canal clearing and round weeding at Malabang.
 
7572 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate PRIS field/nursery activities. November 12, 2024 100 November 12, 2024 Monitored nursery activities (sowing of collected cacao seeds); Nursery personnel helped in canal repair in coordination with Engr. Caniban.
 
7573 ENCABO, PRINCESS SHAIRA MAE PLANNING Compile relevant documentations for RPWRSIS of Padada and Mal RIS. November 12, 2024 100 November 12, 2024 Compiled and arranged the documentations.
 
7574 ENCABO, PRINCESS SHAIRA MAE PLANNING Assist in compilation of relevant documents for ISO Audit. November 13, 2024 100 November 13, 2024 - Assisted in compilation and arranged pertinent documents. - Facilitated site clearing at La Union & repair of canal at PRIS.
 
7576 ENCABO, PRINCESS SHAIRA MAE PLANNING Assist in compilation of relevant documents for ISO Audit. November 14, 2024 100 November 14, 2024 Assisted the PDU personnel for the needed documents for ISO audit.
 
7578 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of powerpoint presentation for RPWRSIS monitoring of accomplishments for CO submission. November 14, 2024 100 November 14, 2024 Prepared and submitted in Google Drive provided by the CO EWMS personnel. Forwarded copy to Engr. LT Victoriano.
 
7579 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate round weeding/site clearing at La Union. November 14, 2024 100 November 14, 2024 Conducted initial site clearing and facilitated canal clearing for PRIS.
 
7580 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate round weeding/site clearing at La Union. November 15, 2024 100 November 15, 2024 Monitor the ongoing progress of site clearing and conducted mapping of the area to be planted.
 
7581 ESPADERA, MA LOURDES PLANNING Train Mr. Dela Cruz of Basic Civil 3D November 15, 2024 100 November 15, 2024
 
7582 ESPADERA, MA LOURDES PLANNING Prepare data references for upcoming Moab Parcellary Survey November 15, 2024 100 November 15, 2024
 
7583 ESPADERA, MA LOURDES PLANNING Polish and submit Miral SRIS Parcellary Map Layout November 15, 2024 100 November 15, 2024 90
 
7584 ESPADERA, MA LOURDES PLANNING Participate in the year end games elimination November 15, 2024 100 November 15, 2024
 
7585 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Kibangay PIP November 4, 2024 100 November 4, 2024
 
7586 MARTURILLAS, JOHN LLOYD PLANNING Prepare Travel documents for surveying activities November 4, 2024 100 November 4, 2024
 
7587 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Pagan SRIP Topographic map and Modified Map Test November 5, 2024 30 November 5, 2024 on-going
 
7588 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Pagan SRIP Topographic map and Modified Map Test November 6, 2024 60 November 6, 2024 on-going
 
7589 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Pagan SRIP Topographic map and Modified Map Test November 7, 2024 100 November 7, 2024 completed
 
7590 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Asinan EGPIP Topographic Map November 7, 2024 100 November 7, 2024
 
7591 MARTURILLAS, JOHN LLOYD PLANNING Checking of survey data of MAL RIS LMC Lateral A, Supplementary Canal, LMC Lateral B November 8, 2024 100 November 8, 2024
 
7592 MARTURILLAS, JOHN LLOYD PLANNING Attended Suawan SRIP meeting with CEST Consultant and RIO XI November 11, 2024 100 November 11, 2024
 
7593 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 3 LUC Applications November 11, 2024 100 November 11, 2024
 
7594 MARTURILLAS, JOHN LLOYD PLANNING Preparing and Checking of Suawan SRIP Topographic Map November 11, 2024 100 November 11, 2024
 
7595 MARTURILLAS, JOHN LLOYD PLANNING Drafting of Justification for Cash advance payment of NAMRIA registration November 12, 2024 100 November 12, 2024
 
7596 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 17 Land Use Applications November 12, 2024 100 November 12, 2024
 
7597 MARTURILLAS, JOHN LLOYD PLANNING Printing of TCAGP-GNSS learning materials November 13, 2024 100 November 13, 2024
 
7598 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map November 13, 2024 3 November 13, 2024 on-going
 
7599 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 2 Land Use Applications November 13, 2024 100 November 13, 2024
 
7601 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map November 14, 2024 6 November 14, 2024 on-going
 
7603 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map November 15, 2024 9 November 15, 2024 on-going
 
7605 MARTURILLAS, JOHN LLOYD PLANNING Prepare travel and other documents for calibration of GNSS Receivers November 15, 2024 100 November 15, 2024
 
7607 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony. November 11, 2024 100 November 11, 2024 Completed.
 
7608 SASUMAN, MARY LOUISE J. PLANNING Prepare Objectives, Targets & Programs (OTP) for ISO Audit. November 11, 2024 100 November 11, 2024 Submitted for checking.
 
7609 SASUMAN, MARY LOUISE J. PLANNING Print PDU Desk Manual and ROR for the preparation of ISO Audit November 11, 2024 100 November 11, 2024 Completed.
 
7610 SASUMAN, MARY LOUISE J. PLANNING Assist in the internal audit conducted by NIA-RIO. November 12, 2024 100 November 12, 2024 Assisted during the audit conducted by NIA RIO and revised OTP as per RIO Auditors comment
 
7611 SASUMAN, MARY LOUISE J. PLANNING Assist in the compilation of relevant documents for ISO Audit. November 13, 2024 100 November 13, 2024 Completed.
 
7615 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony November 11, 2024 100 November 11, 2024
 
7616 LUARDO, GLENN D. PLANNING Assist in the compilation of relevant documents for ISO Audit. November 11, 2024 60 November 11, 2024
 
7617 INTO, LEE WARREN PLANNING Costing of FSDE Funds (November 11-15, 2024) November 15, 2024 100 November 15, 2024 Completed.
 
7618 SASUMAN, MARY LOUISE J. PLANNING Participate in the external ISO Audit. November 14, 2024 100 November 14, 2024 Participated and assisted during the external ISO Audit.
 
7619 LUARDO, GLENN D. PLANNING Attend Training workshop for Padada RIS Watershed Management Plan @ DENR-PENRO, Digos City. November 12, 2024 100 November 12, 2024
 
7620 LUARDO, GLENN D. PLANNING Assist in the compilation of relevant documents for ISO Audit. November 13, 2024 100 November 13, 2024 Other Accomplishment: Encoded 2 Farmer beneficiaries data information to CO excel file template (100%).
 
7621 LUARDO, GLENN D. PLANNING Participate in the ISO Audit of NIA DDS-IMO November 14, 2024 100 November 14, 2024 Other Accomplishment: Prepare Layout Map of Moab Creek - Moab SIP as reference for the conduct of site validation scheduled on November 15, 2024 (100%).
 
7622 INTO, LEE WARREN PLANNING Assist in compilation of relevant files per CIS (GFC, POW, FSR, letters) for ISO audit November 12, 2024 100 November 12, 2024 Completed.
 
7623 INTO, LEE WARREN PLANNING Assist in compilation of relevant files per CIS (GFC, POW, FSR, letters) for ISO audit November 13, 2024 100 November 13, 2024 Completed.
 
7624 SASUMAN, MARY LOUISE J. PLANNING Prepare liquidation documents on the conducted Padada RIS validation activity. November 15, 2024 95 November 15, 2024 On-going compilation.
 
7625 INTO, LEE WARREN PLANNING Finalization of Padada RIS Lateral B4 and Lateral A1 canalization works under modernization program. November 14, 2024 100 November 14, 2024 Printed with transmittal.
 
7626 SASUMAN, MARY LOUISE J. PLANNING Prepare Commercial Sand and Gravel (CSAG) Certification November 15, 2024 100 November 15, 2024 Completed.
 
7627 INTO, LEE WARREN PLANNING Prepare FSDE Report as of November 15, 2024. November 15, 2024 100 November 15, 2024 Completed.
 
7628 LUARDO, GLENN D. PLANNING Conduct Site validation and Drone activity on the existing NIA Irrigation project located @ Sitio Moab, Brgy. Suawan, Marilog District, Davao City. November 15, 2024 100 November 15, 2024 Other Accomplishment: Conduct site validation at Calinan Proper, Calinan District, Davao City for Land Use Conversion applicant (100%).
 
7629 INTO, LEE WARREN PLANNING Costing of FSDE Funds (November 11 - 15, 2024) November 15, 2024 100 November 15, 2024 Completed
 
7630 INTO, LEE WARREN PLANNING Finalization of Padada RIS Lateral B4 and Lateral A1 canalization works under modernization program. November 14, 2024 100 November 14, 2024 Printed with transmittal for checking by RIO.
 
7631 SASUMAN, MARY LOUISE J. PLANNING Plot Cogon Bacaca SRIP Lateral A PAP's land titles. November 15, 2024 80 November 15, 2024 On-going plotting.
 
7632 INTO, LEE WARREN PLANNING Polishing of Padada RIS Lateral B3-A Plan and Profile. November 13, 2024 100 November 13, 2024 Adapted elevations as per PRS92 control points. Verified inconsistencies of survey data from old existing plans. Skimmed over geotagged pictures for actual conditions. Re-calculated hydraulic elements.
 
7633 EUGENIO, VENANN PLANNING ISO Audit November 14, 2024 100 November 14, 2024 Other accomplishments within the week: ISO preparation (Filing of Certificates, FVRs and other planning documents); Prepare layout maps for POW attachments; Process LUC and TOT applications; Assist TOT and LUC applicants.
 
7634 EUGENIO, VENANN PLANNING Inspection for LUC Applied Area November 15, 2024 100 November 15, 2024 Other accomplishments: Plotting of inspected area for LUC; Process LUC and TOT applications; Prepare draft MOA for LUC application; Participate in the physical fitness activities.
 
7635 CAYABYAB, REY JIM PLANNING Organize the gathered data on the conducted detailed inventory of PAPs in Cogon Bacaca SRIP - Lateral B1 November 11, 2024 100 November 11, 2024
 
7636 CAYABYAB, REY JIM PLANNING Draft communication letter to Matanao Municipal Mayor re: Projects included in FY2025 NEP for the Municipality of Matanao November 12, 2024 100 November 12, 2024
 
7637 CAYABYAB, REY JIM PLANNING Prepare Mal SRIP - Pre-Feasibility Study POW November 22, 2024 100 November 12, 2024
 
7638 CAYABYAB, REY JIM PLANNING Assist in the compilation of relevant documents for ISO Audit November 13, 2024 100 November 13, 2024
 
7639 CAYABYAB, REY JIM PLANNING Participate in the external ISO Audit November 14, 2024 100 November 14, 2024
 
7640 CAYABYAB, REY JIM PLANNING Plot the acquired land titles of PAPs in Lateral B1 of Cogon Bacaca SRIP November 15, 2024 100 November 15, 2024
 
7641 CAYABYAB, REY JIM PLANNING Prepare Balawanan River - Magsaysay SRIP - Pre-Feasibility Study POW November 22, 2024 100 November 15, 2024
 
7642 CAYABYAB, REY JIM PLANNING Prepare Balutakay River - Digos SRIP - Pre-Feasibility Study POW November 22, 2024 100 November 13, 2024
 
7659 CAYABYAB, REY JIM PLANNING FS POW on FY 2025 FSDE November 22, 2024 100 November 22, 2024
 
7661 SASUMAN, MARY LOUISE J. PLANNING Proposal on the ENGG YEAR END ASSESSMENT and COMMITEE MEETING on PAVC November 20, 2024 100 November 20, 2024 Completed.
 
7662 ESPADERA, MA LOURDES PLANNING POWERPOINT PRESENTATION ON ASBANG SRIP November 20, 2024 100 November 19, 2024
 
7664 ESPADERA, MA LOURDES PLANNING Polish and submit Miral SRIS Parcellary Map Layout November 18, 2024 100 November 18, 2024 95% Accomplishment
 
7665 ESPADERA, MA LOURDES PLANNING Consolidate updated reports of Planning & Design Unit in powerpoint presentation November 18, 2024 100 November 18, 2024
 
7666 ESPADERA, MA LOURDES PLANNING Prepare WAR and DTR November 18, 2024 100 November 18, 2024
 
7667 ESPADERA, MA LOURDES PLANNING Check and conform survey personnel DTR, WAR and other attachments November 18, 2024 100 November 18, 2024
 
7711 INTO, LEE WARREN PLANNING Attend Flag raising ceremony November 18, 2024 100 November 18, 2024 Attended on time.
 
7712 INTO, LEE WARREN PLANNING Prepared Design of Kitaha Check Dam Access road Plan and Profile under Padada RIS Modernization. November 19, 2024 95 November 19, 2024 Completed plan, profile and cross-sections from preliminary design to drafting. Road Structures to follow.
 
7713 INTO, LEE WARREN PLANNING Attend PDU technical meeting re: Padada RIS Modernization November 19, 2024 100 November 19, 2024 Attended.
 
7714 INTO, LEE WARREN PLANNING Projected funding requirement for FSDE charged personnel from January to June of 2025. November 18, 2024 100 November 18, 2024 Prepared.
 
7721 ESPADERA, MA LOURDES PLANNING Polish and submit Miral SRIS Parcellary Map Layout November 19, 2024 100 November 19, 2024
 
7724 ESPADERA, MA LOURDES PLANNING Attend Planning & Design Unit meeting to address comments for Padada RIS FS under modernization November 19, 2024 100 November 19, 2024
 
7725 ESPADERA, MA LOURDES PLANNING Prepare Survey Data References for Bacungan River - New Katipunan PIP November 20, 2024 100 November 20, 2024
 
7726 ESPADERA, MA LOURDES PLANNING Prepare Letter to BLGU for New Katipunan PIP Survey Activities and facilitate preparation of Travel Documents of Survey Team November 20, 2024 100 November 20, 2024
 
7727 ESPADERA, MA LOURDES PLANNING Plotted Moab SIP Parcellary Data November 20, 2024 100 November 20, 2024 65
 
7728 ESPADERA, MA LOURDES PLANNING Plot Bangkal CIS Survey Data (Oct 29-31, 2024) for FY 2025 Additional November 22, 2024 100 November 22, 2024 With GRC PLAN ASBANG SRIP DRAINAGE CANAL PACKAGE I
 
7729 ESPADERA, MA LOURDES PLANNING Participate in the year end games elimination November 20, 2024 100 November 20, 2024
 
7740 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag raising ceremony. November 18, 2024 100 November 18, 2024 Attended.
 
7741 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare DTRs and payrolls for PRIS and MRIS field personnel. November 18, 2024 100 November 18, 2024 Prepared and submitted.
 
7742 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate site clearing at La Union, Hagonoy. November 18, 2024 100 November 18, 2024 On-going site clearing at Lorna Timosan area.
 
7743 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate site clearing at La Union, Hagonoy. November 19, 2024 100 November 19, 2024 Completed.
 
7744 ENCABO, PRINCESS SHAIRA MAE PLANNING Inspection of delivered fertilizers for PRIS and MRIS. November 19, 2024 100 November 19, 2024 Inspected the delivered fertilizers at Padada RIS office.
 
7745 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate site clearing at La Union, Hagonoy. November 20, 2024 100 November 20, 2024 Continued site clearing at La Union.
 
7746 ENCABO, PRINCESS SHAIRA MAE PLANNING Inspect delivery of seedlings for Year 2 additional areas. November 20, 2024 100 November 20, 2024 Completed and conducted inventory at PRIS nursery.
 
7747 ENCABO, PRINCESS SHAIRA MAE PLANNING Submit IWRMP Progress Report for November 2024. November 21, 2024 100 November 21, 2024 Completed and submitted advance copy at RIO.
 
7748 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate staking at La Union, Hagonoy. November 21, 2024 100 November 21, 2024 Initially facilitated staking for the site cleared areas at La Union, Hagonoy.
 
7749 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare proposal for water quality assessment for PRIS and MRIS. November 22, 2024 100 November 22, 2024 Prepared and submitted. Already emailed Davao Analytical lab for schedule.
 
7750 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate staking/hole digging at La Union, Hagonoy. November 22, 2024 100 November 22, 2024 Completed staking, planting will commenced on Nov. 25, 2024.
 
7751 ENCABO, PRINCESS SHAIRA MAE PLANNING Inspection of coco peat/garden net delivery at Padada RIS. November 22, 2024 100 November 22, 2024 Inspected initial delivery of coco peat and garden net at Padada RIS office.
 
7761 INTO, LEE WARREN PLANNING Costing of FSDE Funds (November 18-22, 2024) November 22, 2024 100 November 22, 2024 Completed.
 
7762 INTO, LEE WARREN PLANNING Consolidated the final list of canal linings for concreting and for repair as per O&M and survey data. Attached geotagged picture per item. November 20, 2024 100 November 20, 2024 Completed and included it in write-ups in Chapter 3.2: Irrigation and Drainage Structures. Also serve as basis for the layouts to be prepared by the designated preparer.
 
7763 INTO, LEE WARREN PLANNING Worked on consolidation of geotagged pictures for the proposed repair/rehab of existing canal structures of Padada RIS under modernization program. November 22, 2024 50 November 22, 2024 Traced all existing geotagged photos that are suitable as attachment for all proposed repair/rehab of structures. Ensured that the stationing of the structures precisely coincides the survey data.
 
7764 INTO, LEE WARREN PLANNING Attend Flag Raising Ceremony November 25, 2024 100 November 25, 2024 Attended on time.
 
7765 EUGENIO, VENANN PLANNING Nov. 20-22: Attend Workshop for Updating the Geodatabase of Irrigation Systems in Region XI November 22, 2024 100 November 22, 2024 Other accomplishments within the week: Prepare and submit DTR and WAR; Reconcile Mal RIS LMC Lateral E canal alignment as per PRS92 survey data; Prepare layout maps for POW attachments; Process LUC applications.
 
7771 ESPADERA, MA LOURDES PLANNING Attend 3rd Planning & Design Section Assessment November 22, 2024 100 November 22, 2024
 
7772 ESPADERA, MA LOURDES PLANNING Prepare Communication Letter to Little Baguio for Parcellary Survey Activity November 26, 2024 100 November 26, 2024
 
7773 ESPADERA, MA LOURDES PLANNING Draft Communication Letter to RIO - Re: Return of Topcon RTK November 26, 2024 100 November 26, 2024
 
7774 ESPADERA, MA LOURDES PLANNING Attend Consultation Meeting at Matanao Municipal Hall Re: Asbang SRIP Status November 26, 2024 100 November 26, 2024
 
7781 ESPADERA, MA LOURDES PLANNING Inquire for Engineering Section Year End Assessment Preparation November 26, 2024 100 November 26, 2024
 
7782 ESPADERA, MA LOURDES PLANNING Prepare survey data references for Little Baguio I and II Parcellary Survey Activities November 26, 2024 100 November 26, 2024
 
7789 SASUMAN, MARY LOUISE J. PLANNING Prepare draft proposal on the conduct of Year-end Assessment of Engineering Section November 19, 2024 100 November 19, 2024 Completed.
 
7790 SASUMAN, MARY LOUISE J. PLANNING Assist the applicant of Commercial Sand and Gravel (CSAG). November 19, 2024 100 November 19, 2024 Completed.
 
7791 SASUMAN, MARY LOUISE J. PLANNING Attend coordination meeting with PDU personnel relative to the update and status of PRIS Modernization FSR. November 19, 2024 100 November 19, 2024 Completed.
 
7792 SASUMAN, MARY LOUISE J. PLANNING Finalize and submit for signatories the proposal on the conduct of Year-end Assessment of Engineering Section November 20, 2024 100 November 20, 2024 Completed.
 
7793 SASUMAN, MARY LOUISE J. PLANNING Prepare and submit communication letter for the proposal on the conduct of IVC meeting for LARP Activities. November 20, 2024 100 November 20, 2024 Completed.
 
7794 SASUMAN, MARY LOUISE J. PLANNING Prepare indorsement letter for proposal on the conduct of Year-end Assessment of Engineering Section November 20, 2024 100 November 20, 2024 Completed.
 
7795 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter requesting authority to travel for the Eng'g personnel on the year-end assessment. November 20, 2024 100 November 20, 2024 Completed.
 
7796 SASUMAN, MARY LOUISE J. PLANNING Prepare Commercial Sand and Gravel (CSAG) Certification November 21, 2024 100 November 21, 2024 Completed.
 
7797 SASUMAN, MARY LOUISE J. PLANNING Plot Cogon Bacaca SRIP Lateral A PAP's land titles. November 21, 2024 100 November 21, 2024 Completed.
 
7811 ESPADERA, MA LOURDES PLANNING Draft Communication Letter to RIO Re: Request Assistance in Dam Design for PRIS Modernization November 27, 2024 100 November 27, 2024
 
7812 ESPADERA, MA LOURDES PLANNING Draft Response Letter to RIO Re: SP Davao Reso 03178-24, s 2024 (Suawan SRIP) November 27, 2024 100 November 27, 2024
 
7813 ESPADERA, MA LOURDES PLANNING Draft Communication Letter to RIO Re: AGREEMENT ON THE UTILIZATION OF IFSAR DATA AND ACTUAL GROUND SURVEY DATA IN THE FINALIZATION OF TOPOGRAPHIC MAP FOR SUAWAN SRIP VE/VA REPORT November 27, 2024 100 November 27, 2024
 
7814 ESPADERA, MA LOURDES PLANNING Plotted and Submit Moab SIP Parcellary Data November 28, 2024 100 November 28, 2024
 
7815 ESPADERA, MA LOURDES PLANNING Plot Bacungan River - New Katipunan PIP Survey Data November 28, 2024 100 November 28, 2024 15% Accomplishmnent
 
7816 ESPADERA, MA LOURDES PLANNING Assist in Christmas Decoration November 28, 2024 100 November 28, 2024
 
7817 ESPADERA, MA LOURDES PLANNING Assist in Christmas Decoration November 29, 2024 100 November 29, 2024
 
7818 ESPADERA, MA LOURDES PLANNING Miscellaneous: *Provide Elevation Data for Pagan and Suawan SRIP DE POW *Finalize letter to RIO Re: Request Assistance in Dam Design for PRIS Modernization November 29, 2024 100 November 29, 2024
 
7819 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag raising ceremony. November 25, 2024 100 November 25, 2024 Attended.
 
7820 ENCABO, PRINCESS SHAIRA MAE PLANNING Oversee site preparation activities at La Union plantation sites. November 25, 2024 100 November 25, 2024 Facilitated site preparation (staking/round weeding) therein.
 
7821 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate pre-planting activities at La Union plantation sites. November 26, 2024 100 November 26, 2024 Facilitated basal application of 14-14-14 and vermicast for the dug hole prior to planting.
 
7822 ENCABO, PRINCESS SHAIRA MAE PLANNING Follow up status of submitted proposal for Semestral Assessment and Water Quality Assessment for Padada and Mal RIS. November 26, 2024 100 November 26, 2024 Forwarded proposal for Semestral Assessment to RIO; Revised parameters for Water Quality Assessment.
 
7823 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate hauling and planting of seedlings at La Union plantation sites. November 27, 2024 100 November 27, 2024 Hauled and planted 155 seedlings for one of the plantation site in Brgy. La Union, Hagonoy.
 
7824 ENCABO, PRINCESS SHAIRA MAE PLANNING Follow up status of the schedule of Water Quality Assessment from Davao Analytical Laboratories, Inc. November 27, 2024 100 November 27, 2024 Emailed DaLinc for their available schedule for submission of water samples as well as the prices for the desired parameters to be tested.
 
7825 ENCABO, PRINCESS SHAIRA MAE PLANNING Update inventory report for the plantation's survival and mortality. November 28, 2024 100 November 28, 2024 Updated and submitted inventory report.
 
7826 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate field activities for Padada RIS nursery personnel. November 28, 2024 100 November 28, 2024 Facilitated site preparation for another landowner at Brgy. La Union, Hagonoy.
 
7827 ENCABO, PRINCESS SHAIRA MAE PLANNING Deliver communication letter and coordinated with MANP PASu for the purpose of adopting areas for rehabilitation in protected zone. November 29, 2024 100 November 29, 2024 Delivered letter to MANP and coordinated with Mr. Ershad and Cleofe re: Public land to be adopted for tree growing and rehabilitation.
 
7828 ENCABO, PRINCESS SHAIRA MAE PLANNING Dissemination of DTR for Padada and Mal RIS personnel. November 29, 2024 100 November 29, 2024 Disseminated and collected DTRs from PRIS and MRIS field personnel; Nursery visitation at Mal RIS.
 
7829 ENCABO, PRINCESS SHAIRA MAE PLANNING Oversee planting activity at La Union plantation. November 29, 2024 100 November 29, 2024 Field personnel planted 55 seedlings for Mr. Bobby Timosan at La Union, Hagonoy.
 
7830 INTO, LEE WARREN PLANNING Costing of FSDE Funds (November 25-29, 2024) November 29, 2024 100 November 29, 2024 Completed.
 
7831 INTO, LEE WARREN PLANNING Prepared the list of service roads with geotagged pictures within the existing system of Padada RIS as attachment in the FSR. November 28, 2024 100 November 28, 2024 Completed.
 
7832 INTO, LEE WARREN PLANNING Assisted in the conduct of discharge measurements at Parat and Sacub supplementary dams. November 29, 2024 100 November 29, 2024 Conducted discharge measurement at the said dams. Also conducted measurements on the unlined canals of Padada RIS SMIA Lateral A1 for the justification of concreting of earth canals in the modernization FSR.
 
7833 INTO, LEE WARREN PLANNING Worked on the write-ups on Chapter 1.6: Primary Recommended Works November 25, 2024 100 November 25, 2024 Requested from construction unit for list of all works in Padada RIS within 2024 and 2025. Categorized all works under Modernization as per implementation year while maintaining consistency with the O&M three-year implementation plan.
 
7834 INTO, LEE WARREN PLANNING Prepared the list of canal structures with geotagged pictures within the existing system of Padada RIS as attachment in the FSR. November 27, 2024 100 November 28, 2024 Completed.
 
7835 INTO, LEE WARREN PLANNING Assist in Christmas Decoration November 28, 2024 100 November 28, 2024 Completed.
 
7836 INTO, LEE WARREN PLANNING Assist in Christmas Decoration November 29, 2024 100 November 29, 2024 Completed.
 
7837 CAYABYAB, REY JIM PLANNING Prepare communication letter to Matanao Municipal Mayor re: FY 2025 projects for Matanao, Davao del Sur November 19, 2024 100 November 19, 2024
 
7838 CAYABYAB, REY JIM PLANNING Prepare communication letter to Cong. Ungab re: FY 2025 projects for 3rd District, Davao City November 20, 2024 100 November 20, 2024
 
7839 CAYABYAB, REY JIM PLANNING Prepare Asbang SRIP - Detailed Engineering Design Program of Works for FY 2025 November 25, 2024 100 November 25, 2024
 
7840 CAYABYAB, REY JIM PLANNING Prepare Kapliko Creek - North Lamidan SIP - Feasibility Study Program of Works for FY 2025 November 26, 2024 100 November 26, 2024
 
7841 CAYABYAB, REY JIM PLANNING Print and bind FSDE POW for FY 2025 November 27, 2024 100 November 27, 2024
 
7843 CAYABYAB, REY JIM PLANNING Prepare Pagan SRIP - Detailed Engineering Design Program of Works for FY 2025 November 28, 2024 100 November 28, 2024
 
7844 CAYABYAB, REY JIM PLANNING Prepare Suawan SRIP - Detailed Engineering Design Program of Works for FY 2025 November 29, 2024 100 November 29, 2024
 
7845 MARTURILLAS, JOHN LLOYD PLANNING To convey the calibration and registration of GNSS-Receivers at NAMRIA and SURVEYTECH CORPORATION November 18, 2024 100 November 21, 2024 Completed
 
7852 CAYABYAB, REY JIM PLANNING Prepare San Jose SIP (4M) - Program of Works for FY 2024 Additional projects November 22, 2024 100 November 22, 2024
 
7853 MARTURILLAS, JOHN LLOYD PLANNING Prepare Liquidation of Travel and Liquidation of Cash Advance for Calibration and Registration of GNSS-RECEIVERS November 25, 2024 100 November 25, 2024 Completed
 
7854 SASUMAN, MARY LOUISE J. PLANNING Monitor the accomplishment of LARP activities (consolidation of data and update of database) in Cogon Bacaca SRIP November 26, 2024 100 November 26, 2024
 
7855 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 5 LUC Applications November 26, 2024 100 December 26, 2024 Completed
 
7856 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map November 26, 2024 10 November 26, 2024
 
7857 SASUMAN, MARY LOUISE J. PLANNING Finalize and submit communication letter for the proposal on the conduct of IVC meeting for LARP Activities. November 26, 2024 100 November 26, 2024
 
7858 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map November 27, 2024 13 November 27, 2024
 
7859 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map November 28, 2024 16 November 28, 2024
 
7860 SASUMAN, MARY LOUISE J. PLANNING Prepare communication letter re: Request for Guidance and Certification Regarding Ancestral Domain Clearance for the Padada Ris Modernization Activities November 27, 2024 0 N/A
 
7861 SASUMAN, MARY LOUISE J. PLANNING Assist in the PDU office Christmas decoration. November 27, 2024 0 N/A
 
7862 SASUMAN, MARY LOUISE J. PLANNING Prepare and comply comments on Envi. and Social aspect of Padada RIS Modernization FSR. November 28, 2024 0 N/A
 
7863 SASUMAN, MARY LOUISE J. PLANNING Assist in the PDU office Christmas decoration. November 28, 2024 0 N/A
 
7864 SASUMAN, MARY LOUISE J. PLANNING Attend meeting on the Integrated Padada River Watershed Management Plan at DENR-PENRO. November 29, 2024 0 N/A
 
7867 EUGENIO, VENANN PLANNING Assist and contact LUC and TOT applicants; Process LUC & TOT applications; Prepare layout maps for FVR attachments November 25, 2024 100 November 25, 2024 Other accomplishments: Attend flag raising ceremony
 
7870 EUGENIO, VENANN PLANNING Assist and contact LUC and TOT applicants; Process LUC & TOT applications; Prepare layout maps for FVR attachments November 26, 2024 100 November 26, 2024 Other accomplishments: PDU Office Decoration
 
7872 EUGENIO, VENANN PLANNING Assist and contact LUC and TOT applicants; Process LUC & TOT applications; Prepare layout maps for POW attachments November 27, 2024 100 November 27, 2024 Other accomplishments: PDU Office Decoration
 
7877 EUGENIO, VENANN PLANNING Check LUCs and TOTs for printing; Prepare layout maps for FVR attachments; Contact LUC and TOT applicants November 28, 2024 100 November 28, 2024 Other accomplishments: PDU Office Decoration
 
7878 EUGENIO, VENANN PLANNING Conduct discharge Calibration at Padada RIS Sacub Dam, Parat Dam, and Expansion area proposed sources November 29, 2024 100 November 29, 2024 Other accomplishments: PDU Office Decoration
 
7879 LUARDO, GLENN D. PLANNING Attend and Participate in Flag Raising Ceremony November 18, 2024 100 November 18, 2024
 
7880 LUARDO, GLENN D. PLANNING Prepare Affidavit of Undertaking for the proposed Basiawan PIP as requirements fro the CNO of NCIP. November 18, 2024 100 November 18, 2024 Already submitted to PDU, Head for review; Other Accomplishment: Prepared DTR for the Month of November 1-15, 2024 (100%)
 
7881 LUARDO, GLENN D. PLANNING Attend PDU coordination Meeting regarding the commitment in revising Padada RIS FSR under Modernization program based on C.O. comments. November 19, 2024 100 November 19, 2024
 
7882 LUARDO, GLENN D. PLANNING Proposal for the conduct of FPIC on Cogon Bacaca SRIP November 20, 2024 100 November 20, 2024 Already submitted to PDU, Head for review; Other Accomplishment: Encoded 2 Agro-economic survey data for Farmer activities of Padada RIS under Modernization Program.
 
7883 LUARDO, GLENN D. PLANNING Encode Agro-economic survey data for Farmer activities of Padada RIS under Modernization Program. November 21, 2024 100 November 21, 2024 Encoded 7 farmer beneficiaries data information.
 
7884 LUARDO, GLENN D. PLANNING Review Agro-economic data encoded for Farmer activities of Padada RIS under Modernization Program and submitted to NIA C.O. personnel for analysis. November 22, 2024 100 November 22, 2024
 
7885 LUARDO, GLENN D. PLANNING Attend and Participate in Flag Raising Ceremony November 25, 2024 100 November 25, 2024
 
7886 LUARDO, GLENN D. PLANNING Update and submit PPMP of PDU for CY 2024 November 25, 2024 100 November 25, 2024 Other Accomplishments: Prepared 2 PR fro PDU activities (100%), Assisted Client in Land Use Classification application (100%).
 
7887 LUARDO, GLENN D. PLANNING Attend Consultative Meeting with LGU Matanao for the proposed Asbang SRIP Project. November 26, 2024 100 November 26, 2024
 
7888 LUARDO, GLENN D. PLANNING Prepare communication letter to NCIP Provincial of Davao City for the proposed Kibangay PIP project. November 27, 2024 100 November 27, 2024 Other Accomplishments: Installed and activate Civil 3D Subscription program to 1 unit computer of PDU personnel (100%), Facilitated in signing of Work and Financial Plan (WFP) for Cogon Bacaca SRIP Project (100%).
 
7889 LUARDO, GLENN D. PLANNING Prepare Memorandum of Agreement (MOA) regarding the conduct of Free and Prior Informed Consent (FPIC) activities with NCIP. November 28, 2024 100 November 28, 2024 Other Accomplishments: Assisted 2 Client in Land Use Classification application (100%), Participated in the decoration of PDU in preparation for Christmas Season.
 
7890 LUARDO, GLENN D. PLANNING Deliver communication letter to PAGRO, BIR, Provincial Assessor, and NCIP Office regarding the Cogon Bacaca SRIP activities. November 29, 2024 100 November 29, 2024 Other Accomplishment: Participated in the decoration of PDU in preparation for Christmas Season.
 
7940 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag raising ceremony. December 2, 2024 100 December 2, 2024 - Attended. - Prepared DTRs and submitted payrolls of field personnel of Padada and Mal RIS.
 
7941 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate site preparation at La Union plantation sites. December 2, 2024 100 December 2, 2024 - Facilitated fertilizer application/planting at La Union plantation sites. - Facilitated changing of garden net at PRIS nursery.
 
7942 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring at PRIS plantation sites. December 3, 2024 100 December 3, 2024 - Facilitated site inspection, fertilizer application and clearing at plantation sites in preparation of semestral assessment.
 
7943 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at MRIS. December 4, 2024 100 December 4, 2024 Monitored plantation sites and facilitated relevant activities therein.
 
7944 ENCABO, PRINCESS SHAIRA MAE PLANNING TO attend Year End Assessment for NIA Davao del Sur IMO. December 5, 2024 100 December 5, 2024 - Attended Year End Assessment. - Monitored site clearing at Malabang plantation sites.
 
7945 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend Year End Assessment for NIA Davao del Sur IMO. December 6, 2024 100 December 6, 2024 - Attended Year End Assessment. - Monitored site clearing at Malabang plantation sites and clearing of nursery.
 
7950 MARTURILLAS, JOHN LLOYD PLANNING NIA DDS IMO Year End Assessment December 6, 2024 100 December 6, 2024
 
7951 MARTURILLAS, JOHN LLOYD PLANNING NIA DDS IMO Year End Assessment December 5, 2024 50 December 5, 2024
 
7952 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 5 LUC Applications December 4, 2024 100 N/A completed
 
7959 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map December 2, 2024 19 December 2, 2024
 
7960 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map December 3, 2024 22 December 3, 2024
 
7961 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map December 4, 2024 25 December 4, 2024
 
8041 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. December 9, 2024 100 December 9, 2024 Inspected clearing activities at Brgy. Malabang, La Union, Malabang and Clib, Hagonoy, DDS.
 
8042 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites. December 10, 2024 100 December 10, 2024 Inspected nursery and prepared presentation for the upcoming Semestral Assessment.
 
8043 ENCABO, PRINCESS SHAIRA MAE PLANNING Water Quality Assessment for Plantation Sites. December 11, 2024 100 December 11, 2024 Completed and submitted samples to DaLinc.
 
8044 ENCABO, PRINCESS SHAIRA MAE PLANNING Conduct of Semestral Monitoring and Assessment of plantation sites at PRIS. December 11, 2024 100 December 11, 2024 Completed.
 
8045 ENCABO, PRINCESS SHAIRA MAE PLANNING Water Quality Assessment for Plantation Sites. December 12, 2024 100 December 12, 2024 Completed and submitted samples to DaLinc.
 
8046 ENCABO, PRINCESS SHAIRA MAE PLANNING Conduct of Semestral Monitoring and Assessment of plantation sites at MRIS. December 12, 2024 100 December 12, 2024 Completed.
 
8047 ENCABO, PRINCESS SHAIRA MAE PLANNING Exit Conference for Semestral Monitoring and Assessment for PRIS and MRIS plantation sites. December 13, 2024 100 December 13, 2024 Completed.
 
8065 INTO, LEE WARREN PLANNING Costing of FSDE Funds (December 2-6, 2024) December 6, 2024 100 December 6, 2024 Completed.
 
8066 INTO, LEE WARREN PLANNING Costing of FSDE Funds (December 9-13, 2024) December 13, 2024 100 December 13, 2024 Completed.
 
8067 INTO, LEE WARREN PLANNING Attended NIA Year-End Assessment. December 6, 2024 100 December 6, 2024 Attended and participated.
 
8068 INTO, LEE WARREN PLANNING Attend Flag Raising Ceremony December 2, 2024 100 December 2, 2024 Attended on time.
 
8069 INTO, LEE WARREN PLANNING Attend Flag Raising Ceremony December 9, 2024 100 December 9, 2024 Attended on time.
 
8070 INTO, LEE WARREN PLANNING Attend Flag Raising Ceremony December 16, 2024 100 December 16, 2024 Attended on time.
 
8071 INTO, LEE WARREN PLANNING Submitted final draft of Padada RIS: Service Road for Kitaha Creek Dam under Modernization program. December 11, 2024 100 December 11, 2024 Printed 1 copy to be signed and scanned for submission of e-copy to RIO for final checking.
 
8073 INTO, LEE WARREN PLANNING Submitted final draft of Padada RIS: DRQ Drainage Canal under Modernization program. December 12, 2024 100 December 12, 2024 Printed 1 copy to be signed and scanned for submission of e-copy to RIO for final checking.
 
8081 CAYABYAB, REY JIM PLANNING Print and bind Pagan & Suawan SRIP DED POW for FY 2025 projects December 2, 2024 100 December 2, 2024
 
8082 CAYABYAB, REY JIM PLANNING Print and bind San Jose PIP POW under FY 2024 Additional funds December 3, 2024 100 December 3, 2024
 
8083 CAYABYAB, REY JIM PLANNING Plot the acquired Proof of Ownership (Land Titles) from PAPs of Lateral C, D, D1, D1-A for LARP of Cogon Bacaca SRIP December 4, 2024 100 December 4, 2024
 
8084 CAYABYAB, REY JIM PLANNING Preparation for the 2024 year-end assessment of NIA-DDS IMO December 5, 2024 100 December 5, 2024
 
8085 CAYABYAB, REY JIM PLANNING Participated in the 2024 year-end assessment of NIA-DDS IMO December 6, 2024 100 December 6, 2024
 
8095 CAYABYAB, REY JIM PLANNING Plot the acquired Proof of Ownership (Land Titles) last December 5, 2024 from PAPs for LARP of Cogon Bacaca SRIP December 9, 2024 100 December 9, 2024
 
8096 EUGENIO, VENANN PLANNING Check LUC and TOT documents, Assist LUC and TOT applicants, Contact LUC and TOT applicants, Prepare layout map for FVR attachment. December 2, 2024 100 December 2, 2024
 
8097 EUGENIO, VENANN PLANNING Check LUC and TOT documents, Assist LUC and TOT applicants, Contact LUC and TOT applicants, Prepare layout map for FVR attachment. December 3, 2024 100 December 3, 2024
 
8098 EUGENIO, VENANN PLANNING Check LUC and TOT documents, Assist LUC and TOT applicants, Contact LUC and TOT applicants, Prepare layout map for FVR attachment. December 4, 2024 100 December 4, 2024
 
8099 EUGENIO, VENANN PLANNING NIA DDS IMO Year-End Assessment December 5, 2024 100 December 5, 2024
 
8100 EUGENIO, VENANN PLANNING NIA DDS IMO Year-End Assessment December 6, 2024 100 December 6, 2024
 
8101 CAYABYAB, REY JIM PLANNING Plot the acquired Proof of Ownership (Land Titles) last December 9, 2024 from PAPs for LARP of Cogon Bacaca SRIP December 10, 2024 100 December 10, 2024
 
8102 CAYABYAB, REY JIM PLANNING Plot the acquired Proof of Ownership (Land Titles) last December 10, 2024 from PAPs for LARP of Cogon Bacaca SRIP December 11, 2024 100 December 11, 2024
 
8103 CAYABYAB, REY JIM PLANNING Plot the acquired Proof of Ownership (Land Titles) last December 11, 2024 from PAPs for LARP of Cogon Bacaca SRIP December 12, 2024 100 December 12, 2024
 
8104 EUGENIO, VENANN PLANNING Prepare Layout Maps IMT Contract attachment, Prepare other data requested by IDU, Assist LUC and TOT applicants, Contact LUC and TOT applicants December 9, 2024 100 December 9, 2024
 
8105 CAYABYAB, REY JIM PLANNING Update monitoring sheet of Cogon Bacaca SRIP LARP December 12, 2024 100 December 12, 2024
 
8106 EUGENIO, VENANN PLANNING Prepare Layout Maps for POW and report attachment, Check LUC and TOT documents, Assist LUC and TOT applicants, Contact LUC and TOT applicants December 10, 2024 100 December 10, 2024
 
8107 CAYABYAB, REY JIM PLANNING Conduct coordination meeting with the IVC on Fair Market Value (FMV) establishment for LARP of Cogon Bacaca SRIP December 13, 2024 100 December 13, 2024
 
8108 EUGENIO, VENANN PLANNING Assist in the conduct of water sampling at Padada RIS plantation site December 11, 2024 100 December 11, 2024
 
8109 EUGENIO, VENANN PLANNING Assist in the conduct of water sampling at Mal RIS plantation site December 12, 2024 100 December 12, 2024
 
8110 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony. December 2, 2024 100 December 2, 2024
 
8111 SASUMAN, MARY LOUISE J. PLANNING Prepare and comply comments on Envi and Social Aspect in Padada RIS Modernization FSR December 2, 2024 100 December 2, 2024 Completed.
 
8112 SASUMAN, MARY LOUISE J. PLANNING Organize the gathered data on the detailed inventory of PAPs in Cogon Bacaca SRIP, Lateral A and Lateral D December 3, 2024 100 December 3, 2024 Completed.
 
8113 SASUMAN, MARY LOUISE J. PLANNING Attend First Technical Review by DENR-EMB RXI for the submitted EIS Report via MS Teams December 4, 2024 100 December 4, 2024 Completed.
 
8114 SASUMAN, MARY LOUISE J. PLANNING Attend coordination meeting with RIO personnel and Green Collar Consulants for the compliance of the lacking documents of EIS Report December 4, 2024 100 December 4, 2024 Completed.
 
8115 SASUMAN, MARY LOUISE J. PLANNING Plot CSAG area for application and prepared Commercial Sand and Gravel (CSAG) Certification December 5, 2024 100 December 5, 2024 Completed.
 
8116 EUGENIO, VENANN PLANNING Recalculate Generated rainfall data of Padada RIS under Modernization Program as per CO Comment, Process LUC and TOT applications, Assist LUC and TOT applicants December 13, 2024 100 December 13, 2024
 
8117 SASUMAN, MARY LOUISE J. PLANNING Assist in the preparation for the upcoming DDS IMO Year-end assessment CY 2024 December 5, 2024 100 December 5, 2024 Completed.
 
8118 SASUMAN, MARY LOUISE J. PLANNING Prepare ppt presentation for NIA DDS IMO Staff Meeting December 9, 2024 100 December 9, 2024 Completed.
 
8119 SASUMAN, MARY LOUISE J. PLANNING Attend NIA DDS IMO Staff Meeting December 9, 2024 100 December 9, 2024 Completed.
 
8120 SASUMAN, MARY LOUISE J. PLANNING Prepare Commercial Sand and Gravel (CSAG) Certification December 10, 2024 100 December 10, 2024 Completed.
 
8121 INTO, LEE WARREN PLANNING Re-compiled Annex B of Padada RIS Modernization FSR December 2, 2024 50 December 2, 2024 Annex B.1 not compiled due to several general layouts to be updated. Revised attached sample DED Plans and edited Padada RIS Dams existing DED for clarity and readability.
 
8122 SASUMAN, MARY LOUISE J. PLANNING Assist CSAG applicants and released CSAG Certification December 10, 2024 100 December 10, 2024 Completed.
 
8123 SASUMAN, MARY LOUISE J. PLANNING Prepare data needed for the IVC Coordination Meeting for Cogon Bacaca SRIP LARP Formulation December 10, 2024 100 December 10, 2024 Completed.
 
8124 SASUMAN, MARY LOUISE J. PLANNING Prepare data needed for the IVC Coordination Meeting for Cogon Bacaca SRIP LARP Formulation December 11, 2024 100 December 11, 2024 Completed.
 
8125 INTO, LEE WARREN PLANNING Prepared Convergence Report for the month of November December 2, 2024 100 December 2, 2024 Printed 3 copies with transmittal. Submitted advance e-copy to RIO.
 
8126 SASUMAN, MARY LOUISE J. PLANNING Plot Cogon Bacaca SRIP PAP's land titles December 11, 2024 100 December 11, 2024 Completed.
 
8127 SASUMAN, MARY LOUISE J. PLANNING Organize the gathered data on the detailed inventory of PAPs in Cogon Bacaca SRIP Lateral D December 11, 2024 100 December 11, 2024 Completed.
 
8128 SASUMAN, MARY LOUISE J. PLANNING Provide data to CO and RIO personnel relative to the conduct of pumping test for Padada RIS Modernization December 12, 2024 100 December 12, 2024 Completed.
 
8129 INTO, LEE WARREN PLANNING Checked and made necessary edits on Padada RIS: DRI drainage canal draft DED prepared by draftsmen. December 3, 2024 60 December 3, 2024 Edited Plan and Profile using appropriate font style, size and spacing of labels. Polished the overall assembly of the Profile view. Edited the Plan elements and symbols. Arranged the Cross Sections in a way to avoid overlapping drawings. Changed canal Se
 
8130 SASUMAN, MARY LOUISE J. PLANNING Prepare data needed for the IVC Coordination Meeting for Cogon Bacaca SRIP LARP Formulation December 12, 2024 100 December 12, 2024 Completed.
 
8131 SASUMAN, MARY LOUISE J. PLANNING Attend and participated on the IVC Coordination Meeting for Cogon Bacaca SRIP LARP Formulation with other government agencies December 13, 2024 100 December 13, 2024 Completed.
 
8132 INTO, LEE WARREN PLANNING Prepared final draft of Plan and Profile for Kitaha Creek Dam Service Road. December 4, 2024 100 December 4, 2024 Consolidated geotagged pictures for reference with regards to actual site condition. Corrected survey data alignment. Made necessary computations for Road elements.
 
8133 INTO, LEE WARREN PLANNING Prepared PERT-CPM for Cabacungan CIS Program of Works FY 2025. December 5, 2024 100 December 5, 2024 Prepared and printed 5 copies.
 
8134 INTO, LEE WARREN PLANNING Continued drafting Padada RIS: DRQ drainage canal cross sections December 9, 2024 100 December 9, 2024 Completed remaining Station 1+120 to Sta 3+348
 
8135 INTO, LEE WARREN PLANNING Prepared final draft of Cross Sections for Kitaha Creek Dam Service Road DED. December 10, 2024 100 December 10, 2024 Completed.
 
8136 INTO, LEE WARREN PLANNING Prepared Drainage Culvert Plan for Kitaha Creek Dam Service Road DED. December 10, 2024 100 December 10, 2024 Crafted a 3D model. Extracted sectional views and made few detailing and labeling. Presented in a typical structure with dimensions per station in matrix form.
 
8137 INTO, LEE WARREN PLANNING Made few edits over the draft DED of Padada RIS: DRQ Drainage Canal December 11, 2024 100 December 11, 2024 Made few corrections over the template, typical sections and title block texts.
 
8151 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map December 9, 2024 0 N/A
 
8152 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 4 LUC Applications December 9, 2024 100 December 9, 2024 completed
 
8153 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map December 10, 2024 0 N/A
 
8154 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map December 11, 2024 0 N/A
 
8155 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 4 LUC Applications December 11, 2024 100 December 11, 2024 completed
 
8156 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawap SRIP Topographic Map December 12, 2024 0 N/A
 
8157 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 1 LUC Applications December 12, 2024 100 December 12, 2024 completed
 
8158 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map December 13, 2024 0 N/A
 
8159 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 1 LUC Application December 13, 2024 100 December 13, 2024 completed
 
8186 LUARDO, GLENN D. PLANNING Attend and Participate in Flag Raising Ceremony December 2, 2024 100 December 2, 2024
 
8189 LUARDO, GLENN D. PLANNING Revise Memorandum of Agreement (MOA) regarding the conduct of Free and Prior Informed Consent (FPIC) activities with NCIP. December 2, 2024 100 December 2, 2024 1st Revision completed and submitted to PDU Head for review; Other Accomplishment: Revised 2 PR for IWRMP activities of Planning and Design Unit (100%)
 
8191 LUARDO, GLENN D. PLANNING Revise Communication Letter for NCIP Provincial Davao City for the Proposed Kibangay SRIP. December 3, 2024 100 December 3, 2024 1st Revised completed and submitted to PDU Head for review; Other Accomplishments: Prepare layout map of the proposed Kibangay PIP as attachment for request letter to NCIP Davao City Provincial Office (60%), Assist 2 applicant in LUC application (100%).
 
8195 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag raising ceremony. December 16, 2024 100 December 16, 2024 Attended.
 
8196 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. December 16, 2024 100 December 16, 2024 Completed and facilitated in planting at La Union sites.
 
8199 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend Engineering & Operation Section Year-End Assessment at Glan, Sarangani. December 17, 2024 100 December 17, 2024 Attended.
 
8201 ENCABO, PRINCESS SHAIRA MAE PLANNING To attend Engineering & Operation Section Year End Assessment at Glan, Sarangani. December 18, 2024 100 December 18, 2024 Attended.
 
8202 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection of plantation sites at PRIS. December 19, 2024 100 December 19, 2024 On-going site preparation at La Union plantation sites.
 
8203 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare IWRMP Progress Report for December 2024. December 20, 2024 100 December 20, 2024 - Prepared and submitted IWRMP Progress Report for December 2024. - Facilitate on-going plantation at La Union planting sites under Y2 implementation.
 
8204 LUARDO, GLENN D. PLANNING Prepare Layout Map of the proposed Kibangay PIP as attachment for request letter to NCIP Davao City Provincial Office. December 4, 2024 100 December 4, 2024 Other Accomplishment: Prepare Layout Map of the proposed Admol Creek - Asinan SIP as attachment for request letter to NCIP Davao del Sur Provincial Office (50%).
 
8205 LUARDO, GLENN D. PLANNING Attend and participate in Year End Assessment of NIA DDS-IMO. December 5, 2024 100 December 5, 2024
 
8206 LUARDO, GLENN D. PLANNING Attend and participate in Year End Assessment of NIA DDS-IMO. December 6, 2024 100 December 6, 2024
 
8208 LUARDO, GLENN D. PLANNING Update Present Land Use, Future Land Use, Cropped Area, Cropping Intensity, Yield, and Production based on the comments from Central Office personnel for FS Padada RIS Modernization Program. December 10, 2024 100 December 10, 2024 Other Accomplishment: 2nd Revision Memorandum of Aggreement (MOA) regarding the conduct of Free and Prior Informed Consent (FPIC) activities with NCIP (100%).
 
8209 LUARDO, GLENN D. PLANNING Attend and Participate in the virtual meeting on Online Report on Davao City and Davao del Sur's November 2024 Inflation. December 11, 2024 100 December 11, 2024 Other Accomplishments: Prepare Layout Map of Kisulan SPIP as attachment for Variation Order (100%), Assist 1 applicant in LUC application (100%).
 
8210 LUARDO, GLENN D. PLANNING Prepare updated layout Map of Suawan River - Tamugan SIP as attachment for Project Completion Report (PCR) for CY 2020 and CY 2024. December 12, 2024 100 December 12, 2024
 
8211 LUARDO, GLENN D. PLANNING Attend and participate in the Inventory and Valuation Committee (IVC) Coordination Meeting for Cogon Bacaca SRIP LARP Formulation. December 13, 2024 100 December 13, 2024 Other Accomplishment: Attend and Participate in Zumba activity (100%).
 
8212 LUARDO, GLENN D. PLANNING Assist in the conduct of Turn-over Ceremony @ Brgy. Sto. Nino, Kiblawan, Davao del Sur for the Waterfall SIP Project. December 16, 2024 100 N/A Other Accomplishment: Prepare DTR for the Month of December 1-15, 2024 (100%), Prepare 5 PR for Oil and Fuel of Planning and Design Unit various activities (100%).
 
8213 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony December 16, 2024 100 December 16, 2024
 
8214 LUARDO, GLENN D. PLANNING Attend Engineering & Operation Section Year End Assessment at Glan, Sarangani Province. December 17, 2024 100 December 17, 2024
 
8215 LUARDO, GLENN D. PLANNING Attend Engineering & Operation Section Year End Assessment at Glan, Sarangani Province. December 18, 2024 100 December 18, 2024
 
8216 LUARDO, GLENN D. PLANNING Prepare and update Economic and Financial analysis of the Feasibility Study Report of Padada RIS Modernization Program. December 19, 2024 70 December 19, 2024 Other Accomplishment: Assisted 2 applicant in LUC & TOT application (100%).
 
8217 LUARDO, GLENN D. PLANNING Prepare Layout map of the conducted site inspection @ Calinan District for the Proposed realignment of the existing canal lining of Lacson CIS. December 20, 2024 100 December 20, 2024 Other Accomplishments: Prepared 2 PR for Planning and Design Unit Activities (100%), Assisted 1 applicant in TOT application (100%).
 
8220 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection at plantation sites at PRIS. December 23, 2024 100 December 23, 2024 Completed. Designated some personnel to help in the clearing of debris within Parat and Sacub dam.
 
8221 ENCABO, PRINCESS SHAIRA MAE PLANNING Dissemination of DTR to the field personnel and facilitate other activities on-site. December 23, 2024 100 December 23, 2024 Completed.
 
8235 LUARDO, GLENN D. PLANNING Prepare and update Economic and Financial analysis of the Feasibility Study Report of Padada RIS Modernization Program. December 23, 2024 100 December 23, 2024 Other Accomplishments: Attended and Participated in Flag Raising Ceremony (100%), Prepared proposal for the PDU Year End assessment CY 2024 (70%).
 
8236 LUARDO, GLENN D. PLANNING Prepare letter request to NCIP Davao del Sur Provincial Office regarding the updates of the final schedule of FPIC activities for the proposed Cogon Bacaca SRIP Project. December 26, 2024 100 December 26, 2024 Completed and Submitted to PDU Head for review; Other Accomplishment: Plotting surveyed data for the existing Unifarm CIS Project (20%).
 
8237 LUARDO, GLENN D. PLANNING Prepare proposal for the PDU Year End assessment CY 2024. December 26, 2024 100 December 26, 2024
 
8238 LUARDO, GLENN D. PLANNING Revise letter request to NCIP Davao del Sur Provincial Office regarding the updates of the final schedule of FPIC activities for the proposed Cogon Bacaca SRIP Project. December 27, 2024 100 December 27, 2024 1st revision Completed and Submitted to PDU Head for review; Other Accomplishment: Attended in the Pasasalamat at Pagpupugay Celebration of the Retired NIA DDS-IMO personnel (100%).
 
8239 LUARDO, GLENN D. PLANNING Plotting surveyed data for the existing Unifarm CIS Project. December 27, 2024 100 December 27, 2024 1st revision Completed and Submitted to PDU Head for review; Other Accomplishment: Attended in the Pasasalamat at Pagpupugay Celebration of the Retired NIA DDS-IMO personnel (100%), Plotting surveyed data for the existing Unifarm CIS Project (40%).
 
8240 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony. December 16, 2024 0 N/A
 
8241 SASUMAN, MARY LOUISE J. PLANNING Prepare DTR and WAR for the period of Dec.1-15, 2024 December 16, 2024 0 N/A
 
8275 ESPADERA, MA LOURDES PLANNING Prepare WAR and DTR December 2, 2024 100 December 2, 2024
 
8276 ESPADERA, MA LOURDES PLANNING Check and conform survey personnel DTR, WAR and other attachments December 2, 2024 100 December 2, 2024
 
8277 ESPADERA, MA LOURDES PLANNING Train Survey Personnel Civil 3D (Plotting & Labelling) December 2, 2024 100 December 2, 2024 30%
 
8278 ESPADERA, MA LOURDES PLANNING Train Survey Personnel Civil 3D (Plotting & Labelling) December 3, 2024 100 December 3, 2024 75%
 
8279 ESPADERA, MA LOURDES PLANNING Finalize Response Letter to RIO Re: SP Davao Reso 03178-24, s 2024 (Suawan SRIP) December 3, 2024 100 December 3, 2024
 
8280 ESPADERA, MA LOURDES PLANNING Train Survey Personnel Civil 3D (Plotting & Labelling) December 4, 2024 100 December 4, 2024 100%
 
8281 ESPADERA, MA LOURDES PLANNING Attend NIA Davao del Sur IMO Year End Assessment December 5, 2024 100 December 5, 2024
 
8282 ESPADERA, MA LOURDES PLANNING Attend NIA Davao del Sur IMO Year End Assessment December 6, 2024 100 December 6, 2024
 
8283 ESPADERA, MA LOURDES PLANNING Participate discussion for Lacson CIS (Altrade, Inc.) Survey Activities/ Prepare Survey Data References December 9, 2024 100 December 9, 2024
 
8284 ESPADERA, MA LOURDES PLANNING Update FY 2026 Survey Accomplishment in LARK Software December 9, 2024 100 December 9, 2024
 
8285 ESPADERA, MA LOURDES PLANNING Edited Moab Parcellary Map Layout and Transmittal to RIO December 9, 2024 100 December 9, 2024
 
8286 ESPADERA, MA LOURDES PLANNING Finalized & Submitted Bacungan River - New Katipunan PIP Plotted Data December 9, 2024 100 December 9, 2024 20%
 
8287 ESPADERA, MA LOURDES PLANNING Finalized & Submitted Bacungan River - New Katipunan PIP Plotted Data December 10, 2024 100 December 10, 2024 80%
 
8288 ESPADERA, MA LOURDES PLANNING Prepare SHP File of Asinan SPIP December 10, 2024 100 December 10, 2024
 
8289 ESPADERA, MA LOURDES PLANNING Facilitate Booking Changes for Year End Assessment at Isla Jardin December 10, 2024 100 December 10, 2024
 
8290 ESPADERA, MA LOURDES PLANNING Finalized & Submitted Bacungan River - New Katipunan PIP Plotted Data December 11, 2024 100 December 11, 2024
 
8291 ESPADERA, MA LOURDES PLANNING Finalized & Submitted Mal RIS - Latian Dam FY 2026 Plotted Data December 11, 2024 100 December 11, 2024 80%
 
8292 ESPADERA, MA LOURDES PLANNING Conducted survey activities at Lower Marber CIS December 12, 2024 100 December 12, 2024
 
8293 ESPADERA, MA LOURDES PLANNING Finalized & Submitted Mal RIS - Latian Dam FY 2026 Plotted Data December 13, 2024 100 December 13, 2024
 
8294 ESPADERA, MA LOURDES PLANNING Draft Communication Letter to BLGU for CBSRIP Survey Activities December 19, 2024 100 December 19, 2024
 
8295 ESPADERA, MA LOURDES PLANNING Checked Plotted Data of Survey Personnel (PRIS Modernization) December 19, 2024 100 December 19, 2024
 
8296 ESPADERA, MA LOURDES PLANNING Update Survey Personnel Plotting Accomplishment December 19, 2024 100 December 19, 2024
 
8297 ESPADERA, MA LOURDES PLANNING Train Survey Personnel Civil 3D (Generation of Surface, Profile and Cross Section) December 19, 2024 100 December 19, 2024
 
8298 ESPADERA, MA LOURDES PLANNING Draft Communication Letter to RIO - Re: Consultation Meeting with Matanao Municipal Mayor for Asbang SRIP December 20, 2024 100 December 20, 2024
 
8299 ESPADERA, MA LOURDES PLANNING Facilitate preparation for Survey Team Year End Assessment December 20, 2024 100 December 20, 2024
 
8300 ESPADERA, MA LOURDES PLANNING Conduct/ Supervise Surveying Activities at Cogon Bacaca SRIP December 23, 2024 100 December 23, 2024
 
8301 ESPADERA, MA LOURDES PLANNING Plotted Cogon Bacaca SRIP Proposed Realignment Survey Data December 26, 2024 100 December 26, 2024 23%
 
8302 ESPADERA, MA LOURDES PLANNING Prepare Inventory of Parcellary Survey Data December 26, 2024 100 December 26, 2024 50%
 
8303 ESPADERA, MA LOURDES PLANNING Check and Conform JO Survey Personnel WAR and DTR December 26, 2024 100 December 26, 2024
 
8305 ESPADERA, MA LOURDES PLANNING Miscellaneous Works: Requested TR and Trip Ticket for Survey Activity; Train G. Luardo Labelling and Plotting of Survey Data; Coordinate with Engr. Nierre for Survey Personnel Activities December 26, 2024 100 December 26, 2024
 
8306 ESPADERA, MA LOURDES PLANNING Check and Conform Casual Survey Personnel WAR and DTR December 27, 2024 100 December 27, 2024
 
8307 ESPADERA, MA LOURDES PLANNING Prepare Inventory of Parcellary Survey Data December 27, 2024 100 December 27, 2024
 
8308 ESPADERA, MA LOURDES PLANNING Update and submit Survey Accomplishment of FY 2026 Projects/ Modernization December 27, 2024 100 December 27, 2024
 
8309 ESPADERA, MA LOURDES PLANNING Prepare WAR and DTR for the whole month of December December 27, 2024 100 December 27, 2024
 
8310 ESPADERA, MA LOURDES PLANNING Participated in Salamat at Pagpupugay Ceremony of Nanay Silva December 27, 2024 100 December 27, 2024
 
8311 ESPADERA, MA LOURDES PLANNING Conduct Survey at NIA - DDS IMO December 27, 2024 100 December 27, 2024
 
8312 ESPADERA, MA LOURDES PLANNING Plotted Cogon Bacaca SRIP Proposed Realignment Survey Data January 2, 2025 0 N/A
 
8313 ESPADERA, MA LOURDES PLANNING Draft Letter for Renewal of Survey Team JO Personnel January 3, 2025 0 N/A
 
8314 ESPADERA, MA LOURDES PLANNING Edit presentation for PDU Regional Assessment this January 8-10, 2024 January 3, 2025 0 N/A
 
8315 ESPADERA, MA LOURDES PLANNING Plotted Cogon Bacaca SRIP Proposed Realignment Survey Data January 3, 2025 0 N/A
 
8384 SASUMAN, MARY LOUISE J. PLANNING Attend fag raising ceremony. January 6, 2025 100 January 6, 2025
 
8385 SASUMAN, MARY LOUISE J. PLANNING Prepare powerpoint presentation for the Planning and Design Assessment and Strategic Planning for CY 2025. January 6, 2025 100 January 6, 2025
 
8386 SASUMAN, MARY LOUISE J. PLANNING Prepare and submit IPCR, PDS, and SALN. January 7, 2025 100 January 7, 2025 Completed.
 
8387 SASUMAN, MARY LOUISE J. PLANNING Attend virtual meeting with the Inventory and Valuation Committee (IVC) Members for the base cost establishment of the affected structures of Cogon Bacaca SRIP for LARP Formulaton. January 7, 2025 100 January 7, 2025 Completed.
 
8388 SASUMAN, MARY LOUISE J. PLANNING Finalize the powerpoint presentation for the Planning and Design Assessment and Strategic Planning for CY 2025. January 8, 2025 100 January 8, 2025
 
8389 SASUMAN, MARY LOUISE J. PLANNING Attend Planning and Design Assessment and Strategic Planning for CY 2025 at NIA RXI Regional Office. January 9, 2025 100 January 9, 2025 Completed.
 
8390 SASUMAN, MARY LOUISE J. PLANNING Attend Planning and Design Assessment and Strategic Planning for CY 2025 at NIA RXI Regional Office. January 10, 2025 100 January 10, 2025 Completed.
 
8483 EUGENIO, VENANN PLANNING Check LUC and TOT applications for Printing. Prepare Layout maps for FVR and POW attachment. December 16, 2024 100 December 16, 2024
 
8484 EUGENIO, VENANN PLANNING Engineering, Operation & IDU Assessment (December 17-18, 2024) December 18, 2024 100 December 18, 2024
 
8485 EUGENIO, VENANN PLANNING Conduct Water Balance Analysis for Sacub River. Edit write-up of Water Balance Analysis for PRIS Modernization. December 20, 2024 100 December 20, 2024
 
8486 EUGENIO, VENANN PLANNING Conduct inspection for LUC application at Calinan, Davao City. Prepare shapefile of Sitio Lenna SIP New Pipe Alignment as per New Irrigation Network. December 23, 2024 100 December 23, 2024
 
8487 EUGENIO, VENANN PLANNING Prepare tables of computed irrigable area of Padada RIS based on the calibrated discharge of each source for the PRIS Modernization FSR. December 26, 2024 100 December 26, 2024
 
8488 EUGENIO, VENANN PLANNING Check LUC and TOT applications for Printing. Prepare Layout maps for FVR and POW attachment. December 27, 2024 100 December 27, 2024
 
8489 EUGENIO, VENANN PLANNING Compute water balance for Banana under PRIS Modernization; Generate catchment area of Admol Spring-Asinan SIP; Update PDS and SALN; Process LUC and TOT applications. January 2, 2025 100 January 2, 2025
 
8490 EUGENIO, VENANN PLANNING Prepare BTOR for the Review, Update, and Refinement of the Process Flow of the Planning and Design Section of NIA XI’s Regional Office and Irrigation Management Offices (IMOs); repare BTOR for the Workshop on the Updating of the Geodatabase of Irrigation January 3, 2025 100 January 3, 2025
 
8491 EUGENIO, VENANN PLANNING Process LUC and TOT applications; Process TEV; Print and submit PDS and SALN; Update write-up of Water Balance Analysis for Padada RIS Modernization. January 6, 2025 100 January 6, 2025
 
8492 EUGENIO, VENANN PLANNING Contact applicants for LUC; Process LUC and TOT applications; Update write-up of Water Balance Analysis for Padada RIS Modernization January 7, 2025 100 January 7, 2025
 
8493 EUGENIO, VENANN PLANNING Prepare and submit IPCR; Process LUC and TOT applications. January 8, 2025 100 January 8, 2025
 
8494 EUGENIO, VENANN PLANNING Contact Hotels for the Lodging of Pump Test Activity Attendees from other IMOs; Prepare Communication Letter for Laposa and Basisfia for the Pump Testing Activity; Assist TOT applicant. January 9, 2025 100 January 9, 2025
 
8497 EUGENIO, VENANN PLANNING Conduct inspection for LUC Applicataion at Brgy. Bunot, Kiblawan, Davao del Sur; Flu Vaccination. January 10, 2025 100 January 10, 2025
 
8498 EUGENIO, VENANN PLANNING Attend discussion on the Pump Testing Activity; Assist IMO's in Hotel Check In. January 13, 2025 100 January 13, 2025
 
8499 EUGENIO, VENANN PLANNING Participate in the Trial Pump Test at Padada RIS January 14, 2025 100 January 14, 2025
 
8500 EUGENIO, VENANN PLANNING 60% - Update write-up of Water Balance Analysis for Padada RIS Modernization; Check layout maps for POW attachment; Check LUC and TOTs for printing. January 15, 2025 100 January 15, 2025
 
8501 EUGENIO, VENANN PLANNING Settle payment for other IMOs lodging/accomodation at Avenue 2 Hotel; Prepare and submit DTR; Attend in the Exit Conference of the Pump Testing Activity for the Padada RIS Modernization. January 16, 2025 100 January 16, 2025
 
8502 EUGENIO, VENANN PLANNING Check Mal RIS drainage network tracking output; Prepare location map of existing irrigation systems within Davao River Basin; Prepare layout map for NIA Certification attachment. January 17, 2025 100 January 17, 2025
 
8503 EUGENIO, VENANN PLANNING Attend NIA DDS IMO 2025 Ushering; Compute measured discharge of Padada RIS sources from cu.m to MCM; Check daily tracking output for Mal RIS drainage network; Identify 50 hectares potential expansion area of New Katipunan CIS. January 20, 2025 100 January 20, 2025
 
8504 EUGENIO, VENANN PLANNING Generate watershed of Proposed Project at Napan, Digos City; Prepare communication letters; Prepare proposal; Compute water duty mung bean for Padada RIS Modernization. January 21, 2025 100 January 21, 2025
 
8505 EUGENIO, VENANN PLANNING Prepare layout maps for LUC and TOT attachment; Process LUC and TOT applications; Convert mapping data for Cogon Bacaca SRIP LARP/F; Check daily tracking output for Mal RIS drainage network. January 22, 2025 100 January 22, 2025
 
8506 EUGENIO, VENANN PLANNING 85% - Update write-up of Water Balance Analysis for Padada RIS Modernization; Assist in the presentation of the Cogon Bacaca LARP Activity; Check daily tracking output for Mal RIS drainage network. January 23, 2025 100 January 23, 2025
 
8507 EUGENIO, VENANN PLANNING Update write-up of Water Balance Analysis for Padada RIS Modernization; 60% - Update Annex 4 of PIMPs; Check daily tracking output for Mal RIS drainage network. January 24, 2025 100 January 24, 2025
 
8508 EUGENIO, VENANN PLANNING 80% - Update Annex 6 of the PIMP of 3 provinces; 100% - Update Annex 4 of the PIMP of 3 provinces; Process LUC applications. January 27, 2025 100 January 27, 2025
 
8509 EUGENIO, VENANN PLANNING 100% - Update Annex 6 of the PIMP of 3 provinces; 100% - Submit Annex 4 and 6 of the PIMP of 3 provinces; 100% - Prepare Presentation for Coordinataion Meeting. January 28, 2025 100 January 28, 2025
 
8510 EUGENIO, VENANN PLANNING Attend Coordination Meeting January 30, 2025 100 January 30, 2025
 
8511 EUGENIO, VENANN PLANNING Prepare Documents to be submitted as required during the Coordination Meeting; Prepare layout maps requested by O&M Unit. January 31, 2025 100 January 31, 2025
 
8548 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony January 6, 2025 100 January 6, 2025
 
8549 CUICO, JHO-ANN A. PLANNING Prepared PDS and SALN January 6, 2025 100 January 6, 2025 completed
 
8550 CUICO, JHO-ANN A. PLANNING Plotted Unifarm CIS Proposed Alignment for 2026 Project January 6, 2025 35 January 6, 2025 On-going
 
8551 CUICO, JHO-ANN A. PLANNING Prepared layout Map for POW Attachments - Sampaguita CIS January 7, 2025 100 January 7, 2025 Completed
 
8552 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents January 7, 2025 100 January 7, 2025 completed
 
8553 CUICO, JHO-ANN A. PLANNING Plotted Unifarm CIS Proposed Alignment for 2026 Project January 7, 2025 50 January 7, 2025 On-going
 
8705 EUGENIO, VENANN PLANNING Prepare 10 Year plan March 6, 2025 0 N/A
 
9019 INTO, LEE WARREN PLANNING Attend flag raising ceremony. July 14, 2025 100 July 14, 2025 Attended on time.
 
9020 HERNAN, ALDEN PLANNING Design of Sulop CIS Dam Protection Works ( Upstream & Downstream) September 9, 2025 100 July 9, 2025 Design of Protection Works @ Upstream (0+000.00-0+010.00) & Downstream (0+000.00-0+020.00) compeleted; Design for Drafting
 
9023 HERNAN, ALDEN PLANNING (1)Flag Ceremony(2)Attend live streaming of MOU ( NIA & PNP) July 7, 2025 100 July 7, 2025 Completed
 
9026 INTO, LEE WARREN PLANNING Drafting and polishing of Mal RIS LMC Lateral B FY 2026 DED July 14, 2025 100 July 14, 2025 Completed and printed draft for final review by designer.
 
9029 INTO, LEE WARREN PLANNING Drafting and polishing of Mal RIS LMC Lateral D1 FY 2026 DED July 14, 2025 100 July 14, 2025 Completed and printed draft for final review by designer.
 
9030 INTO, LEE WARREN PLANNING Drafting and polishing of Mal RIS LMC Lateral D FY 2026 DED July 14, 2025 100 July 14, 2025 Completed and printed draft for final review by designer.
 
9033 INTO, LEE WARREN PLANNING Comply RIO comments on Padada RIS Service Road Along MDR (Modernization DED) July 18, 2025 80 July 17, 2025 Forwarded dwg files and e-copy of RIO comments to draftsman. Gave instructions, guided and provided necessary data. Status of DED: on-going labeling of Cut and Fill areas on cross-sections.
 
9034 INTO, LEE WARREN PLANNING Prepare FSDE Report as of July 15, 2025 July 15, 2025 100 July 15, 2025 Prepared and submitted advance e-copy to RIO via email.
 
9035 INTO, LEE WARREN PLANNING Comply RIO comments on Padada RIS Service Road Along DRD (Modernization DED) July 18, 2025 75 July 17, 2025 Forwarded dwg files and e-copy of RIO comments to draftsman. Gave instructions, guided and provided necessary data. Status of DED: on-going labeling of Cut and Fill areas on cross-sections.
 
9036 INTO, LEE WARREN PLANNING Comply RIO comments on Padada RIS DRM Drainage (Modernization DED) July 18, 2025 50 July 17, 2025 On-going redesigning of turn-outs. Modification of a certain portion of the canal with inconsistent base width.
 
9037 ESPADERA, MA LOURDES PLANNING Submit Pagan SRIP Survey Report July 7, 2025 100 July 7, 2025
 
9038 ESPADERA, MA LOURDES PLANNING Submit IPCR and IPCR of Survey Team July 10, 2025 100 July 10, 2025
 
9039 ESPADERA, MA LOURDES PLANNING Submit DTR and WAR July 7, 2025 100 July 7, 2025
 
9041 ESPADERA, MA LOURDES PLANNING Update Survey Team Accomplishment, Conform DTR and War of Survey Personnel July 1, 2025 100 July 1, 2025
 
9043 ESPADERA, MA LOURDES PLANNING Prepare Map Layout for Mamacao CIS July 11, 2025 100 July 11, 2025
 
9044 ESPADERA, MA LOURDES PLANNING Attend Tree Planting Activity at Brgy Asbang, Matanao July 11, 2025 100 July 11, 2025
 
9045 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag raising ceremony. July 7, 2025 100 July 7, 2025 Attended.
 
9046 ENCABO, PRINCESS SHAIRA MAE PLANNING Nursery visitation. July 7, 2025 100 July 7, 2025 Visited both Padada and Mal RIS nursery. Inspected plants and recommended treatments.
 
9047 ENCABO, PRINCESS SHAIRA MAE PLANNING Plantation site monitoring and inspection. July 7, 2025 100 July 7, 2025 Site inspected plantation and reminded landowners re: maintenance of the plants.
 
9048 ENCABO, PRINCESS SHAIRA MAE PLANNING Hauling of seedlings for Tree Planting. July 8, 2025 100 July 8, 2025 Gather fruit-trees from PRIS nursery and trees from CENRO Digos.
 
9049 ENCABO, PRINCESS SHAIRA MAE PLANNING Tree planting site visitation. July 8, 2025 100 July 8, 2025 Visited planting site and facilitated site clearing.
 
9050 ENCABO, PRINCESS SHAIRA MAE PLANNING Nursery visitation July 9, 2025 100 July 9, 2025 Transplanted grown cacao seeds, fertilized/insecticide application of plants therein.
 
9051 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate procurement of materials needed for Tree Planting. July 9, 2025 100 July 9, 2025 Facilitated cash advance and procured materials for tree planting.
 
9052 ENCABO, PRINCESS SHAIRA MAE PLANNING Logistics preparation for tree planting. July 9, 2025 100 July 9, 2025 Completed.
 
9053 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend Thanksgiving ceremony at NIA DDS IMO compound. July 9, 2025 100 July 9, 2025 Completed.
 
9054 ENCABO, PRINCESS SHAIRA MAE PLANNING Deliver seedlings on site at Brgy. Asbang, Matanao. July 10, 2025 100 July 10, 2025 Completed.
 
9055 ENCABO, PRINCESS SHAIRA MAE PLANNING Preparation of materials needed for Tree Planting Activity. July 10, 2025 100 July 10, 2025 Prepared and completed.
 
9056 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend Tree Planting Activity at Brgy. Asbang, Matanao. July 11, 2025 100 July 11, 2025 Attended.
 
9057 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare Report for conducted Tree Planting. July 11, 2025 100 July 11, 2025 Prepared Draft Report. Submitted for checking.
 
9058 EUGENIO, VENANN PLANNING Check, plot, print and process TOT and LUC applications July 11, 2025 100 July 11, 2025
 
9059 EUGENIO, VENANN PLANNING Prepare layout maps and FVRs for LUC applications July 11, 2025 100 July 11, 2025
 
9060 EUGENIO, VENANN PLANNING Assist TOT and LUC applicants July 11, 2025 100 July 11, 2025
 
9061 EUGENIO, VENANN PLANNING Conduct LUC inspection at Davao City July 10, 2025 100 July 10, 2025
 
9062 EUGENIO, VENANN PLANNING Attend virtual meeting for R11 Economists July 11, 2025 100 July 11, 2025
 
9063 EUGENIO, VENANN PLANNING Prepare and submit IPCR July 11, 2025 100 July 11, 2025
 
9066 CUICO, JHO-ANN A. PLANNING Attended Flag Ceremony July 14, 2025 100 July 14, 2025 COMPLETED
 
9067 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony July 14, 2025 100 July 7, 2025 Completed.
 
9068 SASUMAN, MARY LOUISE J. PLANNING Assist in the conduct of georesistivity survey for the propose Pump Irrigation Projects (PIPs) in Brgy. Talomo River and Brgy. Dacudao, Calinan, Davao City. July 15, 2025 100 July 15, 2025 Completed.
 
9069 SASUMAN, MARY LOUISE J. PLANNING Assist in the conduct of georesistivity survey for the propose Pump Irrigation Projects (PIPs) in Brgy. Talomo River and Brgy. Dacudao, Calinan, Davao City. July 16, 2025 100 July 16, 2025 Completed.
 
9070 CAYABYAB, REY JIM PLANNING Attend flag raising ceremony July 14, 2025 100 July 14, 2025
 
9071 SASUMAN, MARY LOUISE J. PLANNING Assist in the conduct of georesistivity survey for the propose Pump Irrigation Projects (PIPs) in Brgy. Talomo River and Brgy. Dacudao, Calinan, Davao City. July 17, 2025 100 July 17, 2025 Completed.
 
9072 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag raising ceremony. July 14, 2025 100 July 14, 2025
 
9078 HERNAN, ALDEN PLANNING Design of Sulop CIS Dam Protection Works @ upstream (0+000.00-0+010.00) & Downstream (0+000.00-0+020.00) July 9, 2025 100 July 9, 2025 Completed
 
9079 HERNAN, ALDEN PLANNING Participate NIA DDS Thanksgiving celebration @ NIS DD Compund July 9, 2025 100 July 9, 2025 Completed
 
9080 HERNAN, ALDEN PLANNING Drafting of designedof Sulop CIS Dam Protection Works @ upstream (0+000.00-0+010.00) & Downstream (0+000.00-0+020.00) July 11, 2025 30 July 9, 2025 ONGOING drafting of designed of Sulop CIS Dam Protection Works @ upstream (0+000.00-0+010.00) & Downstream (0+000.00-0+020.00)
 
9081 HERNAN, ALDEN PLANNING Drafting of designedof Sulop CIS Dam Protection Works @ upstream (0+000.00-0+010.00) & Downstream (0+000.00-0+020.00) July 11, 2025 70 July 11, 2025 ONGOING drafting of designed of Sulop CIS Dam Protection Works @ upstream (0+000.00-0+010.00) & Downstream (0+000.00-0+020.00)
 
9084 HERNAN, ALDEN PLANNING Participate in Tree PLanting Activity held in at Asbang, Matanao, DDS July 11, 2025 100 July 11, 2025 Completed
 
9085 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony July 14, 2025 100 July 14, 2025
 
9086 LUARDO, GLENN D. PLANNING Prepared and Submitted Revised PPMP of Planning and Design Unit for 1st Sem of CY 2025 July 14, 2025 100 July 14, 2025 Completed and Submitted to PPU for review and consolidation. Other Accomplishment: Encoded partial data gathered from Brgy. Cogon Bacaca regarding the PAPs/PAFs of the proposed Cogon Bacaca SRIP (100%).
 
9087 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents July 14, 2025 100 July 14, 2025 Completed
 
9088 CUICO, JHO-ANN A. PLANNING Prepared Liquidation Report of tentative Daily Travel Expense on July 2-4, 2025 for the attendance to the 62nd Anniversary at Cavanico II MAre at Samal Island, Davao del Norte (Planning Only) July 14, 2025 100 July 14, 2025 completed
 
9089 CUICO, JHO-ANN A. PLANNING Prepared Parcellary Map of BASIAWAN SIP with tabulated Landowners Name, Crops on field, Area (has.), (Requested by: Sir Benjie for Site Monitoring) July 14, 2025 100 July 14, 2025 Completed
 
9090 LUARDO, GLENN D. PLANNING Encode, Consolidate and generate tables of all 47 PAPs/PAFs data located at Damsite, Submerge Area, and Access Road of the proposed Cogon Bacaca SRIP as per comment of NIA CO for LARP. July 17, 2025 100 July 17, 2025 07/15/25-Prepared DTR for July 1-15, 2025 (100%), Encoded Inventory of NIS, CIS, PIS, & OGA on PSA (70%) template; 07/16/25-Encoded Inventory of NIS, CIS, PIS, & OGA on PSA (100%) template, Prepared PIR for 7 (SRIP/SIP) (30%); 07/17/25-Prepared PIR for 7
 
9091 MARTURILLAS, JOHN LLOYD PLANNING Technical Discussion of Suawan SRIP LiDAR Survey Data at NIA Regional Office XI July 14, 2025 100 July 14, 2025 completed
 
9093 ENCABO, PRINCESS SHAIRA MAE PLANNING Nursery visitation. July 14, 2025 100 July 14, 2025 - Facilitated removal of damaged nets, seedbeds, and unused seed bags. - Installed signages at nursery
 
9094 ENCABO, PRINCESS SHAIRA MAE PLANNING Plantation and site monitoring. July 14, 2025 100 July 14, 2025 Site visited plantation sites and coordinated with landowner for the weeding maintenance.
 
9095 ENCABO, PRINCESS SHAIRA MAE PLANNING Nursery visitation. July 15, 2025 100 July 15, 2025 - Transplanted 350 grown cacao seedlings. - Re-arranged seedlings within nursery. - Facilitated welding of new seedbed frames.
 
9096 ENCABO, PRINCESS SHAIRA MAE PLANNING Plantation and site monitoring. July 15, 2025 100 July 15, 2025 - Facilitated staking of flaglets and reminded landowners re: Weeding of their plantation sites.
 
9100 HERNAN, ALDEN PLANNING Continue Drafting of Designed Sulop Dam Protection Works @ upstream (0+000.00-0+020.00) & Downstream (0+020.00) July 15, 2025 95 July 15, 2025 Ongoing
 
9101 HERNAN, ALDEN PLANNING Design & Draft Sulop Dam Structure ( Modification of Check Structure-Heigtening) July 17, 2025 0 N/A
 
9102 CUICO, JHO-ANN A. PLANNING Prepared Liquidation Report of tentative Daily Travel Expense on July 2-4, 2025 for the attendance to the 62nd Anniversary at Cavanico II MAre at Samal Island, Davao del Norte (Planning Only) July 14, 2025 100 July 14, 2025 Completed
 
9103 CUICO, JHO-ANN A. PLANNING Delinated Shapefiles / Prepared Layout Map for Detailed Engineering Design Attachment July 14, 2025 100 July 14, 2025 Completed
 
9104 CUICO, JHO-ANN A. PLANNING Prepared Parcellary Map of BASIAWAN SIP with tabulated Landowners Name, Crops on field, Area (has.), (Requested by: Sir Benjie for Site Monitoring) July 15, 2025 100 July 15, 2025 Completed
 
9105 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents July 15, 2025 100 July 15, 2025 Completed
 
9106 CUICO, JHO-ANN A. PLANNING Delineated Shapefiles / Prepared Layout Map for Detailed Engineering Design Attachment July 15, 2025 100 July 15, 2025 Completed
 
9107 CUICO, JHO-ANN A. PLANNING Attended internal meeting of Project Identification Report July 15, 2025 100 July 15, 2025 Completed
 
9110 ENCABO, PRINCESS SHAIRA MAE PLANNING Collect DTR and prepare payrolls for PRIS and MRIS nursery personnel. July 16, 2025 100 July 16, 2025 Completed.
 
9111 ENCABO, PRINCESS SHAIRA MAE PLANNING Cutting of metal to be use in seedbed frame. July 16, 2025 100 July 16, 2025 Oversee and facilitated the task.
 
9112 ENCABO, PRINCESS SHAIRA MAE PLANNING Process liquidation of cash advance for the conducted Tree Planting Activity. July 16, 2025 100 July 16, 2025 Completed. For signing.
 
9113 ENCABO, PRINCESS SHAIRA MAE PLANNING Oversee crafting of seedbed frames. July 17, 2025 100 July 17, 2025 Completed. Finished 4 seedbed frames.
 
9114 CAYABYAB, REY JIM PLANNING Prepare communication letters (for PAPs and Municipalities) with regards to the conducted of Parcellary Mapping at Cogon Bacaca SRIP July 21, 2025 100 July 21, 2025
 
9115 ENCABO, PRINCESS SHAIRA MAE PLANNING Nursery visitation and inspection. July 17, 2025 100 July 17, 2025 Completed. Facilitated new arrangement of seedlings.
 
9117 CAYABYAB, REY JIM PLANNING PIR- Flow Duration Curve and irrigation diversion requirement of proposed projects under FSDE July 25, 2025 100 July 25, 2025
 
9118 CAYABYAB, REY JIM PLANNING Route proposal for the conduct of Parcellary Survey of CBSRIP July 21, 2025 100 July 21, 2025
 
9119 CUICO, JHO-ANN A. PLANNING Project Identification Reports - Mapping and Layouts July 25, 2025 0 N/A
 
9120 INTO, LEE WARREN PLANNING Assist on the crafting of San Isidro CIS FY 2026 DED - Protection Works. July 18, 2025 75 July 17, 2025 Guided and instructed draftsman in crafting the cross-sections of the upstream protection dike. Generated downstream profile and crafted end wall structures. Consolidated and polished drafts. On-going crafting of downstream cross sections.
 
9121 EUGENIO, VENANN PLANNING Prepare data for FY 2026 FSDE PIR Updating and GDrive for consolidation and progress monitoring. July 15, 2025 100 July 15, 2025
 
9123 EUGENIO, VENANN PLANNING Finalize MOA for LUC application between LV Ledesma Corp., MISAI and NIA July 17, 2025 100 July 17, 2025
 
9124 EUGENIO, VENANN PLANNING Process TOT and LUC Applications; Contact and assist TOT and LUC applicants. July 17, 2025 100 July 17, 2025
 
9125 EUGENIO, VENANN PLANNING Prepare FVR and layout maps for TOT and FVR attachment. July 17, 2025 100 July 17, 2025
 
9128 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map July 15, 2025 3 July 15, 2025 on-going
 
9129 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map July 16, 2025 6 July 16, 2025 on-going
 
9130 MARTURILLAS, JOHN LLOYD PLANNING Plotting of Suawan SRIP Topographic Map July 17, 2025 10 July 17, 2025 on-going
 
9131 MARTURILLAS, JOHN LLOYD PLANNING Plotting of 2 LUC Applications July 15, 2025 100 July 15, 2025 completed
 
9133 CUICO, JHO-ANN A. PLANNING Delineated Shapefiles / Prepared Layout Map for Detailed Engineering Design Attachment July 16, 2025 100 July 16, 2025 Completed
 
9134 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents July 16, 2025 100 July 16, 2025 Completed
 
9135 CUICO, JHO-ANN A. PLANNING Prepared Parcellary Map of SAMPAGUITA CIS with tabulated Landowners Name, Crops on field, Area (has.), (Requested by: Sir Benjie for Site Monitoring) July 16, 2025 100 July 16, 2025 Completed
 
9136 CUICO, JHO-ANN A. PLANNING Consolidated Data and Shapefiles for Project Identification Report (PIR) Requirements July 16, 2025 100 July 16, 2025 Completed
 
9137 CUICO, JHO-ANN A. PLANNING Delineated Shapefiles / Prepared Layout Map for Detailed Engineering Design Attachment July 17, 2025 100 July 17, 2025 Completed
 
9138 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents July 17, 2025 100 July 17, 2025 Completed
 
9139 CUICO, JHO-ANN A. PLANNING Prepared Parcellary Map of SINAWILAN SIP with tabulated Landowners Name, Crops on field, Area (has.), (Requested by: Sir Benjie for Site Monitoring) July 17, 2025 100 July 17, 2025 Completed
 
9140 CUICO, JHO-ANN A. PLANNING Consolidated Data and Shapefiles for Project Identification Report (PIR) Requirements - Chapter 1 July 17, 2025 100 July 17, 2025 Completed
 
9141 CUICO, JHO-ANN A. PLANNING H O L I D A Y July 18, 2025 0 N/A
 
9142 CAYABYAB, REY JIM PLANNING Tabulate data for the conducted detailed inventory of assets in the proposed borrow area of Cogon Bacaca SRIP July 14, 2025 100 July 14, 2025
 
9143 CAYABYAB, REY JIM PLANNING Review the Draft ROW Acquisition Manual for the conduct of necessary activities relevant to Cogon Bacaca SRIP LARP July 15, 2025 100 July 15, 2025
 
9144 CAYABYAB, REY JIM PLANNING Draft a budget proposal for the conduct of parcellary survey for Cogon Bacaca SRIP July 16, 2025 100 July 16, 2025
 
9145 CAYABYAB, REY JIM PLANNING Prepare a communication letter to MIBASFECIA re: Schedule of coordination meeting July 17, 2025 100 July 17, 2025
 
9146 CAYABYAB, REY JIM PLANNING Prepare a communication letter to Davao Occidental DEO re: Proposed NIA-DPWH convergence projects July 17, 2025 100 July 17, 2025
 
9147 LUARDO, GLENN D. PLANNING Attended and Participated in Flag Raising Ceremony. July 21, 2025 0 N/A
 
9148 LUARDO, GLENN D. PLANNING Prepare PIR for 7 proposed Small Reservoir Irrigation Project (SRIP) and Small Irrigation Project (SIP). July 25, 2025 0 N/A
 
9149 ESPADERA, MA LOURDES PLANNING Attended InDepth Discussion for Suawan SRIP Survey Data at RIO July 14, 2025 100 July 14, 2025
 
9152 ESPADERA, MA LOURDES PLANNING Checked and Finalized Plotted Parcellary Survey Data of OJTs July 16, 2025 100 July 16, 2025
 
9153 ESPADERA, MA LOURDES PLANNING Drafted Task Letter to Survey Personnel July 16, 2025 100 July 16, 2025
 
9154 ESPADERA, MA LOURDES PLANNING Drafted Request of Additional Survey Personnel July 16, 2025 100 July 16, 2025
 
9156 ESPADERA, MA LOURDES PLANNING Prepared Travel Documents for Upper Cabasagan CIS and Padada CIS July 17, 2025 100 July 17, 2025
 
9157 ESPADERA, MA LOURDES PLANNING Update Survey Team Weekly Accomplishment, Conform DTR and War of Survey Personnel July 15, 2025 100 July 15, 2025
 
9158 ESPADERA, MA LOURDES PLANNING Prepared Communication Letter to Davao Oriental for the Provision of 1 set of RTK for the upcoming Parcellary Survey at Cogon Bacaca SRIP July 17, 2025 100 July 17, 2025
 
9159 ESPADERA, MA LOURDES PLANNING Prepared Presentation for the Upcoming Survey Activities of Asbang SRIP and Cogon Bacaca SRIP July 25, 2025 90 July 25, 2025
 
9160 ESPADERA, MA LOURDES PLANNING Prepare PDU Weekly Accomplishment July 17, 2025 100 July 17, 2025
 
9161 ESPADERA, MA LOURDES PLANNING Prepare own TEV and WAR July 15, 2025 100 July 15, 2025
 
9162 INTO, LEE WARREN PLANNING Attend Embankment Design Training at MTC building, NIA RIO. July 25, 2025 100 July 25, 2025 Attended and participated 5-day training.
 
9163 ESPADERA, MA LOURDES PLANNING Assist in the Preparation of Project Investigation Report July 31, 2025 100 July 31, 2025
 
9186 CUICO, JHO-ANN A. PLANNING Attended Flag Raising Ceremony July 21, 2025 100 July 21, 2025 Completed
 
9187 CUICO, JHO-ANN A. PLANNING Delineated Shapefiles / Prepared Layout Map for Detailed Engineering Design Attachment July 21, 2025 100 July 21, 2025 Completed
 
9188 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents July 21, 2025 100 July 21, 2025 Completed
 
9189 SASUMAN, MARY LOUISE J. PLANNING Prepare Certification of Commercial Sand and Gravel July 21, 2025 100 July 21, 2025 Completed.
 
9190 SASUMAN, MARY LOUISE J. PLANNING Prepare PIR for 7 proposed Small Reservoir Irrigation Project (SRIP) and Small Irrigation Project (SIP) July 25, 2025 60 July 25, 2025 July 21-25, 2025: Ongoing preparation and consolidation of PIR
 
9191 INTO, LEE WARREN PLANNING Attend Flag Raising Ceremony July 28, 2025 100 July 28, 2025 Attended on time.
 
9192 SASUMAN, MARY LOUISE J. PLANNING Prepare and consolidate ppt presentation for Execom. July 28, 2025 100 July 28, 2025 Completed.
 
9193 CUICO, JHO-ANN A. PLANNING Consolidated Data and Shapefiles for Project Identification Report (PIR) Requirements - III. PRELIMINARY ENGINEERING DATA July 21, 2025 10 July 21, 2025 Completed
 
9194 INTO, LEE WARREN PLANNING Review the Padada RIS Service Roads: Along DRD, Along MDR and Along B3 as edited by draftsman as per RIO comments. July 31, 2025 0 N/A
 
9195 SASUMAN, MARY LOUISE J. PLANNING Attend flag raising ceremony. July 28, 2025 0 N/A
 
9196 INTO, LEE WARREN PLANNING Prepare Convergence Report for the month of July. July 31, 2025 0 N/A
 
9197 INTO, LEE WARREN PLANNING Prepare the status of convergence projects for the Execom ppt presentation. July 28, 2025 100 July 28, 2025 Completed.
 
9198 SASUMAN, MARY LOUISE J. PLANNING Finalize PIR for proposed Small Reservoir Irrigation Project (SRIP) and Small Irrigation Project (SIP) July 29, 2025 0 N/A
 
9199 CUICO, JHO-ANN A. PLANNING Delineated and Prepared Layout Map of the BALAWANAN RIVER - MAGSAYSAY SRIP - III. PRELIMINARY ENGINEERING DATA (General Layout Map, Tenurial Map, Land Cover Map) July 22, 2025 100 July 21, 2025 Completed
 
9200 CUICO, JHO-ANN A. PLANNING Received, Record, Reproduce, Field and distribute engineering Documents July 22, 2025 0 N/A
 
9201 CUICO, JHO-ANN A. PLANNING Delineated Shapefiles / Prepared Layout Map for Detailed Engineering Design Attachment July 22, 2025 0 N/A
 
9202 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag raising ceremony. July 21, 2025 100 July 21, 2025 Attended.
 
9203 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate replacement of dilapidated seedbed frames in nursery. July 21, 2025 100 July 21, 2025 Completed. Installed 9 seedbed frames.
 
9204 ENCABO, PRINCESS SHAIRA MAE PLANNING Arrange and organized nursery materials and fertilizers within nursery storage. July 21, 2025 100 July 21, 2025 Completed, added new storage cabinet.
 
9205 ENCABO, PRINCESS SHAIRA MAE PLANNING Prepare IWRMP Progress Report for the month of July 2025. July 22, 2025 100 July 22, 2025 Completed and submitted.
 
9206 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate field activities as part of plantation maintenance of Year 1 and 2. July 22, 2025 100 July 22, 2025 Facilitated flaglet staking, inventory and tree height measurement at Malabang plantation sites.
 
9207 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. July 23, 2025 100 July 23, 2025 Conducted site inspection at Brgy. La Union, Hagonoy and Brgy. Langa-an, Matanao plantation sites.
 
9208 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate field activities in Padada and Mal RIS. July 23, 2025 100 July 23, 2025 Facilitated inventory at La Union, Langa-an and Saub, plantation sites; Inspected plant nursery status and lacking.
 
9209 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. July 24, 2025 100 July 24, 2025 Site inspected plantations at Brgy. Clib, Hagonoy and Mahayahay, Hagonoy.
 
9210 ENCABO, PRINCESS SHAIRA MAE PLANNING Site inspection and monitoring of plantation sites. July 25, 2025 100 July 25, 2025 Site inspected plantation at Brgy. San Miguel, Matanao.
 
9211 ENCABO, PRINCESS SHAIRA MAE PLANNING Receive delivery of nursery supplies and materials. July 25, 2025 100 July 25, 2025 Received 40 sacks coco peat, 34 sacks garden soil, 10 bamboo basket, and 4kg of African night crawler worms.
 
9212 ENCABO, PRINCESS SHAIRA MAE PLANNING Attend flag raising ceremony. July 28, 2025 100 July 28, 2025 Attended.
 
9213 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate nursery activities. July 28, 2025 100 July 28, 2025 Facilitated hauling of coco peat, bukag, garden soil and vermi for Padada and Mal RIS nursery.
 
9214 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate preparation of nursery and plantation sites for CO Semestral visitation and inspection. July 29, 2025 100 July 29, 2025 Facilitated site clearing of plantation and removal of damaged shade net, for replacement.
 
9215 HERNAN, ALDEN PLANNING ATTEND EMBANKMENT DAM DESIGN AT NIA XI-RIO , BOLTON EXT., DAVAO CITY July 25, 2025 0 N/A
 
9216 HERNAN, ALDEN PLANNING ATTEND EMBANKMENT DAM DESIGN AT NIA XI-RIO , BOLTON EXT., DAVAO CITY July 25, 2025 100 July 25, 2025 COMPLETED
 
9226 ENCABO, PRINCESS SHAIRA MAE PLANNING Facilitate PR for the upcoming RPWRSIS Semestral Assessment. July 30, 2025 100 July 30, 2025 Completed. PR For signing.
 
9227 ENCABO, PRINCESS SHAIRA MAE PLANNING Monitor ongoing progress of nursery (PRIS and MRIS). July 30, 2025 100 July 30, 2025 Successfully installed new garden shade net, put label on the nursery storage, and facilitated bagging of soil media as well as transplanting of grown seedlings.
 
9228 ENCABO, PRINCESS SHAIRA MAE PLANNING Site monitoring and inspection. July 31, 2025 100 July 31, 2025 Inspected and prepared the plantation sites for CO visitation.
 
9229 ENCABO, PRINCESS SHAIRA MAE PLANNING Conduct nursery visitation and other field activities. July 31, 2025 100 July 31, 2025 Facilitated fertilizer application on nursery plants, bagging of soil media, pruning of unwanted leaves, and removal of damaged seedlings.
 
9231 INTO, LEE WARREN PLANNING Prepared an estimate for the provision of additional access at Conference Building. August 1, 2025 100 July 31, 2025 Forwarded the estimate to PPU.
 
9232 ESPADERA, MA LOURDES PLANNING Revised Padada RIS Expansion Area Topographic Map July 30, 2025 100 July 30, 2025
 
9233 INTO, LEE WARREN PLANNING Prepared an estimate for the provision of partition walls in the Female's CR at the Conference Building. August 1, 2025 100 July 31, 2025 Forwarded the estimate to PPU.
 
9234 ESPADERA, MA LOURDES PLANNING Update Survey Team Weekly Accomplishment and Check & Conform thier DTRs and WARs August 1, 2025 100 August 1, 2025
 
9235 INTO, LEE WARREN PLANNING Worked on the Revision of Padada RIS Modernization: Expansion Area Irrigation Network. August 1, 2025 30 N/A Received Revised Survey data from geodetic engineer. Delineated the design service areas per proposed turn out. Identified drainage creeks. Ongoing crafting of Network.
 
9236 ESPADERA, MA LOURDES PLANNING Revised Topographic Map of Asbang SRIP August 1, 2025 100 August 1, 2025
 
9237 INTO, LEE WARREN PLANNING Prepare Convergence Report for the month of July August 1, 2025 100 August 1, 2025 Completed.
 
9238 ESPADERA, MA LOURDES PLANNING Prepare TEV and WAR, Update Online Monitoring Dashboard August 1, 2025 100 August 1, 2025
 
9239 ESPADERA, MA LOURDES PLANNING Prepare PDU Weekly Accomplishment August 1, 2025 100 August 1, 2025
 
9240 ESPADERA, MA LOURDES PLANNING Prepare IPCR Target for 2nd Sem 2025 August 1, 2025 100 August 1, 2025
 
9241 ESPADERA, MA LOURDES PLANNING Revised Communication Letter to Davao Oriental IMO re borrowing of RTK for the upcoming parcellary survey at Cogon Bacaca SRIP and Facilitate its conveyance from Davao Oriental IMO July 31, 2025 100 July 31, 2025
 
9250 ESPADERA, MA LOURDES PLANNING Conduct Topographic Survey at Matigol Spring - Ladian SIP August 8, 2025 0 N/A
 
9251 ESPADERA, MA LOURDES PLANNING Prepare Map Test Analysis for Asbang SRIP August 4, 2025 100 August 4, 2025
 
9252 ESPADERA, MA LOURDES PLANNING Prepare Survey Team Travel Documents to Cabacungan CIS August 4, 2025 100 August 4, 2025
 
9253 ESPADERA, MA LOURDES PLANNING Prepare Weekly Task Letter for Mr. Rodriguez and Check Previous Task August 4, 2025 95 August 4, 2025
 
9254 ESPADERA, MA LOURDES PLANNING Prepare Assessment Report for GNSS - RTK August 4, 2025 100 August 4, 2025
 
9255 ESPADERA, MA LOURDES PLANNING Prepare Travel Documents for Matigol Spring - Ladian SIP Survey Activity August 5, 2025 100 August 5, 2025
 
9263 HERNAN, ALDEN PLANNING Design & Draft Sulop CIS Dam Modification/Rehabilitation and Protection Works August 8, 0225 95 N/A ongoinf-for polishing-
 
9264 CAYABYAB, REY JIM PLANNING Continue draft Sulop CIS Diversion Dam-polishing August 11, 2025 0 N/A
 
9265 HERNAN, ALDEN PLANNING Design Main Canal Sulop CIS August 13, 2025 0 N/A
 
9266 HERNAN, ALDEN PLANNING Draft designed Main Canal of Sulop CIS August 11, 2025 0 N/A
 
9271 ESPADERA, MA LOURDES PLANNING Conduct Topographic Survey at Matigol Spring - Ladian SIP August 8, 2025 100 August 8, 2025
 
9282 CAYABYAB, REY JIM PLANNING prepare report August 29, 2025 0 N/A
 
ID Name Unit Tasks Target Date Progress Date Accomplished Remarks Update